Availability
1998 CHEVROLET Engines & Components
Showing In Stock Items. Show All Items.
Not Showing Customizable Items. View Customizable Items.
Cylinder Head, Performer RPM 454-O High-Compression, Assembled, 100cc Chamber, Hydraulic Roller, Oval/Round Ports, Aluminum, Chevy, Big Block, Each
Part Number: EDL-60435
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
BUILD IT WITH SUMMIT!
Summit Chevy LS 4340 Forged Steel Crankshaft, 3.622 stroke, 58X Reluctor, Gun-drilled and Lightened, Nitride Hardened, Narrowed Rod Bearings Req.
Part Number: SUM-180LS362258
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Head, Performer RPM, Aluminum, Assembled, 110cc Chamber, 290cc Intake Runner, Chevy, Big Block, Each
Part Number: EDL-60455
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Head, Performer RPM, Aluminum, Assembled, 110cc Chamber, 290cc Intake Runner, Chevy, Big Block, Each
Part Number: EDL-60459
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Connecting Rods, Forged 3-Pocket Beam, 6.125 in. Length, ARP2000 Bolts, 692g, Chevy LS Engines/Gen V LT, Set
Part Number: BLN-LS6125-927
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Head, BB-2 Xtra, Aluminum, Assembled, 119cc Chamber, 365cc Intake Runner, Chevy, Big Block, Each
Part Number: BRO-2021024
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam and Lifters, Rattler, Hydraulic Roller Tappet, Advertised Duration 280/288, Lift .525/.530, Chevy, Small Block, Kit
Part Number: HRS-CL118005-09
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Head, GenX® 220, Fast As Cast®, Assembled, 64cc CNC Chambers, Titanium Retainers, GM LS1, Each
Part Number: TFS-3061T001
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Head, Performer RPM, Aluminum, Assembled, 118cc Chamber, 315cc Intake Runner, Chevy, Big Block, Each
Part Number: EDL-60555
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Rotating Assembly, Street/Strip, Cast Steel Crankshaft, Hypereutectic Dish Pistons, 1 pc Seal, Chevy, 383, Kit
Part Number: ESP-B15504L03068
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Head, BB-2 Plus, Aluminum, Assembled, 119cc Chamber, 312cc Intake Runner, Chevy, Big Block, Each
Part Number: BRO-2021012
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Belt Drive, 2-Piece Upper, Dry System, Chevy, Small Block, Kit
Part Number: JES-KBD-31000
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Head, Performer RPM 454-O, Aluminum, Assembled, 100cc Chamber, 295cc Intake, Chevy, Big Block, Each
Part Number: EDL-60439
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Heads, Maxx Series, Hydraulic Roller, Assembled, Aluminum, 200cc Intake Runner, Chevrolet, Small Block, Pair
Part Number: PMX-9200HR
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Lifters, Hydraulic Roller, 0.842 in. O.D., Horizontal Link Bars, Chevrolet, Set of 16
Part Number: CXM-J-2126LSR
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Engine Rotating Assembly, Street/Strip, Cast Crank, Hypereutectic Pistons, I-Beam Rods, Chevy, 5.7L, Kit
Part Number: ESP-B15505L03053
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Head, Performer RPM, Aluminum, Assembled, 118cc Chamber, 315cc Intake Runner, Chevy, Big Block, Each
Part Number: EDL-60559
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Head, Rectangular Port, Assembled, Aluminum, 119cc Chamber, 312cc Intake Runner, Chevy, Big Block
Part Number: BRO-2061018
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Head, Performer, Aluminum, Assembled, 100cc Chamber, 290cc Intake Runner, Chevy, Big Block, Each
Part Number: EDL-60499
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Head, Performer RPM, Aluminum, Assembled, Hydraulic Flat Tappet, 60cc Chamber, 170cc Intake Runner, Small Bore 265, 283, 305, 307, SBC, Each
Part Number: EDL-61019
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Lifters, Red-Zone EZ-Roll Max, Mechanical Roller, Vertical Link Bars, Chevy, Big Block, Set of 16
Part Number: ISK-37296RHEZMAX
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Head, Victor Jr. 24 degree Rectangular Port, Aluminum, Assembled, Chevy, Big Block, Each
Part Number: EDL-77485
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Engine Rotating Assembly, Street, Cast Crank, Hypereutectic Pistons, I-Beam Rods, Chevy, Small Block, Kit
Part Number: ESP-B15405L04068
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Engine Rotating Assembly, Street, Cast Crank, Pistons, I-Beam Rods, Chevy, Small Block, Kit
Part Number: ESP-B15402L00068
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Head, Race-Rite, Aluminum, Assembled, 119cc Chamber, 294cc Intake Runner, Chevy, 396-454, Each
Part Number: BRO-2061009
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster