Availability
Exhaust Gaskets, Header, Copper, 4-Barrel Head, Mopar, Small Block LA, Pair
Part Number: SCE-4069
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Head Gasket, MLS, 4.040 in. Bore, .120 in. Compressed Thickness, Chrysler, Dodge, Plymouth, Each
Part Number: CGT-C5633-120
Not Yet Reviewed
Estimated Ship Date: Jan 26, 2026 if ordered today
Estimated Ship Date: Jan 26, 2026 if ordered today
Radiator Overflow Hose; 3/8" ID; 3-Rib Design; 3 Foot Length
Part Number: OER-B0056
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
original cast iron 4-piston Kelsey Hayes design caliper, stainless pistons, front, adapted for Mopar muscle disc brake conversion kits
Part Number: TSB-CPA-63-2
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Fuel Tank Mounting Straps, Dodge, Plymouth, Pair
Part Number: TNK-ST50
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Transmission Bracket, Steel, Natural, Chrysler, Dodge, Plymouth, Kit
Part Number: BMM-10462
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Grommet, PCV, Valve Cover, Chrysler, Dodge, Plymouth, Each
Part Number: RNB-42064
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Disc Brake Conversion, E-Brake, Rear, Cross-Drilled/Slotted Rotors, Red Calipers, Ford 9 in., Kit
Part Number: RSD-ZDCRD01Z
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Radiator Hose, Molded, Rubber, Black, Each
Part Number: DAC-70975
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Gauge Sending Units, Gas Tank Sending Units, Fuel Level Type, Electrical, Lever, 3/8 in. Feed Line Diameter, Dodge, Plymouth, Each
Part Number: AMD-881-1570-3R
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Brake Hose, Rubber/Steel, Front, Chrysler, Dodge, Plymouth, Each
Part Number: RSD-FH81
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Disc Brake Kit, Rear Conversion, Cross-drilled/Slotted Rotors, Zinc Plated Calipers, Chrysler, Dodge, Plymouth, Kit
Part Number: LEB-RC2001X
Not Yet Reviewed
Estimated Ship Date: Jan 2, 2026 if ordered today
Estimated Ship Date: Jan 2, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Throwout Bearing, 1 in. Shaft Diameter, Chrysler, Dodge, Plymouth, L6/V8, Each
Part Number: CTF-N1463
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Automatic Transmission Kickdown Cable, Hi-Tech, Black Vinyl, Natural Aluminum Fittings, Mopar, Torqueflite A-904, Kit
Part Number: LOK-KD-2904U
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Flywheel, Billet Steel, 130-Tooth, 29.3 lb., Internal Engine Balance, SFI 1.1, Mopar, Big, Small Block, Each
Part Number: CTF-700400
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Alternator, 60 Amp, One-Wire, V-Belt, Chrome, Chrysler, Dodge, Plymouth, Each
Part Number: TFF-8509RBSP
Estimated Ship Date: Feb 23, 2026 if ordered today
Estimated Ship Date: Feb 23, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Engine Cylinder Head Gasket
Part Number: CGT-C5506
Not Yet Reviewed
Estimated Ship Date: Jan 26, 2026 if ordered today
Estimated Ship Date: Jan 26, 2026 if ordered today
Main Bearings, 0.010 in. Crankshaft Undersize, Bi Metal, 1/2 Groove, Dodge, Plymouth, 340, Set of 5
Part Number: SLP-4923MA10
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Heater Hose, Standard, 1/2 in., Synthetic EPDM, Black, 50 Feet, Each
Part Number: DAC-80270
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
CAMSHAFT-ENGINE
Part Number: MEL-SPD-20
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Water Neck and Thermostat Housing, Stock, Steel, Natural, Chrysler, Dodge, Plymouth, Each
Part Number: RNB-902-3022
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Universal Joint, Super Strength, 7290 Style, Greasable, Steel, Each
Part Number: MOG-248
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Carburetor, Alcohol, 4150, 850 cfm, 4-Barrel, Down-Leg, Billet Metering Blocks, Dual Inlet, Each
Part Number: QFT-Q-850-A
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Shock, HQ, Monotube, 15.3 in./9.55 in. Extended/Collapsed Lengths, Stud/Eyelet Mounts, Each
Part Number: ART-22169856
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Gear, Ring and Pinion, 4.56:1 Ratio, Dana 60, Set
Part Number: RMG-6900531
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.