Availability
Timing Gear, Cam Sprocket, Steel, Jeep, 5.0L, 5.9L, 6.6L, Each
Part Number: CWA-J3197138
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Timing Gear, Cam Sprocket, Steel, Jeep, 3.8L, 4.2L, Each
Part Number: CWA-J3206693
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Piston Ring Set, This Item Is Not Painted, Metal, Use Existing Hardware
Part Number: CWA-J3208066
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Piston Ring Set, This Item Is Not Painted, Metal, Use Existing Hardware
Part Number: CWA-J3208067
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Timing Gear, Cam Sprocket, Steel, Jeep, 5.0L, 5.9L, Each
Part Number: CWA-J3234234
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Timing Gear, Crank Sprocket, Steel, Jeep, 5.0L, 5.9L, Each
Part Number: CWA-J3234235
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Timing Chain, Single Non-roller, Steel, Jeep, 5.0L, 5.9L, Each
Part Number: CWA-J3234433
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Rocker Arm Nut, Rocker Arm Bridge Nut, Self-Locking, Jeep, Each
Part Number: CWA-J4006926
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Valve, Exhaust, 1.406 in. Valve Head Diameter, Steel, 4.892 in. Overall Length, 0.015 in. Oversize, Jeep, Each
Part Number: CWA-J3240164
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Valve, Intake, Steel, 0.015 in. Oversize, Jeep, Each
Part Number: CWA-J3240167
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Timing Gear, Crank Sprocket, Steel, Jeep, 5.0L, 5.9L, Each
Part Number: CWA-J3223199
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Rocker Arm, Non-roller, Steel, Natural, Stud Mounting Style, Jeep, 4.2L, Each
Part Number: CWA-J3223888
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Piston, Cast Aluminum, Flat Top, 3.165 in. Bore, Jeep, Willys, 2.2L, Each
Part Number: CWA-J8121658
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Piston Rings, 3.750 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, L6, Set
Part Number: CWA-J8121683
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Piston Ring Set, This Item Is Not Painted, Metal, Use Existing Hardware
Part Number: CWA-J8121684
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Piston Rings, 3.750 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, V8, Set
Part Number: CWA-J8121685
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Timing Chain, Double Roller, Steel, Jeep, 5.0L, 5.3L, 5.9L, 6.6L, Each
Part Number: CWA-J8126682
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Accessory Drive Belt, Serpentine, Jeep, Air Pump, Each
Part Number: CWA-JY013251
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Accessory Drive Belt, V-Groove, Jeep, Air Pump, Power Steering, Each
Part Number: CWA-JY013291
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Accessory Drive Belt, V-groove, Jeep, 2.5L, Each
Part Number: CWA-JY013475
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Accessory Drive Belt, V-groove, Jeep, 2.5L, Each
Part Number: CWA-JY013506
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Accessory Drive Belt, Serpentine, Jeep, Air Conditioning, Each
Part Number: CWA-JY017561
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Camshaft, Hydraulic Flat Tappet Style, 190/190 Duration, Jeep, 4.2L, Each
Part Number: CWA-J8133009
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Camshaft, Hydraulic Flat Tappet Style, 196/196 Duration, Jeep, GM 2.5L, Each
Part Number: CWA-J8132249
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Oil Pump, Wet Sump Style, Standard-volume, Standard-pressure, Jeep, 2.5L, Each
Part Number: CWA-J8132303
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.