Availability
1995 Summit Racing Parts and Accessories
Big Block PRO BBC H.R. 12 H.O. Cam, LS Firing Order, 276/285 Duration @ .050, 108 LSA + 1 Adv, .700/.700 with 1.7 ratio, .741/.741 with 1.8 4500-7500
Part Number: SUM-1262-H-O
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Big Block PRO BBC H.R. 8 H.O. Cam, LS Firing Order, 252/264 Duration @ .050, 108 LSA + 4 Adv., .624/.624 with 1.7 ratio, .661/.661 with 1.8, 4000-7000
Part Number: SUM-1258-H-O
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Carpet and Vinyl Floor Kits, Carpet Cut Pile, Black, Padding Included, Complete, No Rocker Panels, Jeep, Kit
Part Number: SUM-461083-BLK
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pulley Set, Serpentine, Standard Ratio, Billet Aluminum, Chevy, Small Block, Long Water Pump, Kit
Part Number: SUM-329711
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro SBC Best Hydraulic Roller Cam, Roller Block, 248/258 Dur.109.5 LSA + 3.5 Adv. .550/.550 lift with 1.5 rocker, 587/.587 1.6, ea
Part Number: SUM-8813
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro SBC CT1 Hydraulic Roller Cam 1, LS Firing Order, 232/248 Dur., 110 LSA, +4 Adv., .530I/.530E Lift with 1.5, .565I/.565E Lift 1.6, Roller Block
Part Number: SUM-8815SN
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Radiator, Exact Fit, Aluminum, Plastic, Dodge, 5.9L, Each
Part Number: SUM-380552
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Clutch Kit, Street-Strip Performance, 1-1/8 in. Shaft, 26-Spline, 10.5 in. Organic/Ceramic Disc, Ford, Kit
Part Number: SUM-700918
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro SBF Best Hydraulic Roller Cam 9, 248/258 Duration, 109.5 LSA + 3.5 Adv. .587/.587 lift 1.6 ratio, .625/.625 lift 1.7 ratio, 3,800-7,300 basic rpm
Part Number: SUM-8909
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro SBC CT3 Hydraulic Roller Cam 1, LS Firing Order, 244/258 Dur., 109 LSA, +4.5 Adv., .530I/.530E Lift with 1.5, .565I/.565E Lift with 1.6, Retrofit
Part Number: SUM-8817
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro SB Chrysler Magnum Best Hydraulic Roller Cam 1, 212/218 Duration, 111 LSA + 2 Adv. .560/.554 lift 1.6 ratio, .595/.588 1.7 ratio, 1,500-6,000 rpm
Part Number: SUM-5775
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Valve Covers, Tall, Cast Aluminum, Finned, Polished, Dodge, Mopar, Small Block Magnum, Pair
Part Number: SUM-440425
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Valve Covers, Aluminum, Copper Plated, Tall, Finned, Chevy, 5.0/5.7L, Pair
Part Number: SUM-440417CPR
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cab Visor, Sportvisor, Fiberglass, White Gelcoat, Chevy, GMC, C/K-Series Pickup, Each
Part Number: SUM-480010
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro BBC Chevy Big Block Turbo Cam 3, LS Firing Order, 242/242 Duration, 116.5 LSA, 2.5 Adv. .620/.620 lift 1.7 ratio, .655/.655 1.8, 3,700-7000
Part Number: SUM-1264
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Radiator, Exact Fit, Aluminum, Plastic, Ford,7.3L, Each
Part Number: SUM-380553
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro SBC CT2 Hydraulic Roller Cam 1, LS Firing Order, 238/254 Dur., 109 LSA, +4 Adv., .530I/.530E Lift with 1.5, .565I/.565E Lift, 1.6, Roller Block
Part Number: SUM-8816SN
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Rocker Arms, Gold Series, Full Roller, 1.5 Ratio, Aluminum, Gold Anodized, Chevy, Small Block, Set of 16
Part Number: SUM-G6811G
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, 4340, I-Beam, Thru-Bolt, 5.700 in. Length, 475 HP, Chevy, Small Block, Set of 8
Part Number: SUM-180370P
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro BBF Big Block 385 Ser. Best Hydraulic Roller Cam 4, 232/242 Duration, 111 LSA + 5 Adv. .582/.582 lift 1.75 ratio, 3,200 to 6,500 basic rpm,429 460
Part Number: SUM-8933
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro BBF Big Block 385 Ser. Best Hydraulic Roller Cam 3, 224/236 Duration, 111 LSA + 4 Adv. .582/.582 lift 1.75 ratio, 3,000 to 6,000 basic rpm,429 460
Part Number: SUM-8932
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Wheel, Venom, Aluminum, Gloss Black, Machined, 17 in. x 10 in., 5 x 4.75 in./120.65mm Bolt Circle, 7.50 in. Backspace, Each
Part Number: SUM-149B-716151
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro SB Chrysler Magnum Best Hydraulic Roller Cam 3, 224/236 Duration, 112 LSA + 3 Adv. .550/.550 lift 1.6 ratio, .624/.624 1.7 ratio, 3,200-6,800 rpm
Part Number: SUM-5777
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.6 Ratio, Fits 3/8 in. Stud, Chevy Small Block, Set of 16
Part Number: SUM-G6936-16
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Valve Covers, Tall, Fabricated Aluminum, Clear Anodized, Chevy, Big Block, Pair
Part Number: SUM-440610
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster