Filters
Crate Engine, GM 350 Small Block Stage 3, 290 HP, Long Block, External/Internal Engine Balance, Vortec Heads, Carburetor, Each
Part Number: HPE-HP99C
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Crate Engine, GM 350, Stage 1, Long Block, Internal/External Engine Balance, Cast Iron Heads, Chevy, 350, Each
Part Number: HPE-HP291P
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Engine Assembly, Stage 2 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each
Part Number: HPE-HP32M
Estimated Ship Date: Jul 21, 2025 if ordered today
Estimated Ship Date: Jul 21, 2025 if ordered today
Need It Sooner?
We recommend these similar substitute parts:
Estimated Ship Date: Monday 4/28/2025
Crate Engine, GM 350, Stage 3, Long Block, Internal/External Engine Balance, Cast Iron Heads, Chevy, 350, Each
Part Number: HPE-HP291PC
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Engine Assembly, Stage 1 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each
Part Number: HPE-HP32
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Engine Assembly, Stage 3 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each
Part Number: HPE-HP32C
Estimated Ship Date: Jun 11, 2025 if ordered today
Estimated Ship Date: Jun 11, 2025 if ordered today
Need It Sooner?
We recommend these similar substitute parts:
Estimated Ship Date: Monday 4/28/2025
Crate Engine, Base Long Block, Cast Iron Heads, Hydraulic Roller Camshaft, Chevy, 350, Each
Part Number: HPE-HP98
Estimated Ship Date: May 30, 2025 if ordered today
Estimated Ship Date: May 30, 2025 if ordered today
Crate Engine, Performance, Complete Long Block, Cast Iron Heads, Hydraulic Roller Camshaft, 4-Bolt Main, Internal/External Balance, Chevy, 350, Each
Part Number: HPE-HP98C
Estimated Ship Date: May 5, 2025 if ordered today
Estimated Ship Date: May 5, 2025 if ordered today
Crate Engine, Mid Dress Long Block, Cast Iron Heads, Hydraulic Roller Camshaft, Chevy, 350, Each
Part Number: HPE-HP98M
Estimated Ship Date: Jul 14, 2025 if ordered today
Estimated Ship Date: Jul 14, 2025 if ordered today
Crate Engine, GM 350, Stage 2, Long Block, Internal/External Engine Balance, Cast Iron Heads, Chevrolet, 350 CID, Each
Part Number: HPE-HP291PM
Estimated Ship Date: Jul 14, 2025 if ordered today
Estimated Ship Date: Jul 14, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Assembled, Checker, Cheverolet, GMC, Studebaker, 4.6L/283, Each
Part Number: VRE-DC46
Not Yet Reviewed
Crate Engine, Remanufactured, Long Block, Avanti, Buick, Checker, Chevrolet, GMC, Oldsmobile, Pontiac, 5.7L/350, Each
Part Number: VRE-VC01
Not Yet Reviewed
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.