Availability
1999 JEEP CHEROKEE Parts and Accessories
Fluid Cooler Mounting, Steel, Natural, Kit
Part Number: HDA-253
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Idler Pulley, Replacement, Serpentine, 6-groove, Steel, Black, Buick, Chevy, Chrysler, Dodge, Ford, GMC, Jeep, Each
Part Number: ADO-38009
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Steering Damper, Replacement, Black, AMC, Jeep, Each
Part Number: MON-SC2928
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Transmission Mount, Rear, Steel, Black, Jeep, Each
Part Number: CWA-52002334
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Engine Oil, Classic Nineties, Semi-Synthetic, 10W30, 2 Liters, Each
Part Number: MTL-110620
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
CAM BEARING SET
Part Number: DUR-N-7B
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Differential Carrier Bearings, Standard Replacement, Includes Cup, 1.625 in. Bore, AMC, GM, Mopar, Jeep, International, Studebaker, Hummer, Each
Part Number: TMK-SET69
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Lug Nuts, Conical Seat, Bulge, 1/2 in. x 20 RH, Closed End, Locking, Chrome Plated Steel, Set of 4
Part Number: MCG-24130
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Differential Pinion Bearing, 1.375 in. Inside Diameter, Each
Part Number: TMK-HM88649
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Belt, OE Technology Series, Multi-V, Serpentine, 6-Rib, 78.00 in. Length, Each
Part Number: CEL-4060780
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Shock, NX2 Nitro Series, Twin-tube, Jeep, Front, Lifted 2.0 in., Each
Part Number: BDX-BDS85979
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Piston Rings, Cast Iron, 3.875 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 6-Cylinder, Set
Part Number: SLP-E-234X
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
U-Joint Straps, Spicer 1310-Spicer 1330 Combination Style, Differential Location, Kit
Part Number: YGA-41195
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Differential Pinion Seal, Nitrile, Each
Part Number: TMK-5778
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Rear Axle Brake Lines - Fits 97-01 Jeep Cherokee - steel
Part Number: OPS-J1000RAPVF
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Automatic Transmission Kickdown Cable, Black Jacket, Jeep, Each
Part Number: CWA-52077578
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Thermostat, Spec-R, 160 Degrees F, Stainless Steel/Copper, Universal, Each
Part Number: SNN-MRD100
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Headlight Switch, OEM Replacement, Chrysler, Dodge, Jeep, Plymouth, Each
Part Number: SMP-DS357
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Bearing, Roller, Universal, Each
Part Number: NTL-6408
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
SHIFT KIT Valve Body Repair Kit, Torqueflite 3SPD SHIFT KIT® Valve Body Repair Kit
Part Number: TRG-SKTFSC
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Grille, Main Grille, Stock Style, ABS Plastic, Black, Jeep, Each
Part Number: BDY-CH1200209
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Cam Bearings, Direct Replacement, Steel Backed Babbit, AMC, L6, 232, 258, Set
Part Number: SLP-1244M
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Thermostat, Powertech, 180 Degree, Stainless Steel, Each
Part Number: JET-10170
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Oil Pickup, Press Fit, Stock Pan Style, 0.469 in. Tube Diameter, Jeep, 4.0L, Each
Part Number: MEL-242S
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Adjustable Sway Bar End Link Rod (6 1/2 in. Long x 1/2 in. Dia. x 1/2 in.-20 RH/LH Threads)
Part Number: RKJ-CE-9901RD3
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster