Availability
1974 CHEVROLET Camshafts & Valvetrain
Showing In Stock Items. Show All Items.
Not Showing Customizable Items. View Customizable Items.
Lifter, Hydraulic Flat Tappet, Chevy, 0.842 in. Diameter, Set of 16
Part Number: SUM-HT81716
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
BUILD IT WITH SUMMIT!
Lifters, Hydraulic Roller, Link Bar, 0.842 in. Outside Diameter, 2.685 in. Seat Height, Retrofit, Small Block Chevy, Set of 16
Part Number: SUM-HT218-16
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Lifters, Street Series, Hydraulic Roller, Vertical Bar, Chevy, Small Block, Set of 16
Part Number: HRS-91164N
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 288/298, Lift .444/.466, Chevy, Small Block, Kit
Part Number: SUM-K1103
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Camshaft, Hydraulic Flat Tappet, Advertised Duration 288/298, Lift .444/.466, Chevrolet, Small Block, Each
Part Number: SUM-1103
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Camshaft/Lifter Set, Hydraulic Flat Tappet, Advertised Duration 279/297, Lift 0.479 in./0.465 in., for Gears and TC Upgrade, Small Block, Chevy, Kit
Part Number: CCA-K12-600-4
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Lifters, Hydraulic Roller, Link Bar, 0.842 in. Outside Diameter, 2.685 in. Seat Height, Big Block Chevy, Set of 16
Part Number: SUM-HT219-16
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam and Lifter kit, Pro SBC Stage 1 Hyd. Roller Cam, 204/214 Dur., 112 LSA + 1 Adv, .450/.450 1.5 Ratio, Idle-5800 Range, '87-02 Gen 1 Roller Block
Part Number: SUM-K8800
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam/Lifter, Valvetrain, Hydraulic Roller Tappet, Advertised Duration 283/303, Lift .547/.530, Chevy Big Block
Part Number: CCA-K11-600-8
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Lifters, Evolution Series Hydraulic Roller Lifters, Retrofit, 0.842 in. O.D., 2.475 in. Lifter Seat Height, Chevrolet, Small Block, Set of 16
Part Number: CCA-85301-16
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Rocker Arms, Fits 7/16 in. Stud, Full Roller, Steel, 1.70 Ratio, Chevy, Big Block, Set of 16
Part Number: CCA-1820-16
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Timing Chain and Gears, True Roller, Double Roller, 3 Bolt, Steel Sprockets, Chevy, Set
Part Number: SUM-G6600R-9
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Valve Springs, Retainers, Single Springs, Steel Retainers, Locks, Single Groove, Seals, Chevy Small Block, Kit
Part Number: SUM-174000
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Rocker Arm; Ultra Pro Magnum; Rocker Arm; Stud 7/16 in. Ratio 1.7 in.; Chevy Big Block 396-454 cid; 16 pc.
Part Number: CCA-1620-16
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Rocker Arms, 1.5 Ratio, 3/8 in. Stud, Full Roller, Stainless Steel, Natural, Small Chevy, SBC, Set of 16
Part Number: SUM-G6990
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 266/270, Lift .485/.495, Chevy, Small Block, Kit
Part Number: HRS-CL110235-12
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 290/298, Lift .560/.560, Chevy, Small Block, Kit
Part Number: HRS-CL111815-10
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Lifters, Evolution Series Hydraulic Roller Lifters, Retrofit, 0.842 in. O.D., 2.475 in. Lifter Seat Height, Chevrolet, Big Block, Set of 16
Part Number: CCA-85401-16
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam/Lifters, Valvetrain, Hydraulic Roller Tappet, Adv. Duration 270/276, Lift .510/.510, Chevy, Big Block, Kit
Part Number: CCA-K11-422-8
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Rocker Arms, Super-Street, Stud Mount, Full Roller, Aluminum, Narrow Body, 1.5 Ratio, Fits 3/8 in. Stud, Chevy, Small Block, Set of 16
Part Number: PRO-66907
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 272/278, Lift .525/.525, Chevy, Small Block, Kit
Part Number: HRS-CL111145-10
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Rocker Arms, 1.7 Ratio, 7/16 in. Stud, Full Roller, Stainless Steel, Polished, Big Block Chevy, BBC, Set of 16
Part Number: SUM-G6995
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam/Lifter, Valvetrain, Hydraulic Roller Tappet, Advertised Duration 291/311, Lift .558/.542, Chevy Big Block
Part Number: CCA-K11-601-8
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam and Lifters, Rattler, Hydraulic Roller Tappet, Advertised Duration 280/288, Lift .525/.530, Chevy, Small Block, Kit
Part Number: HRS-CL118005-09
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Belt Drive, 2-Piece Upper, Dry System, Chevy, Big Block, Mark IV, Kit
Part Number: JES-KBD-32000
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster