Selected Filters


Loading...

Availability


1965 Ignition Components

Individual Parts

Results 51 - 75 of 1300

Distributor, Plug and Play, Hall Effect, Mechanical, Vacuum Advance, Black Cap, Chevy, Big/Small Block, Each

Part Number: PNX-D100710

3.92 out of 5 stars ( 12 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Crank Trigger, Flying Magnet, Chevy, Big Block, 8 in. Balancer, Kit

Part Number: MSD-8620

4.93 out of 5 stars ( 14 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor Conversion, Ignitor®, 12 V, Kit

Part Number: PNX-1181LS

4.83 out of 5 stars ( 93 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor, Pro-Billet, Magnetic Trigger, Mechanical Advance, Pontiac, 326-455, Each

Part Number: MSD-8563

4.8 out of 5 stars ( 15 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor, Electronic, Billet Aluminum, Magnetic Pickup, Brown Cap, Ignition Control, Mopar, BB, RB, Kit

Part Number: SUM-851005-1

4.82 out of 5 stars ( 17 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor Conversion, Ignitor II®, 12 V, Kit

Part Number: PNX-91181

4.34 out of 5 stars ( 65 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributors, Sniper EFI, HyperSpark, HEI Cap, Hall Effect, Ignition Module, Shiny Billet Housing, Chevy, Gen I, 262-400ci, Mark IV-V, 396-454ci, Each

Part Number: SNE-565-340

Not Yet Reviewed

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Ignition Combo, HEI Distributor, Blue Plug Wires, Chevy, Small Block, Kit

Part Number: SUM-CSUM2210

4.83 out of 5 stars ( 18 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Direct Fit Single Wire Electronic Ignition Distributor Conversion Kit , Delco Distributor, Negative Ground, 8 Cylinder, 12 V, Hall Effect, Kit

Part Number: SUM-RP20489

4.6 out of 5 stars ( 15 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor Gear, Melonized, 0.491 in. Diameter Shaft, Chevy, Each

Part Number: CCA-412M

4.53 out of 5 stars ( 15 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor, Pro-Billet Tach Drive, Magnetic Trigger, Mechanical, Vacuum Advance, Chevy, Big/Small Block, Each

Part Number: MSD-8572

5.0 out of 5 stars ( 10 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor, Pro-Billet, Male/HEI, with Red Cap, Magnetic Trigger, Mechanical Advance, Slip Collar, Iron Gear, O-rings, Chevy, Big/Small Block, Each

Part Number: MSD-85561

4.6 out of 5 stars ( 5 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor, Pro-Billet Ready-To-Run, Male/HEI, Vacuum and Mechanical, Black, Chevy, Small Block, Big Block, Each

Part Number: MSD-83603

4.83 out of 5 stars ( 6 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor Gear, Melonized, 0.500 in. Shaft, Chevy, Small, Big Block, Each

Part Number: SUM-850467-M

4.67 out of 5 stars ( 3 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributors, Holley EFI, Dual-Sync, Hall Effect, Computer-controlled Advance, Male/HEI, Black Cap, Iron Gear, Polished Housing, Chevy, 4.3-7.4L, Each

Part Number: HLY-565-200

1.0 out of 5 stars ( 5 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor Gear, Melonized, 0.500 in. Diameter Shaft, Chevy, Each

Part Number: CCA-410M

4.82 out of 5 stars ( 17 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor, HEI, Magnetic Pickup, Mechanical, Vacuum Advance, Black Cap, Ford, 221-302, Each

Part Number: SUM-850023

4.41 out of 5 stars ( 32 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Ignition Systems, Sniper 1 EFI, HyperSpark, Ignition Box, Coil, Distributor, Wire Harness, Ford, Small Block, Windsor, Kit

Part Number: SNE-565-301K

3.5 out of 5 stars ( 2 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Electronic Distributor Conversion, Ignitor III®, 12 V Negative Ground, Hall Effect, Mechanical/Vacuum Advance, w/Plates, Ring, Screws, Terminals, Kit

Part Number: PNX-71181

4.51 out of 5 stars ( 37 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor, Pro-Billet Ready-to-Run, Magnetic Trigger, Vacuum Advance, Pontiac, 350-455, Each

Part Number: MSD-8528

4.21 out of 5 stars ( 19 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor, Ready-to-Run, Magnetic Pickup, Vacuum Advance, Chrysler, 413, 426, 440, Hemi, Each

Part Number: SUM-850424

4.17 out of 5 stars ( 6 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor Conversion, Ignitor®, 12 V, Kit

Part Number: PNX-1261

4.85 out of 5 stars ( 33 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor, Plug and Play, Hall Effect, Vacuum Advance, .500 in. Shaft, Black Cap, Ford, Small Block, Each

Part Number: PNX-D130700

4.24 out of 5 stars ( 33 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributors, Sniper EFI, HyperSpark, HEI Cap, Hall Effect, Billet Housing, Polished, Ignition Module, Ford, Small Block, Windsor, Each

Part Number: SNE-565-301

3.27 out of 5 stars ( 15 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor, Billet, Magnetic Trigger, Mechanical Advance, Ford, 289, 302, 5.0L, Each

Part Number: MSD-8598

4.96 out of 5 stars ( 23 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air