Availability
Radiator/Fan Shroud Combo, LS Swap, Crossflow, Dual-Row, Aluminum, Natural, Transmission Cooler, 33.25 in. Wide, 18.62 in. High, 3.00 in. Thick, Kit
Part Number: SUM-381440-KIT1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Radiator/Fan Shroud Combo, LS Swap, Crossflow, Dual-Row, Aluminum, Natural, Transmission Cooler, 33.25 in. Wide, 19.00 in. High, 3.00 in. Thick, Kit
Part Number: SUM-381444-KIT1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Combo, Edelbrock 600cfm, Performer EPS, Fel-Pro, Summit Bolts, Summit Air Cleaner, Studs, Chevy, Kit
Part Number: CMB-03-0077
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Combo, MSD, 6AL, Digital, Distributor, Pro-Billet, Coil, Blaster 2, Plug Wires, Chevy, Small/Big Block, Kit
Part Number: CMB-06-0016
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Big Block Chevy Cylinder head, Aluminum, 335cc Rectangle Intake Runner, 122cc Chamber, 2.250 Intake Valve 1.880 Exhaust Valve, Max .725 Lift Ea.
Part Number: SUM-162BBCREC335
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 2 Hyd.Roller LS Firing Order, 218/227 Dur., 110 LSA + 1 Adv, .525/.520 1.5 Ratio, 1800-6250 RPM Range
Part Number: SUM-K1222
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 3 Hyd. Roller LS Firing Order, 224/232 Dur., 110 LSA + 2 Adv, .550/.540 1.5 Ratio, 2000-6300 RPM Range
Part Number: SUM-K1223
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Combo, Edelbrock, Performer, Intake Manifold, Carburetor, 600 CFM, Air Cleaner, Ford, Small Block, Kit
Part Number: CMB-03-0126
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Radiator/Fan Shroud Combo, LS Swap, Crossflow, Dual-Row, Aluminum, Natural, Transmission Cooler, 31.25 in. Wide, 18.62 in. High, 3.00 in.Thick, Kit
Part Number: SUM-381446-KIT1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Combo, Edelbrock, Performer, Intake Manifold, Carburetor, Holley, 600 CFM, Air Cleaner, Ford, Small Block, Kit
Part Number: CMB-03-0127
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 5 Hyd. Roller LS Firing Order, 242/251 Dur., 110 LSA + 4 Adv, .550/.550 1.5 Ratio, 2600-6600 RPM Range
Part Number: SUM-K1225
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Combo, Intake Manifold, 600 CFM Carburetor, Air Cleaner, Fuel Line, Gaskets, Bolts, Chevy, Small Block, Kit
Part Number: CMB-03-0193
Cannot be shipped Internationally if ordered today
Cannot be shipped Internationally if ordered today
Need It Sooner? We recommend these similar substitute parts:
Edelbrock Performer EPS Intake Manifold and Carburetor Kits 2021
Estimated Ship Date: Monday 3/2/2026
Cam and Lifter kit, Pro SBC Retrofit Stage 1 Hyd. Roller LS Firing Order,212/218 Dur., 110 LSA + 2 Adv, .525/.520 1.5 Ratio, 1500-6000 Range
Part Number: SUM-K1221
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 4 Hyd. Roller LS Firing Order, 232/242 Dur., 110 LSA + 3 Adv, .550/.550 1.5 Ratio, 2200-6400 RPM Range
Part Number: SUM-K1224
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Combo, Edelbrock, Performer, Intake Manifold, Carburetor, 600 CFM, Air Cleaner, Chevy, Small Block, Kit
Part Number: CMB-03-0124
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Disc Brake Kit, Rear, Manual or Power Assisted, Chevy/GMC,1963-87 truck, 5 Lug, Cast Iron, Red Calipers, Cross-drilled/Slotted Rotors, Kit
Part Number: SUM-BK3007
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Ignition Combo, MSD 6A Box, Blaster HVC Coil, Pro-Billet Distributor, SF Black Wires, Chevy, Small Block, Kit
Part Number: CMB-06-0120
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Combo, MSD, 6AL-2, Digital, Distributor, Pro-Billet, Coil, Blaster 2, Plug Wires, Chevy, Small/Big Block, Kit
Part Number: CMB-06-0015
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 6 Hyd. Roller LS Firing Order, 248/256 Dur., 110 LSA + 2 Adv, .550/.550 1.5 Ratio, 3000-7000 RPM Range
Part Number: SUM-K1226
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Disc Brake Kit, Rear, Manual or Power Assisted, Chevy/GMC,1963-87 truck, 6 Lug, Black Calipers, Cross-drilled/Slotted Rotors, Kit
Part Number: SUM-BK3000
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Forged Pro pistons BB Chevy 540, 4.5 bore, 1.120 C.H., 4.25 in. stroke, 6.535 rod, 8cc Dome 10.6@110cc, 10.2@114cc, 10:1@119cc.
Part Number: SUM-BBC540STD8L
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
SB Chevy Forged Steel crankshaft, 4.000 Stroke, 400 Mains, 2 Piece Rear Seal, Req. Narrowed Rod Bearings, Lightened, Nitride, 6.000 in. Rod
Part Number: SUM-SBC4004000
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Combo, Intake Manifold, 750 CFM Carburetor, Air Cleaner, Fuel Line, Gaskets, Bolts, Chevy, Small Block, Kit
Part Number: CMB-03-0192
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Summit 4340 Forged Crankshaft, SBF Windsor, 3.000 in Stroke, 28 oz. Balancer, Narrowed Rod Bearings, 1.375 Pilot Bearing, Designed for 5.090 in. Rod
Part Number: SUM-SBF3023000E
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
BB Ford 460 Forged Steel crank, 4.150 Stroke, Designed for 6.700 in. Rod, Nitride Hardened, Straight Shot oiling, Req's narrowed Rod Bearings
Part Number: SUM-BBF460415067
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster