Availability
Radiator, Exact Fit, Aluminum, Plastic, Cadillac, Chevy, GMC, Hummer, Each w/Oil cooler
Part Number: SUM-380533
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Pro LS 2618 Forged Piston, 4.030 bore, 1.110 C.H., 20cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.0 LY6 LQ4 LQ9, Set of 8
Part Number: SUM-110927403020
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Engine Lift Plate, LS< Series GM, Gen III,IV,V, Steel, .250 in., Red Powdercoat, Each
Part Number: SUM-G1044R
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Cylinder Head, 195cc Precision Cast, Aluminum, Assembled, 65cc Chamber, 2.020 in./1.600 exh. Valve, Chevy, For Small Block with Flat Tappet Cam, Each
Part Number: SUM-162SBCSTRFT
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Flexplate, 168-Tooth, Internal Engine Balance, SFI 29.1, Chevy, GM LS Gen III/IV, Each
Part Number: SUM-G105SFI
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Driveshaft, Rear, Balanced, One-piece, Assembled, Aluminum, 82-02 Chevy Camaro, Pontiac Firebird, Each
Part Number: SUM-790305
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Pistons, Hypereutectic, Flat, 4.000 in. Bore, Chevy, Set of 8
Part Number: SUM-17351C-00
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Bushing, Transmission Mount, Polyurethane, Gray, GM, Each
Part Number: SUM-7731108
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.7 Ratio, Fits 7/16 in. Stud, Chevy, Big Block, Set of 16
Part Number: SUM-G6930B
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Engine Cradle, Dolly, Stand, 2-Piece, Heavy Duty, 850 lbs. Capacity, Steel, Black Powdercoated, 3 in. Casters, Small Block, Ford, Kit
Part Number: SUM-918034
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Main Bearings, 1/2 Groove, Standard Size, Bi Metal, Silicon Aluminum, Chevrolet, Small Block, Set of 5
Part Number: SUM-172000
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Timing Cover, 1-Piece, Aluminum, Polished, Chevy, Small Block, Kit
Part Number: SUM-G6300W
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Stage 3 Pro LS Turbo Cam. 232/234 115.5 + 5.5, .600/.575 Lift, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LS9 LQ4 LQ9 LM7, Each
Part Number: SUM-8716R1
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Pro LS 4340 Rotating Assembly, 408 Cid., 4.030 bore, 4.000 stroke, 58x, 6.125 rod, 20cc dish, 9.8:1 @ 65cc, 9.4:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R584003020
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/287, Lift .523/.524, Chevy GM, LS/LSX, Gen III/IV, LS, Kit
Part Number: SUM-8701-1
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Crankshaft Damper Drill Pinning Fixture Tool, Harmonic balancer, Gen III/IV LS, LT, Kit each
Part Number: SUM-900341
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 5.700 in. Length, 550 HP, Chevy, Small Block, Set of 8
Part Number: SUM-180371P
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Harmonic Balancer/Crank Pulley, 25 Percent Underdrive, SFI, Internal Balance, Medium Spacing, Chevy, Pontiac, 5.7, 6.0L, Each
Part Number: SUM-C2502
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Tool, Harmonic Balancer Installation Tool, Chevy GM, LS/LSX, Gen III/IV, Steel, Black, Each
Part Number: SUM-900135
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Automatic Transmission Rebuild Kit, GM, 4L60E, 30-Spline, Kit
Part Number: SUM-705005
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Valve Covers, Tall Height, Cast Aluminum, Black Crinkle, Plain, Chevy, LS, Pair
Part Number: SUM-440362
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Hydraulic Roller Lifter Installation Hardware, Chevy, Small Block, 5.0/5.7L Kit
Part Number: SUM-150123
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Fuel Tank, Steel, Silver, 25 Gallon, No Vent Tube, 88-2000, Chevy PU, Front, Each
Part Number: SUM-255022
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Pistons, Hypereutectic, Flat, Coated Skirt, 4.030 in. Bore, Chevy, Set of 8
Part Number: SUM-17351C-30
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Motor Plate, Front, Aluminum, 1/4 in. Thick, Chevy, Big Block, Each
Part Number: SUM-01-9030
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.