Availability
Intake Manifolds, Holley EFI, LS Mid-Rise, Single Plane, Rectangular Port, Multi-port, Standard Deck, Aluminum, Satin Finish, Chevy, 6.0L, 6.2L, Each
Part Number: HLY-300-136
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Injection System, Sniper 2, Self-Tuning, Throttle body, Polished, 4150 Flange, 650 hp Max, 800 CFM, Inline Pump, PDM, 3.5 in. Display, Ford, Kit
Part Number: SNE-5505103PKSBF
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Carburetor, Street-Q, 850 cfm, 4-barrel, Square Bore, Mechanical Secondary, Polished, Each
Part Number: QFT-SQ-850
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Exhaust System, XP Series, Turbo-Back, 409 Stainless Steel, Passenger Side Exit, Natural, Polished Tip, Dodge, Pickup, Cummins, Kit
Part Number: MBR-S6104409
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Air Cleaner Assembly, Sniper, 14 in. Diameter, Round, Dropped, Steel, Black Finish, Embossed Logo, 4 in. Filter, Paper Element, Each
Part Number: SNE-120-541
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Headers, Racingheart, Long Tube, 2 1/8 in. Primary, 3 1/2 in. Collector, Stainless Steel, Natural, Ford, Mustang, Big Block Chevy Swap, Pair
Part Number: HOK-6234-2HKR
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Intake Manifold, Stealth, Dual Plane, Square Bore, Aluminum, Natural, Mopar, 318, 340, 360, Each
Part Number: WND-8022WND
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Ignition Coil Wiring Harnesses, Holley EFI, LS Coil Extension Harness, 36 in. Long, OE Connectors, Plug & Play, Techflex F6 Loom, Chevy, 4.8-70L, Pair
Part Number: HLY-558-326
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Pumps, Electric, In-Tank, Diecast Retrofit Module, 60 psi, 255 lph, Gasoline, Return Style, Each
Part Number: HLY-12-136
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Shifter Installation Kit, Competition Plus, M21 Muncie, 451, Chevy, Pontiac, Kit
Part Number: HUU-3734529
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Headers, Competition, Long Tube, Steel, Ceramic Coated, Chevy, GMC, 396-454, Pair
Part Number: HOK-2463-1HKR
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Gauge Sending Unit, SureFlo Performance, Fuel Level, Electrical, Thread-in, 20 ohms Empty, 115 ohms Full, -8 AN Feed Line, Dodge, 5.9L Diesel, Each
Part Number: FLE-S0379
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Battery Terminals, Brass, Post Adapters, M6, Pair
Part Number: XSP-580
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Shifter Installation Kit, Competition Plus, Muncie, M-22, 452/453/Super T-10, Code 454, Chevy, Kit
Part Number: HUU-3738611
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Injection System, Pro-Flo 4, Self-Learning, Sequential Multi-Port, Satin, 550 HP Max, 1965 and Later BB Chevy Rectangular Port, Kit
Part Number: EDL-35850
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Headers, Long Tube, Steel, Ceramic Coated, Chevy, Small Block, Pair
Part Number: BIG-31112FLT
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Pumps, Electric, In-Tank, Retrofit Module, 60 psi, 255 lph, Gasoline, Return Style, Each
Part Number: HLY-12-130
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Intake Manifolds, Single Plane, Carbureted, Standard Deck, 2,500-7,500 RPM Range, Aluminum, Satin Finish, 4150 Flange, Chevy, Gen I, 265ci-400ci, Each
Part Number: HLY-300-264
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Injection System, Sniper 2, Self-Tuning, Throttle body, Polished, 4150 Flange, 650 hp Max, 800 CFM, Inline Pump, PDM, 5.0 in. Display, Ford, Kit
Part Number: SNE-5505105PKSBF
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Manual Shifter, Indy 3-Speed, GMC/Chevy/Ford, Truck, Each
Part Number: HUU-5010016
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Pumps, Mechanical, 80 gph, 7.5 psi, 1/4-NPT Female Thread, Inlet and Outlet, Aluminum, Silver, Rotatable, Ford, 221-351ci, Windsor, Each
Part Number: HLY-12-833
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Throttle Body, Sniper EFI, Multi-port Injection, 90mm Bore, Billet Aluminum, Black Anodized, 4-bolt Pattern, IAC Provision, Chevy, LS, 4.8-7.0L, Each
Part Number: SNE-860008-1
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Ignition Systems, Sniper 1 EFI, HyperSpark, Ignition Box, Coil, Distributor, Wire Harness, AMC, 4.7L, 4.8L, 5.0L, 5.6L, 5.9L, 6.4L, 6.6L, Kit
Part Number: SNE-565-308K
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Lines, Sniper EFI, Fuel Crossover, -6 AN Hose, Braided, Aluminum Fittings, Black, with Pressure Regulator, for Stealth 4150, Throttle Body, Kit
Part Number: SNE-534-237
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Intake Manifolds, LS Modular, Lo-Ram EFI, Rectangular Port Head, Multi-port, 105mm Bore, Standard Deck, Aluminum, Black, Chevy, 6.0L, 6.2L, Each
Part Number: HLY-300-679BK
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.