Availability
Water Pump, Electric, 35 gpm At 12 V, 6 amps, Aluminum, Polished, Chevy, Small Block, Each
Part Number: SUM-316003
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Oil Pan, Steel, Blue Painted, 5 qt., Front Sump, Ford, Small Block Windsor, 221-302, Each
Part Number: SUM-440103
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Cam Retaining Plate, For Use with Factory Roller Block and Camshaft, Chevy, Big, Small Block, Each
Part Number: SUM-150130
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Connecting Rods, 4340, I-Beam, Thru-Bolt, 5.700 in. Length, 475 HP, Chevy, Small Block, Set of 8
Part Number: SUM-180370P
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Axles, Direct Fit, 1541H Steel, 31-Spline Aftermarket Carrier, Ford, 8.8 in., 5 x 4.50 in. bolt pattern, Kit
Part Number: SUM-700123
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Bellhousing, Steel, Black, SFI 6.1, Chevy, V6-V8, to Muncie/T-10/TKX Manual Transmission, Kit
Part Number: SUM-7001101
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Differential Carrier, Positraction, Nodular Iron, Dana 60, Dana 61, 30 Spline, 3 Series, Each
Part Number: SUM-730975
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Exhaust Gaskets, Header, Copper, Round Port, Chevy, Small Block, Pair
Part Number: SUM-111405
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Crankshaft Socket, 1/2 in., Steel, Buick, Ford, Pontiac, Each
Part Number: SUM-904798
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Exhaust Gaskets, Header, Copper, Stock Port, Ford, Small Block, Pair
Part Number: SUM-111430
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Combo, Edelbrock, Performer, Intake Manifold, Carburetor, Holley, 600 CFM, Air Cleaner, Ford, Small Block, Kit
Part Number: CMB-03-0127
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Radiator, Exact Fit, Aluminum, Plastic, Cadillac, Chevy, GMC, 5.0L, 5.7L, Each
Part Number: SUM-380532
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Bellhousing Separator Plate, Steel, 0.060 in. Thick, Ford, 5.0, 5.8L, Each
Part Number: SUM-700601
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Cylinder Head Bolts, 12-point, 8740 Chromoly, Black Oxide, 7/16-14 in. Thread, Chevy, Small Block, Kit
Part Number: SUM-910200
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Clutch Cable, with Aluminum Quadrant, Adjustable, Ford, Mercury, 5.0L, Kit
Part Number: SUM-700100
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Fuel Tank, Steel, Silver, 34 Gallon, Chevy PU, 88-2000, Each
Part Number: SUM-255032
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Distributor Hold-Down Clamp, Steel, Chrome, Bolt Mount, Ford, Each
Part Number: SUM-400502
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Lifter Guides, Hydraulic Roller Style, Steel, Chevy, 5.0L, 5.7L, Set of 8
Part Number: SUM-150131
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Cab Visor, Sportvisor, Fiberglass, White Gelcoat, Chevy, GMC, Van, Each
Part Number: SUM-480014
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Bolts, Intake Manifold, Stainless Steel, Natural, Hex Head, Ford, 260-302, 351W, Kit
Part Number: SUM-G1579HS
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Valves, Intake, Stainless Steel, 2.190 in. Diameter, .371 in. Stem, 5.218 in. Length, Chevy, Set of 8
Part Number: SUM-V8022-8
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Crankshaft Socket, 1/2 in., Aluminum, Small Block Chevy, Pontiac, Each
Part Number: SUM-G1063
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Engine Management System Combo, Megasquirt PNP Gen2, Wideband Gauge, Ford, Kit
Part Number: CMB-03-0269
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Harmonic Balancer Bolt, Steel, Gold Iridited, External Hex, Chevy, Big Block, Each
Part Number: SUM-G1678
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Forged Pro pistons for 383 Stroker Chevy Long Rod, 4.030 bore, 1.125 C.H., 3.75 in. stroke, 6 in. rod, 9cc reverse dome 10.5@64cc, 10.1@67cc, 9.7@72cc
Part Number: SUM-SBC383030L
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.