Availability
1980 Parts and Accessories
Headers, Street, Long Tube, Steel, Black Paint, Jeep, AMC V8, Pair
Part Number: HED-99200
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Ring and Pinion, Chrysler 9.25 in., 3.92:1 Ratio, Standard Rotation, Set
Part Number: MGR-C9-25-392
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Shock/Strut, Drag Race, 90/10, Front, Ford, Each
Part Number: LAK-40511
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 295/312, Lift .522/.507, Chevy, Big Block, Kit
Part Number: CCA-CL11-602-4
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Alternator, Internal Regulator, 150 Amp, V-Belt, Polished, Ford, Mercury, Jeep, Each
Part Number: PWM-8-67141
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Connecting Rods, SIR 5140 I-Beam, Bushed, Mopar, Small Block LA, Set of 8
Part Number: ESP-6123CB
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Ring and Pinion Gear Installation Kit, Master Overhaul, Dana 44, Kit
Part Number: YGA-14021
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 290/300, Lift .556/.581, Ford, 429, 460, Kit
Part Number: EDL-7167
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Harmonic Balancer Shell, Aluminum, Black, Chevy, Each
Part Number: ATI-917020
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Headers, Competition, Long Tube, Steel, Painted, Dodge, Plymouth, 273, 318, 340, 360, Pair
Part Number: HOK-5901HKR
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Starter; Ultra Torque; Starter; 250 ft. lb. Torque; 4.4-1 Gear Reduction; Adjustable Mount; AMC/Jeep; Standard
Part Number: PWM-9415
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Valve Covers, Cast Aluminum, Black, Slant-Edge, Chevrolet, Bowtie Emblem, Chevy, Small Block, Pair
Part Number: PRO-141-928
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Radiator, Performance, Aluminum, Black, Crossflow, 2-Row, Transmission Cooler, Chevy, Camaro, Each
Part Number: RAD-CHC545AB
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Camshaft, Thumpr, Hydraulic Flat Tappet, Advertised Duration 279/297, Lift .498/.483, Chevy, Big Block, Each
Part Number: CCA-11-600-4
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Headers, Long Tube, Steel, Ceramic Coated, Chevy, GMC, SUV, Pickup, RWD, Small Block, Pair
Part Number: SUM-G9111
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Grizzly Locker, GM 10.5 in., 30 Spline, Each
Part Number: YGA-28015
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Bumper, Front, Stock Style, Steel, Chrome, Chevy, GMC, Models without Fog Lamps, Each
Part Number: OER-CX1859
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pistons, Forged, Flat, 4.040 in. Bore, 3.750 in. Stroke, 5.700 in. Rod Length, 383 Chevy, Set of 8
Part Number: DMS-8710-4040
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Exhaust Systems, Competition Header-Back, Dual, Steel, Aluminized, Split Rear Exit, RWD/4WD, Dodge, Small Block, Kit
Part Number: HOK-7701HKR
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Starter, Ultra Torque, Mini, 3/8 in. Offset, 2 in. Nose Length, Ford, 289/302/351C/351W, Each
Part Number: PWM-9404
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Oil Pan, 7 qt., Chevy, Small Block, Steel, Black Powdercoated, Each
Part Number: MOR-20200
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Wheel, Indy U101, Aluminum, Polished, 15 in. x 8 in., 5 x 4.50 in. Bolt Circle, 4.00 in. Backspace, Each
Part Number: USM-U10115806540
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 6.700 in. Length, Chevy, Big Block, Set of 8
Part Number: SCA-26700716
Not Yet Reviewed
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
PRO BBC H.R. 6 Hydraulic Roller Cam, 4/7 Swap, 242/252 Duration @ .050, 113 LSA + 10 Adv. , .620/.620 with 1.7 ratio, .656/.656 with 1.8, 3700-6600
Part Number: SUM-1256
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Brake Calipers, GM D52 Dual Piston, Aluminum, Gray Anodized, Semi-metallic Pads, Front, Kit
Part Number: WIL-140-11290
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster