Availability
1965 Summit Racing Engines & Components
Timing Cover, 2-Piece, Steel, Chrome Plated, Chevy, Small Block, Each
Part Number: SUM-G3230
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
PRO BBC H.R. 6 Hydraulic Roller Cam, 4/7 Swap, 242/252 Duration @ .050, 113 LSA + 10 Adv. , .620/.620 with 1.7 ratio, .656/.656 with 1.8, 3700-6600
Part Number: SUM-1256
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 278/290, Lift .471/.471, Ford, Small Block, Kit
Part Number: SUM-K3601
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 272/272, Lift .454/.454, Chrysler, Small Block
Part Number: SUM-K50052
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pan, Cast Aluminum, Finned, Polished, 5-Quart, Rear Sump, Passenger Dipstick, Chevy, Big Block Gen 4, Each
Part Number: SUM-G3524
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Engine Oil Dipstick with Tube, Driver Side, Engine Block Entry, Steel, Chrome, Chevy, Small Block, Each
Part Number: SUM-G3865
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam Button Spacer, Steel, Roller, Chevy, Small Block, Each
Part Number: SUM-G003
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Gear Drive, Quiet, Dual Idler, Chevy, Small Block, Set
Part Number: SUM-G6700-Q
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, Aluminum, Black, Tall Height, Finned, Ford, Small Block, Pair
Part Number: SUM-G3392B
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pan, Steel, Chrome Plated, 5 qt., Chevy, Small Block, Each
Part Number: SUM-G3500
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 298/304, Lift .466/.487, Chevy, Small Block, Kit
Part Number: SUM-K1105
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Cover Bolts, Steel, Zinc Plated, Allen Head, Chevy, Big, Small Block, Kit
Part Number: SUM-G3220
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Harmonic Balancer, SFI, Internal Balance, Steel, Clearcoated, Chrysler, 273, 318, 340, Each
Part Number: SUM-C4277
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, Tall, Fabricated Aluminum, Black Powdercoated, Chevy, Small Block, Pair
Part Number: SUM-440602
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Lifters, Hydraulic Roller, Link Bar, 0.903 in. Outside Diameter, 2.685 in. Seat Height, Dodge, Plymouth, Chrysler, Set of 16
Part Number: SUM-HT225-16
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Forged Pro Mopar BB "RB" 4340 Forged Steel H-Beam Connecting Rod, 6.760 in. Length, 1.094 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-MOP67601094
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Gears, Adjustable, Ford, Small Block/351W, 1-Piece Fuel Pump Eccentric Only, Set
Part Number: SUM-G6620R-BA
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Forged Pro Mopar SB 4340 Forged Steel I-Beam Connecting Rod, 6.123 in. Length, .984 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-MOP61238I
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Chain and Gears, True Roller, Double Roller, Steel Sprockets, Pontiac, V8, Set
Part Number: SUM-G6612R-9
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, Hydraulic Flat Tappet, Advertised Duration 298/303, Lift .466/.488, Pontiac, V8, Each
Part Number: SUM-2802
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Chain and Gears, Double Roller, Ford, Small Block Windsor, 302 Boss, For use with 1-piece Fuel Pump Eccentric, Set
Part Number: SUM-G6620R-9
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cylinder Head Studs, Extreme Duty, 6-Point Head, Chevy Small Block V-8, 1955-1999, Kit
Part Number: SUM-910528
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Filter Relocation Kit, Dual Filter, 72 in. Hose Length, Kit
Part Number: SUM-G4986-1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pump Pickup, High Volume, Press Fit, 8.250 in. Pan Depth, 0.625 in. Tube Diameter, Chevy, Small Block, Each
Part Number: SUM-G3502PHV
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, Aluminum, Polished, Stock Height, Finned, Chevy, Small Block, Pair
Part Number: SUM-440413
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster