Availability
1989 DODGE Parts and Accessories
Pump Repair Kit, Saginaw Pump, Kit
Part Number: EDD-7910
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Distributor, Unilite, Mechanical Advance, Mopar, 273, 318, 340, 360, Each
Part Number: MAA-3757901
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Summit Racing™ Digital RTR Plus Billet Distributors SUM-850422D
Estimated Ship Date: Monday 4/27/2026
Lowering Blocks/U-Bolts, Aluminum, 1 in. Lowering, For 2.5/3.0 in. Wide Leaf Springs, Rear, Universal, Kit
Part Number: BEL-6002
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Ball Joint Kit, Yukon Ball Joint Kit for GM, Dodge, Ford, IH Scout, & Jeep Vehciles, Both Sides
Part Number: YGA-12911
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Fuel Tank Selector Valve, Plastic, Black, Chevy, Dodge, Ford, GMC, Mercury, Oldsmobile, Pontiac, Each
Part Number: SMP-FV5
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Muffler, Super 50 Series, 3 in. Inlet/3 in. Outlet, Steel, Black, Aluminized, Each
Part Number: FLO-53058
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Rod Bearing, H Series, .001 in. Thinner, TM-77, Chrysler, Dodge, Plymouth, 273, 318, 340, 360, Each
Part Number: CLE-CB481HXN
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Wheel, 100 Classic, 15 in. x 7 in., Aluminum, Chrome, 5 x 4.50 in. Bolt Circle, 4 in. Backspace, Each
Part Number: RWG-100C-5706500
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Piston Rings, Claimer Series Performance Piston Ring Sets, Plasma-moly, 4.030 in. Bore, 1/16 in., 1/16 in., 1/8 in. Thickness, L8, V8, Set of 8
Part Number: HSN-CM5521030
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Advertised Duration 280/288, Lift .541/.537, Mopar, Small Block LA, Each
Part Number: CCA-20-812-9
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Add-A-Leafs, Long-Style, 2.5 in. Width, with Center Pin, Chevy, GMC/Dodge, Pair
Part Number: SJA-F1100
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Fuel Pump Block-Off Plate, Steel, Chrome Plated, Chevy, Ford, Mopar, Gasket Included, Each
Part Number: PRO-66107
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Wheels, Nomad CONVOY SALT 15X7 5X139.7 -10mm
Part Number: RLW-S0140
Not Yet Reviewed
Estimated Ship Date: Jul 22, 2026 if ordered today
Estimated Ship Date: Jul 22, 2026 if ordered today
Throwout Bearing, Release Bearing (All Applications)
Part Number: VAI-BRG063
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Engine Oil, 8100 Eco-nergy, 5W30, 5 liters, Synthetic, Each
Part Number: MTL-102898
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Exhaust Gaskets, Header, Copper, Stock Port, Mopar, Small Block, Pair
Part Number: MRG-7166MRG
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Toolbox, Specialty Series, Side of Truck Bed Location, Aluminum, Polished, Locking, Each
Part Number: DZZ-DZ70
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Axle Seal, Rear Outer, Avanti, Buick, Chevy, GMC, Chrysler, Dodge, Plymouth, Ford, Lincoln, Mitsubishi, Each
Part Number: TMK-8835S
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Heater Valve, Replacement, Steel, Gold Iridited, Each
Part Number: UAC-HV2211C
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Add-A-Leafs, Rear, 2 in. Lift, Chevy, Dodge, Ford, GMC, Kit
Part Number: TFY-81250
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Crosspin Bolt, 5/16 in. Hex Head, Each
Part Number: YGA-33067
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Intake Bolts, Extreme Duty,12-Point, Chromoly, Nickel plated, 170,000 psi, 3/8-16 x 1.750 in. UHL, 318-360 LA Mopar, with Washers, 12-pieces, Kit
Part Number: SUM-910505
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Valve Cover Gaskets, CorkLam, Cork/Rubber with Steel Core, Chrysler, Dodge, Plymouth, Small Block, Pair
Part Number: FEL-1646
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Transmission Mount Kit; Black
Part Number: PTP-4-1604-BL
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Brake Drum, Cast Iron, Rear, Chrysler, Dodge, Plymouth, Each
Part Number: BEN-PDR0365
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster