Availability
1964 CHEVROLET CHEVELLE Parts and Accessories
Head Gasket, MLS Sparten, Multi-Layer Stainless Steel, 4.174 in. Bore, 0.074 in. Compressed Thickness, Chevrolet, Small Block, Each
Part Number: SCE-M111775
Not Yet Reviewed
Estimated Ship Date: Apr 23, 2026 if ordered today
Estimated Ship Date: Apr 23, 2026 if ordered today
Reference Books OEM Parts Catalog includes part number, common name, application, interchange & exploded view
Part Number: BSK-683
Not Yet Reviewed
Estimated Ship Date: Mar 23, 2026 if ordered today
Estimated Ship Date: Mar 23, 2026 if ordered today
Hood Latch, Billet Aluminum, Natural, Chevy, Each
Part Number: EMS-MS276-19M
Not Yet Reviewed
Estimated Ship Date: Apr 20, 2026 if ordered today
Estimated Ship Date: Apr 20, 2026 if ordered today
Control Arms, Rear Upper, Tubular, Red Powdercoated, Steel, Pair
Part Number: UPI-4044-R
Not Yet Reviewed
Estimated Ship Date: May 7, 2026 if ordered today
Estimated Ship Date: May 7, 2026 if ordered today
Control Arm Bushings, Rear, Polyurethane, Red, Buick, Chevrolet, Oldsmobile, Pontiac, Kit
Part Number: ENS-33-133R
Not Yet Reviewed
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Bushing, Transmission Mount, Chrome, Red, GM, Each
Part Number: ENS-3-1132R
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Cross Shaft, Differential, Steel, GM 8.2 in., with Mini-Spool, Each
Part Number: YGA-32237
Not Yet Reviewed
Estimated Ship Date: Apr 10, 2026 if ordered today
Estimated Ship Date: Apr 10, 2026 if ordered today
Complete Galfan Coated Steel Brake Line Kit for Convertible Power Disc Vehicles using 1 piece aftermarket prop Valve. Valve included
Part Number: OPS-S0002
Not Yet Reviewed
Estimated Ship Date: Apr 17, 2026 if ordered today
Estimated Ship Date: Apr 17, 2026 if ordered today
64 - 67 Chevelle Hardtop Brake line kit fits only power brakes with the included adj. valve. Includes Front Kit, Front to Rear Line, Valve and Bracket
Part Number: OPS-C6467ADJPV
Not Yet Reviewed
Estimated Ship Date: Apr 17, 2026 if ordered today
Estimated Ship Date: Apr 17, 2026 if ordered today
64 - 67 Chevelle Convertible and El Camino Brake line kit fits only power brakes and Pictured Valve. Includes Front Kit and Front to Rear Line.
Part Number: OPS-C6467CONVADJ
Not Yet Reviewed
Estimated Ship Date: Apr 17, 2026 if ordered today
Estimated Ship Date: Apr 17, 2026 if ordered today
Full Car Brake Line Kit - Fits 64-67 Chevelle/Malibu Convertible & El Camino - Stainless - Valve/Bracket Included
Part Number: OPS-C6467CONVPV2
Not Yet Reviewed
Estimated Ship Date: Apr 17, 2026 if ordered today
Estimated Ship Date: Apr 17, 2026 if ordered today
Wiring Harnesses, Factory-Fit, Rear Body Lamp, Convertible Models with Backup Lights, Standard Length, Chevy, Each
Part Number: AWW-CH47279
Not Yet Reviewed
Estimated Ship Date: May 18, 2026 if ordered today
Estimated Ship Date: May 18, 2026 if ordered today
Wiring Harnesses, Factory-Fit, Engine. Models with L6 Engine and Warning Lights, Standard Length, Chevy, Each
Part Number: AWW-CH48121
Not Yet Reviewed
Estimated Ship Date: May 18, 2026 if ordered today
Estimated Ship Date: May 18, 2026 if ordered today
Wiring Harnesses, Factory-Fit, Engine. Models with V8 Engine and Factory Gauges, Use with HEI Distributor, Standard Length, Chevy, Each
Part Number: AWW-CH48124H
Not Yet Reviewed
Estimated Ship Date: May 18, 2026 if ordered today
Estimated Ship Date: May 18, 2026 if ordered today
Wheel, Series 997 Type 8, 15 in. x 7 in., Steel, Matte Black, 5 x 4.75 in. Bolt Circle, 4.25 in. Backspace
Part Number: BRW-997573442
Estimated Ship Date: May 29, 2026 if ordered today
Estimated Ship Date: May 29, 2026 if ordered today
Balancer Hub, Internal Engine Balance, Buick, Chevy, GMC, Olds, Pontiac, Chevy Small Block, Each
Part Number: ATI-916951K
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Clutch Disc, Carbon Composite, 1 1/8 in.- 10-Spline, 10.4 in. Disc, AMC, GM, Each
Part Number: CTF-LM383271
Not Yet Reviewed
Estimated Ship Date: Mar 30, 2026 if ordered today
Estimated Ship Date: Mar 30, 2026 if ordered today
Intake Manifold Gaskets, AccuSeal Pro, Composite, Rectangular Port, Designed for Use with Large Port Cylinder Heads, Chevrolet, Small Block, Set of 20
Part Number: SCE-211128-10
Not Yet Reviewed
Estimated Ship Date: Apr 27, 2026 if ordered today
Estimated Ship Date: Apr 27, 2026 if ordered today
Dash Bezel, Plastic, Chrome, Chevy, Each
Part Number: OPG-CH20441
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Floor Mats, Floor Mats, Raylon 1964-74 GM A Body w/o Logo Dark Aqua (DA)
Part Number: OPG-ACC35DA
Not Yet Reviewed
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Floor Mats, Floor Mats, Raylon 1964-74 GM A Body w/o Logo Teal/Slate Blue 15
Part Number: OPG-ACC35TL
Not Yet Reviewed
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Floor Mats, Floor Mats, Raylon 1964-74 Chevelle Script Logo Dark Aqua (DA)
Part Number: OPG-ACC96DA
Not Yet Reviewed
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Floor Mats, ACC Carpeted, Front/Second Seat, Carpet, Dark Green, Chevelle Logo, Chevy, Set of 4
Part Number: OPG-ACC96DG
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Floor Mats, Raylon 1964-74 "Chevelle" Script Logo, Gold
Part Number: OPG-ACC96GD
Not Yet Reviewed
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Floor Mats, Raylon 1964-74 "Chevelle" Script Logo, Green Gold
Part Number: OPG-ACC96GG
Not Yet Reviewed
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster