Availability
Showing In Stock Items. Show All 62 Items.
Disc Brake Conversion, Rear, Cross-drilled/Slotted Rotors, Red Powdercoated Calipers, Chevy, Pontiac, Kit
Part Number: RSD-AFXRD07Z
Estimated Ship Date: Today
Estimated Ship Date: Today
BUILD IT WITH SUMMIT!
Wiring Harness, Dash Harness, Manual Transmission, With Seat Belt Ignition Interlock, Chevy, Each
Part Number: SUM-RP21130
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Rear disc brake conversion kit with built in parking brake assembly, '70-75 CJ-5 Dana 44, black powder coat
Part Number: TSB-A136BK
Estimated Ship Date: Today
Estimated Ship Date: Today
Floor Panel, Bed Floor Assembly, Steel, Black, 72 in. Width, 79 in. Length, Chevy, GMC, Each
Part Number: KPT-0850-322
Estimated Ship Date: Today
Estimated Ship Date: Today
Brake Conversion Kit
Part Number: RSD-F70RDM5Z
Not Yet Reviewed
Estimated Ship Date: Jan 21, 2026 if ordered today
Estimated Ship Date: Jan 21, 2026 if ordered today
Rear disc brake conversion kit with built in parking brake assembly, '73-87 Chevy 1/2ton, 4 Wheel drive, black powder coat
Part Number: TSB-A126BK
Estimated Ship Date: Today
Estimated Ship Date: Today
Lifters, Retrofit, Hydraulic Roller, with Vertical Link Bars, 0.875 in. O.D., for Early/Late Blocks/Tall Bosses, Ford, Lincoln, Mercury, Set of 16
Part Number: MEL-F1900RF16
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
$40.00 Mail-In Rebate
Price after Manufacturer Rebate: $896.99
Rebate Expires: 12/31/2025
Differential, Grip Pro Traction System, 30-Spline, GM 8.875 in. 12-Bolt Truck, Each
Part Number: PWT-GT248730
Estimated Ship Date: Feb 17, 2026 if ordered today
$40.00 Mail-In Rebate
Price after Manufacturer Rebate: $896.99
Rebate Expires: 12/31/2025
Estimated Ship Date: Feb 17, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Estimated Ship Date: Today
Disc Brake Kit, Drum to Disc Conversion, Rear, Solid Surface, Chevy, GMC, Kit
Part Number: TSB-A126R
Not Yet Reviewed
Estimated Ship Date: Jan 22, 2026 if ordered today
Estimated Ship Date: Jan 22, 2026 if ordered today
Connecting Rods, Forged 4340 Steel, Pro Sport H-Beam, 6.135 in. Length, ARP L19 Bolts, Chevrolet, Big Block Mark IV, Set of 8
Part Number: SCA-6613522L19
Not Yet Reviewed
Estimated Ship Date: Mar 6, 2026 if ordered today
Estimated Ship Date: Mar 6, 2026 if ordered today
Crankshaft, Excalibur, 2-Piece Seal, Internal Balance, Forged 4340 Steel, 3.875 in. Stroke, Chevy, 350, Each
Part Number: SCA-735076
Not Yet Reviewed
Estimated Ship Date: Mar 4, 2026 if ordered today
Estimated Ship Date: Mar 4, 2026 if ordered today
Connecting Rods, Forged 4340 Steel, Pro Sport H-Beam, Stroker, 6.125 in. Length, ARP L19 Bolts, Chevrolet, Small Block Gen I, LS, LT, Set of 8
Part Number: SCA-S0012
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, Forged 4340 Steel, Pro Sport H-Beam, 5.700 in. Length, ARP L19 Bolts, Chevrolet, Small Block Gen I, Set of 8
Part Number: SCA-6570021L19
Not Yet Reviewed
Estimated Ship Date: Mar 6, 2026 if ordered today
Estimated Ship Date: Mar 6, 2026 if ordered today
Ring and Pinion Gears, Dana 60, 4.88:1 Ratio, 29-spline, Standard Rotation, Dana 60, Chevrolet, Dodge, Ford, GMC, Jeep, Plymouth, Set
Part Number: SDH-2019214
Estimated Ship Date: Jan 29, 2026 if ordered today
Estimated Ship Date: Jan 29, 2026 if ordered today
Crankshaft, Excalibur, 2-Piece Seal, Internal Balance, Forged 4340 Steel, 3.750 in. Stroke, Chevy, 350, Each
Part Number: SCA-735056
Not Yet Reviewed
Estimated Ship Date: Mar 6, 2026 if ordered today
Estimated Ship Date: Mar 6, 2026 if ordered today
Crankshaft, Excalibur, 2-Piece Seal, Internal Balance, Forged 4340 Steel, 3.480 in. Stroke, Chevy, 350, Each
Part Number: SCA-735010
Not Yet Reviewed
Estimated Ship Date: Mar 6, 2026 if ordered today
Estimated Ship Date: Mar 6, 2026 if ordered today
Ring and Pinion Complete Kits, 3.73:1 Ratio, 26-spline, Standard Rotation, Dana 30, American Motors, Ford, Jeep, Volvo, Kit
Part Number: SDH-706503-3X
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Yukon front 4340 Chromoly axle kit for '72-'81 Dana 30 Jeep CJ with 27 splines
Part Number: YGA-21319
Not Yet Reviewed
Estimated Ship Date: Jan 26, 2026 if ordered today
Estimated Ship Date: Jan 26, 2026 if ordered today
Differential Carrier, Stock Replacement, Cast Iron, GM 8.5/8.625 in., 28-Spline, Buick, Cadillac, Chevrolet, GMC, Each
Part Number: RNB-697-800
Not Yet Reviewed
Estimated Ship Date: Jan 19, 2026 if ordered today
Estimated Ship Date: Jan 19, 2026 if ordered today
Connecting Rods, Forged 4340 Steel, Pro Sport H-Beam, 6.535 in. Length, ARP L19 Bolts, Chevrolet, Big Block Mark IV, Set of 8
Part Number: SCA-6653522L19
Not Yet Reviewed
Estimated Ship Date: Mar 6, 2026 if ordered today
Estimated Ship Date: Mar 6, 2026 if ordered today
Connecting Rods, Forged 4340 Steel, Pro Sport H-Beam, 6.000 in. Length, ARP L19 Bolts, Chevrolet, Small Block Gen I, Set of 8
Part Number: SCA-6600021L19
Not Yet Reviewed
Estimated Ship Date: Mar 6, 2026 if ordered today
Estimated Ship Date: Mar 6, 2026 if ordered today
Differential Case Assembly Kit
Part Number: SDH-707387-1X
Not Yet Reviewed
Estimated Ship Date: Jan 29, 2026 if ordered today
Estimated Ship Date: Jan 29, 2026 if ordered today
Disc Brake Caliper, Sport Twin, Quick-Change, Aluminum, 2-Piston, Semi-Metallic Pads, Front, Red Powdercoated, GM, Kit
Part Number: TSB-A185R
Not Yet Reviewed
Estimated Ship Date: Jan 22, 2026 if ordered today
Estimated Ship Date: Jan 22, 2026 if ordered today
Wiring Harness, Dash Harness, Manual Transmission, Without Seat Belt Ignition Interlock, Chevy, Each
Part Number: SUM-RP21132
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Lifters, Factory, Hydraulic Roller, OEM, Chevy, Big Block, Set
Part Number: MEL-BB817RF16
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.