Availability
Connecting Rods, 4340, H-Beam, 12-Point, Cap Screw, 6.135 in. Length, Chevy, Big Block, Set of 8
Part Number: SCA-6613522A
Not Yet Reviewed
Estimated Ship Date: Jan 22, 2026 if ordered today
Estimated Ship Date: Jan 22, 2026 if ordered today
Engine Re-Ring, Cast Iron, 4 in. Bore, Standard Rod, Standard Main, Chevy, 350, Kit
Part Number: FEM-MK1394C-000
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Crankshaft, 1-Piece Seal, Internal, External Balance, Forged 4340 Steel, 3.480 in. Stroke, Chevy, 350, Each
Part Number: SCA-435010L
Estimated Ship Date: Jan 22, 2026 if ordered today
Estimated Ship Date: Jan 22, 2026 if ordered today
Piston and Ring Kit, Powerpack Plus, Gas Ported, Dome, Forged Aluminum, 4.040 in. Bore, 3.500 in. Stroke, Chevy, Set of 8
Part Number: MLE-197754140
Not Yet Reviewed
Estimated Ship Date: Dec 4, 2025 if ordered today
Estimated Ship Date: Dec 4, 2025 if ordered today
Gen. 1.5 LT1 Forged Steel Crankshaft, 3.750 stroke, 5.700 Rod, Lightened, bull-nose counterweights, Nitride Hardened, 1 piece rear main seal
Part Number: SUM-SBCLT37501P
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pulley Kit, Serpentine, Aluminum, Clear Powdercoated, Chevy, Big Block, Kit
Part Number: MCH-23070
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Connecting Rods, Forged 4340 Steel, Pro Sport H-Beam, Stroker, 6.125 in. Length, ARP L19 Bolts, Chevrolet, Small Block Gen I, LS, LT, Set of 8
Part Number: SCA-S0012
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pulley Kit, Serpentine, Aluminum, Clear Powdercoated, Chevy, Small Block, Kit
Part Number: MCH-22070
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Forged Pro pistons for BB Chevy 540, 4.500 bore, 1.120 C.H., 4.25 in. stroke, 6.535 in. rod, 40cc Dome open chamber only, 13.7:1@114cc, 13:1@119cc.
Part Number: SUM-BBC540STD40
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Forged Pro pistons BB Chevy 565, 4.600 bore, 1.270 C.H., 4.25 in. stroke, 6.385 rod, 8cc open/closed chamber Dome 11:1@110cc, 10.7@114cc, 10.2@119cc.
Part Number: SUM-BBC5404600
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pulley Kit, Serpentine, Aluminum, Black Powdercoated, Chevy, Big Block, Long Water Pump, Kit
Part Number: MCH-23072-08
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Pistons, Forged, Dome, 4.280 in. Bore, 1/16 in., 1/16 in., 3/16 in. Ring Grooves, Chevy, Big Block, Set of 8
Part Number: UEM-IC789-030
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Lifter, Sportsman, Mechanical Roller, Vertical Link, 0.904 in. Diameter, w/ Bearing, Seat Height 1.880 in., BBC, Chevy, Set of 16
Part Number: CCA-96850-16
Not Yet Reviewed
Estimated Ship Date: Jan 7, 2026 if ordered today
Estimated Ship Date: Jan 7, 2026 if ordered today
Connecting Rods, Forged 4340 Steel, Pro Sport H-Beam, 5.700 in. Length, ARP L19 Bolts, Chevrolet, Small Block Gen I, Set of 8
Part Number: SCA-6570021L19
Not Yet Reviewed
Estimated Ship Date: Jan 22, 2026 if ordered today
Estimated Ship Date: Jan 22, 2026 if ordered today
Combo, COMP Cams, Cam and Springs, Advertised Duration 291/311, Lift .522/.509, Springs, Chevy, 5.0, 5.7L, Kit
Part Number: CMB-09-0013
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Engine Re-Ring, Moly, 4.030 in. Bore, .010 in. Rod, .010 in. Main, Chevy, 350, Kit
Part Number: FEM-MK6038C-311
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Engine Re-Ring, Moly, 4 in. Bore, Standard Rod, Standard Main, Chevy, 350, Kit
Part Number: FEM-MK6038D-000
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Piston, Dome, 4.280 in. Bore, 4.250 in. Stroke, 6.385 in. Rod Length, 1.5mm, 1.5mm, 3.0mm Ring Grooves, Chevy Big Block, Set of 8.
Part Number: PIS-1000307
Not Yet Reviewed
Estimated Ship Date: Jan 2, 2026 if ordered today
Estimated Ship Date: Jan 2, 2026 if ordered today
Piston and Ring Kit, Forged, 4.030 in. Bore, Chevy, Kit
Part Number: MLE-930206530
Not Yet Reviewed
Estimated Ship Date: Dec 3, 2025 if ordered today
Estimated Ship Date: Dec 3, 2025 if ordered today
Pistons, PowerPak Piston and Ring Kits, Stroked, 4.030 in. Bore, Forged Aluminum, Flat Top, Rings, Chevrolet, 302/327/350 Small Block, Set of 8
Part Number: MLE-930200830
Not Yet Reviewed
Estimated Ship Date: Dec 4, 2025 if ordered today
Estimated Ship Date: Dec 4, 2025 if ordered today
Piston and Ring Kit, Forged, 4.030 in. Bore, Chevy, Kit
Part Number: MLE-930206730
Not Yet Reviewed
Estimated Ship Date: Dec 4, 2025 if ordered today
Estimated Ship Date: Dec 4, 2025 if ordered today
Connecting Rods, 4340, H-Beam, 12-Point, Cap Screw, 6.200 in. Length, Chevy, Small Block, Set of 8
Part Number: SCA-6620021
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Engine Re-Ring, Cast Iron, 3.736 in. Bore, Standard Rod, Standard Main, Chevy, 305, Kit
Part Number: FEM-MK1026D-000
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 291/311, Lift .522/.509, Chevy, 5.0 5.7L, Kit
Part Number: CCA-CL08-601-8
Not Yet Reviewed
Estimated Ship Date: Jan 7, 2026 if ordered today
Estimated Ship Date: Jan 7, 2026 if ordered today
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 280/280, Lift .525/.525, Chevy, Small Block, Kit
Part Number: CCA-CL08-430-8
Not Yet Reviewed
Estimated Ship Date: Jan 8, 2026 if ordered today
Estimated Ship Date: Jan 8, 2026 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.