Availability
1989 JEEP CHEROKEE Parts and Accessories
Oil Pan, Steel, Black, Jeep, 4.0L, Each
Part Number: ATP-103072
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Shocks and Struts, B8 5100 Series Shocks, Lifted Ride Height, 4.10-6.00 in. Lifted Amount Range, Monotube, Gas-charged, Black Boot, Rear, Jeep, Each
Part Number: BSN-33-151663
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Speedometer Cable, OE-Style, Female Threaded Ends, 7/8 in.-18, 5/8 in.-18, 63 in. Long, Black, Plastic Jacket, for Various Makes, Each
Part Number: ATP-Y804
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Engine Oil, 8100 Eco-nergy, 5W30, 5 liters, Synthetic, Each
Part Number: MTL-102898
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Hood Supports, QuickLIFT, Steel Struts, Black, Zinc Brackets, Stock or Aftermarket Hood, Jeep, Cherokee, Comanche, Kit
Part Number: RLT-21-20001-01
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Shock/Strut, Hydro 7000, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SJA-H7025
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Motor Mount, Complete Mount, Bolt-In, Steel, Black, Jeep, 4.0, 4.2L, Each
Part Number: CWA-52040267
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Spark Plug Wires, LiveWires, Spiral Core, 10mm, Red Wires, Black Boots, AMC 6 Cylinder, Set
Part Number: DUI-C9087RD
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Ring and Pinion Gears, Ring and Pinion Gear with Installation Kits, Dana 44, 3.54:1 Ratio, 26-spline, Standard, Dana 44, Chevy, Dodge, Ford, GMC, Kit
Part Number: SDH-22856-5X
Need It Sooner? We recommend these similar substitute parts:
Motive Gear Ring and Pinion Sets D44-354 Dana 44 3.54 Gears
Estimated Ship Date: Monday 2/23/2026
Fuel Injectors, OEM Replacement, Jeep, Set of 6
Part Number: SMP-FJ26RP6
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Belt, OE Technology Series, Multi-V, Serpentine, 6-Rib, 102.50 in. Length, Each
Part Number: CEL-4061025
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Ring and Pinion Installation Kit, Master Kit, Dana 30, 26-Spline Pinion, Kit
Part Number: MGR-R30RMK
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Door Jamb Switch, OEM Replacement, Each
Part Number: SMP-DS240T
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Starter, Full Size, Standard Rotation, Jeep, 4.0L, 5.9L, Each
Part Number: CWA-33002709
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Distributor Cap, Male/HEI-Style, Black, Screw-Down, Jeep, 4.0L, Kit
Part Number: ACC-120330
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Bushings, Tie Rod Dust Boots, 19/32 in. Top, 1 3/8 in. Bottom, Round, Red, Pair
Part Number: ENS-9-13101R
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Wiper Blade, 31-Series, Black Steel Frame, Black Rubber Blade, 18 in., Each
Part Number: ANC-31-18
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Clutch Kit, 1.125 in. - 10-spline, Organic Disc, Pressure Plate, Slave Cylinder, Jeep, 4.0L, 4.2L, Kit
Part Number: LUK-01-035
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Shock/Strut, Superide, Twin-Tube, Rear, Mitsubishi, for Nissan, Toyota, 4WD, Each
Part Number: SLF-87100
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Shock, SX8000, Twin-Tube, 22.5 in. Extended, 13.5 in. Collapsed Lengths, Stud, Eyelet, Each
Part Number: TFY-61232
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Sway Bar Bushing, Black, Delrin, Antirock Sway Bar That Supports Sway Bar into the Frame, Jeep, Universal Antorock, Each
Part Number: RKJ-CE-9901D
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Speed Bleeder Screws, 3/8 in.-24 Thread, 1.188 in. Length, Pair
Part Number: RNB-12701
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
U-Joint Straps, Spicer 1310-Spicer 1330 Combination Style, Differential Location, Kit
Part Number: YGA-41195
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Door Lock Rod Clip, Buick, Cadillac, Chevy, GMC, Oldsmobile, Pontiac, Kit
Part Number: RNB-75450
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Fan, Electric, Triple 10 in. Puller, 2,850 cfm, Plastic Blades, Aluminum Shroud, Jeep, 4.0L, Kit
Part Number: MIO-MMFS-XJ-89
Not Yet Reviewed
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Estimated Ship Date: Monday 2/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster