Availability
1968 Summit Racing Engines & Components
Camshaft, Hydraulic Flat Tappet, Advertised Duration 303/303, Lift .488/.488, Chevy, Small Block, Each
Part Number: SUM-1106
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, Tall, Perimeter Bolt Mounting, Steel, Black Powdercoated, Chevy, Small Block, Pair
Part Number: SUM-G3301B
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Water Pump Pulley, V-Belt, 2-Groove, Steel, Black, Chevy, Small Block, Short Water Pump, Each
Part Number: SUM-G3951B
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Chain and Gears, True Roller, Double Roller, Steel Sprockets, Chrysler, Dodge, Plymouth, Set
Part Number: SUM-G6603R-9
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rocker Arms, 1.6 Ratio, 3/8 in. Stud, Full Roller, Stainless Steel, Polished, Small Chevy, SBC, Set of 16
Part Number: SUM-G6991
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rocker Arms, Stud Mount, OEM-Style, Stamped Steel, 1.7 Ratio, Fits 7/16 in. Stud, Chevy, Big Block, Set of 16
Part Number: SUM-G6803
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 276/288, Lift .441/.441, Chrysler, Small Block
Part Number: SUM-K6901
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.6 Ratio, Fits 7/16 in. Stud, Ford, Small Block/351W, Set of 16
Part Number: SUM-G6941B
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 1 Hyd. Roller LS Firing Order,212/218 Dur., 110 LSA + 2 Adv, .525/.520 1.5 Ratio, 1500-6000 Range
Part Number: SUM-K1221
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rocker Arm Stud Girdle, Clamp-On, 7/16-20 in., Polylock, Aluminum, Black Anodized, Chevy, Big Block, Kit
Part Number: SUM-141003
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
PRO BBC H.R. 5 Hydraulic Roller Cam, 4/7 Swap, 232/242 Duration @ .050, 111 LSA + 6 Adv. , .620/.620 with 1.7 ratio, .656/.656 with 1.8, 3000-6500
Part Number: SUM-1255
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 278/288, Lift .421/.444, Chrysler, Small Block
Part Number: SUM-K6900
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pan, Steel, Black Zinc, 6 qt., Chevy, Big Block, Each
Part Number: SUM-G3604
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Combo, Cloyes, Timing Chain and Gear Set, Timing Cover, Cam Button, Lock Plate, RTV, Chevy, Small Block, Kit
Part Number: CMB-08-0019
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Timing Pointer, Billet Aluminum, Black, Adjustable, 8 in. Balancer, Chevy, Small Block, Each
Part Number: SUM-163800
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, Hydraulic Flat Tappet, 1,800-5,000 RPM Range, Advertised Duration 288 int./298 exh., Lift 444 int./466 exh., Pontiac, V8, Each
Part Number: SUM-2801
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pan, Steel, Natural, 4 qt., Chevy, Big Block, Each
Part Number: SUM-G3510X
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Water Pump Pulley, V-Belt, 2-Groove, Steel, Black, Chevy, Small Block, Long Pump, Each
Part Number: SUM-G3955B
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Adapter, Oil Filter, Non-Bypass, Aluminum, Black Anodized, 13/16-16 in. Thread, Each
Part Number: SME-2015
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Freeze Plugs, Brass, Chevy, Big Block, 396-454, Kit
Part Number: SUM-G1582
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, Mechanical Flat Tappet, Advertised Duration 287/297, Lift .504/.504, Chevy, Small Block, Each
Part Number: SUM-CT101
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.6 Ratio, Fits 7/16 in. Stud, Chevy, Small Block, Set of 16
Part Number: SUM-G6921B
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valves, Intake, Stainless Steel, 1.940 in. Diameter, .341 in. Stem, 4.911 in. Length, Chevy, Set of 8
Part Number: SUM-V8000-8
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Lifter, Hydraulic Flat Tappet, Ford, FE, V8, Set of 16
Part Number: SUM-HT208316
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pan, Steel, Black Zinc, 11 qt., Chevy, Big Block, Each
Part Number: SUM-G3607
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster