Availability
2000 Summit Racing Parts and Accessories
Pro LS 2618 Forged Piston, 3.780 bore, 1.110 C.H., 5cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-1109273780-5
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cam and Lifter kit, Stage 4 Pro LS Cam, Extra Valve Clearance Version, 234/248 113 +3.5 .625/.605 Lift, 3-bolt, 4.8-7.0L ,LS1 LS2 LS6 LS7 LSA LQ9 LS9
Part Number: SUM-K8711R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Combo, Summit, Water Pump, Electric, Aluminum, Natural, Chevy, Small Block, Relay, Kit
Part Number: CMB-12-0011
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Header bolt kit, Extreme Duty, Chromoly, Black Oxide, Chevy LS, 6 pt., Set of 12
Part Number: SUM-910502
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Valve Covers, Circle Track, Tall Height with Baffled BreatherTubes, Centerbolt Mounting, Steel, Black Powdercoated Finish, Chevy, 5.0L, 5.7L, Pair
Part Number: SUM-440855B
Not Yet Reviewed
Estimated Ship Date: Mar 9, 2026 if ordered today
Estimated Ship Date: Mar 9, 2026 if ordered today
Pistons, Forged, Flat, 4.030 in. Bore, Ford, Set of 8
Part Number: SUM-17370FC-30
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 4340 Piston and Rod Kit, 408 Cid., 4.030 bore, 4.000 stroke, 6.125 rod, 20cc dish, 9.8:1 @ 65cc, 9.4:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR4003020
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 2618 Forged Piston, 3.810 bore, 1.110 C.H., 5cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous,Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-1109273810-5
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro SBC Stage 2 Hyd. Flat-Tappet 4/7 Firing Order Swap Cam, 212/218 Dur., 111 LSA + 2 Adv, .428/.450 1.5 Ratio, .456/.480 1.6 Ratio,1000-5550 Range
Part Number: SUM-1201
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Camshaft Kit, Pro LS Single Plane, Hydraulic Roller Tappet, Advertised Duration 290/305, Lift .551/.551, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8704-1
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Guideplates, Flat, 5/16 in. Pushrod Size, Chevy, Small Block, Set of 8
Part Number: SUM-G6450
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Engine Dipstick, Braided Stainless Steel, Tumble Polished, Chevy, Pontiac, LS, Each
Part Number: SUM-122208
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Exhaust Downpipes, Mild Steel, Aluminized, 2.5 in. Diameter, For SUM-G9200/SUM-G9200N Manifolds, Pair
Part Number: SUM-670180
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Bellhousing, Steel, Black, SFI 6.1, Chevy, LSX/LT to TKX / Muncie/T-10, Manual Transmission, Kit
Part Number: SUM-7001103
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Intake Manifold, Fuel Injected, Low Profile, 92mm Bore Size, Aluminum, Satin, Chevy, LS3, L92, Each
Part Number: SUM-226131S-G2
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Brake Rotors, 13 Inch, Cross-Drilled/Slotted, Iron, Zinc Dichromate Plated, Rear, Cadillac, Chevy, GMC, Pair
Part Number: SUM-BRC-66045PR
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Ignition Coil Bracket, Remote Mount LS Ignition Coil Relocation Brackets, Black Powder Coated Steel, Rectangular, Chevy, Kit
Part Number: SUM-852700
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Ignition Combo, Digital Ignition Box with Rev Limiter, Billet Distributor, E-Core Coil, Chevy, Big/Small Block, Kit
Part Number: SUM-CSUM2750
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pistons, Hypereutectic, Flat, 4.060 in. Bore, Chevy, Set of 8
Part Number: SUM-17350C-60
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
LS Coolant Steam Crossover Kit 2, Billet Aluminum, -4AN Braided Stainless Hose, Bypass Hose Kit, W/ Vent Front, Billet Plugs Rear, LS1, LSX, Kit
Part Number: SUM-220963
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Water Pump, Mechanical, Short, High-volume, Clockwise, Aluminum, Black Powdercoated, Chevy, Small Block, Each
Part Number: SUM-310115B
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 2618 Forged Piston, 3.810 bore, 1.110 C.H., 12cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous,Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-110927381012
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Chevy LS, .001 Extra Clearance, Racing 270 Deg. Oil groove, set
Part Number: SUM-7298HXS
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Header Flanges, Steel, 3/8 in. Thick, 1.84 in. x 1.54 in. Oval Port, Chevy, Small Block, Pair
Part Number: SUM-670200
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Shock/Strut, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SUM-G7746
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster