Selected Filters


Loading...

Availability


1997 Summit Racing Parts and Accessories

Individual Parts

Results 1301 - 1325 of 2000 +

Spark Plug Wires, Street / Strip Series, 8mm, 300 Ohm, Red, 135 Degree Spark Plug Boots, 90 Degree Socket Style Distributor Boots, BBC, V8, Set

Part Number: SUM-867806R

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Tonneau Cover, Soft Folding, Vinyl, Black, Above the Bed Rails, 6 1/2 Ft, Bed, Chevy, GMC, Each

Part Number: SUM-484916

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.6 Ratio, Fits 3/8 in. Stud, Chevy Small Block, Set of 16

Part Number: SUM-G6936-16

4.5 out of 5 stars ( 4 )

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Hydraulic Roller Lifter Guide hold down retainer, Chevy, Small Block, 86-2000, 5.0/5.7L Kit

Part Number: SUM-150124

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Turbocharger Oil Lines, Turbo Oil Feed Lines, 16mm to Dual -4AN, Fits SUM-G9302 Twin Turbo LS Manifolds, Kit

Part Number: SUM-G9302-OLK

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.385 in. Length, .990 Floating Pin, ARP L19 260K PSI 7/16 in. 12 pt. Bolts, Set of 8

Part Number: SUM-BBC638519H

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Billet Aluminum Intake Manifold, Fuel Injected, CNC machined, 102mm Bore Size, Aluminum, Satin, Chevy, LS1, LS2, LS6, Each

Part Number: SUM-226140S

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC 2.100 pin, .708 Narrowed, Standard Clearance, set

Part Number: SUM-1227HS

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Pro LS Timing Cover Installation Tool, Crankshaft Seal Position, Gen III-IV LS, Aluminum, Each

Part Number: SUM-900338

2.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Valve Covers, Tall, Fabricated Aluminum, Clear Anodized, Chevy, Big Block, Pair

Part Number: SUM-440610

4.25 out of 5 stars ( 4 )

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Flywheel Bolts, 12-point, 10mm x 1.0 Thread, 1.000 in. Length, Steel, 200,000 psi, Ford, V8, 4.6L, 5.4L, Set of 8

Part Number: SUM-910199

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Steering Rebuild Kit, Moog, Jeep, Kit

Part Number: CMB-15-0082

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Brake Rotors, Cross-drilled and Slotted Surface, Vented, Iron, Zinc Dichromate Plated, Rear, Pair

Part Number: SUM-BRC-62061PR

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Rocker Arms, Pedestal Mount, Full Roller, Aluminum, 1.8 Ratio, Chevy, 4.8/5.3/5.7/6.0/7.0L, Set of 16

Part Number: SUM-G6981

4.0 out of 5 stars ( 6 )

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Timing Gear, Adjustable, Billet Steel, 3-Bolt, 4X, Single Row, 0.010 in. Line Hone, Chevy LS, Each

Part Number: SUM-G6644-4X-010

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Alternator Pulley, Replacement, V-Belt, Steel, Black, for SUM-G3977B, Each

Part Number: SUM-G3948B

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Pro BBF Big Block 385 Ser. Best Hydraulic Roller Cam 2, 218/232 Duration, 111.5 LSA + 4.5 Adv. .582/.582 lift 1.75 ratio, 2,400 to 5,800 basic rpm

Part Number: SUM-8931

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Pro BBF Big Block 385 Ser. Best Hydraulic Roller Cam 6, 242/248 Duration, 110.5 LSA + 4.5 Adv. .582/.582 lift 1.75 ratio, 3,500 to 7,000 basic rpm

Part Number: SUM-8935

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Combo, Intake Manifold, 750 CFM Carburetor, Air Cleaner, Fuel Line, Gaskets, Bolts, Chevy Big Block, Oval Port

Part Number: CMB-03-0210

5.0 out of 5 stars ( 1 )

Cannot be shipped Internationally if shipped by air

...Loading

Cannot be shipped Internationally if shipped by air

Oil Pan, Conversion, Street/Strip, Steel, Black, 5 qt., Engine Swap, Ford, 302W, Kit

Part Number: SUM-G3555B

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Pulley Spacer, Crankshaft, 4-bolt, Aluminum, Natural, 0.875 in. Thickness, Ford, Each

Part Number: SUM-329708

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Shock/Strut, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each

Part Number: SUM-G7762

4.25 out of 5 stars ( 4 )

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Valve, Intake, Stainless Steel, 2.020 in. Diameter, .341 in. Stem, 4.911 in. Length, Chevy, Each

Part Number: SUM-V8002-1

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Timing Pointer, Billet Aluminum, Black Anodized, Chevy, 7 in. Balancer, Small Block, Each

Part Number: SUM-G6312-7

4.0 out of 5 stars ( 4 )

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air

Forged Pro pistons for SB Chevy 350, 4.030 bore, 1.560 C.H., 3.48 in. stroke, 5.7 in. rod, 5cc flat top 11:1@58cc, 10.2@64cc, 9.9@67cc, 9.4@72cc.

Part Number: SUM-SBC350030

Not Yet Reviewed

Estimated Ship Date: Monday 3/9/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/9/2026 if shipped by air