Availability
Cam/Lifters/Timing, Hydraulic Flat Tappet, Advertised Duration 284/296, Lift .507/.510, Chevy, Small Block
Part Number: CCA-SK12-250-3
Not Yet Reviewed
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Timing Chain and Gear Set, Magnum, Double Roller, Steel Sprockets, Pontiac, Set
Part Number: CCA-2112
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Timing Cover, 1-Piece, Steel, Gold Iridited, Chevy, Big Block, Each
Part Number: MIL-65605
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Push Rod, Steel, 5/16 in. Diameter, Ball/Ball Ends, 9.594 in. Length, Each
Part Number: MEL-MPR-301
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Rocker Arm, Stud Mount, Full Roller, Steel, 1.6 Ratio, Fits 7/16 in. Stud, Chevy, Small Block, Each
Part Number: CCA-1605-1
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Timing Chain and Gear Set, Red Series, Double Roller, Billet Steel Sprockets, Chevy, Small Block V6/V8, Set
Part Number: RMR-NA-CS1040
Not Yet Reviewed
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Timing Cover, 1-Piece, Steel, Black, Chevy, Small Block, Each
Part Number: MIL-65502
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 268/268, Lift .494/.494, Ford, 429, 460, Each
Part Number: CCA-34-227-4
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Rocker Arms, 3/8 in. Stud Mount, Roller Tip, Pushrods, Steel, 1.6 Ratio, Ford, Kit
Part Number: CCA-1431-KIT
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Timing Chain and Gear Set, Double Roller, Steel Sprockets, Chevy, V6/V8 Small Block, Set
Part Number: SME-7000
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Pushrods, Steel, 5/16 in. Diameter, Ball Tips, 7.500 in. Overall Length, Each
Part Number: MEL-MPR-324
Not Yet Reviewed
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Timing Chain and Gear Set, Double Roller, Iron/Steel Sprockets, Chevy, GMC, 454, Set
Part Number: CLO-C-3024K
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 290/290, Lift .578/.578, Chevy, Big Block, Kit
Part Number: CCA-CL11-450-8
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Lifters, Race, Hydraulic Flat Tappet Style, 0.875 in. o.d., Ford, Set of 16
Part Number: CCA-84035-16
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Rocker Arm, Stud Mount, Full Roller, Aluminum, 1.7 Ratio, Fits 7/16 in. Stud, Chevy, Big Block, Each
Part Number: CSP-2001-1
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Rocker Arm Shims, Pedestal Mounting Style, 0.016 in., 0.028 in., 0.060 in. Thickness, 0.870 in. I.D., Ford, Big Block FE, Set of 48
Part Number: PQX-9587050
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Rocker Arm, Left Hand Position, Non-roller, Shaft Mounting Style, 1.5 Ratio, Steel, Chrysler, Big Block, Each
Part Number: MEL-MR-850
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Timing Chain and Gears, Double Roller, Billet Steel Sprockets, Ford, 351C, Fits Scat Cranks, Set
Part Number: SCA-TCS10115
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Rocker Arm, Full Roller, Chromoly Steel, 7/16 in. Stud Mount, 1.60 Ratio, Ford, 289, 302, 351W, Each
Part Number: CCA-1632-1
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Camshaft, Hydraulic Flat Tappet, 274 int./274 exh. Advertised Duration, 0.442 int./0.442 exh. Lift, 108 Lobe Separation, Chevy, Each
Part Number: HPC-01-012
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Camshaft, Stage 1, OE Hydraulic Roller, Drag Race, 0.548 Intake, 0.548 Exhaust, 230/236 Duration, Chevy, Each
Part Number: AFR-6016
Not Yet Reviewed
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Rocker Arms, 7/16 in.Stud Mount, Full Roller, Chromoly Steel, 1.6 Ratio, Ford, Small Block, Set of 8
Part Number: CCA-1632-8
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 284/292, Lift .510/.505, Chevy, Small Block, Each
Part Number: ISK-201284-292-6
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Timing Chain and Gear Set, Red Series, Double Roller, Billet Steel Sprockets, AMC, L6, Set
Part Number: RMR-NA-CS7100
Not Yet Reviewed
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Lifters, Mechanical Roller, Horizontal Link Bar, 0.842 in. Diameter, No Offset, 1.890 in. Seat Height, Chevy, Small Block, Pair
Part Number: HRS-91119-1
Not Yet Reviewed
Estimated Ship Date: Monday 11/3/2025
Estimated Ship Date: Monday 11/3/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.