Availability
Engine Management Systems, Terminator X, Up to 8-Injectors, 8-Coil, Analog input, CANBUS, Sensors, Controller, Chevy, 4.8-6.2L, 4x Cam, 58x Crank, Kit
Part Number: HLY-550-910
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Throttle Body, Sniper EFI, Multi-port Injection, 102mm Bore, Billet Aluminum, Black Anodized, Hardware, Cable Operated, Chevy, LS, 4.8-7.0L, Each
Part Number: SNE-860005-1
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Vacuum Pump, Black, 23 in/hg Maximum Vacuum, 12 V DC, Internal Vacuum Control, 7.75 in. Height, 6.5 in. Length, 6 in. Width, Each
Part Number: SUM-760140-B
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Engine Management Systems, Terminator X MAX, 8-EV1 Injectors, 8-Coil, Sensors, Trans and Tuner Controller, Chevy, LS, 5.7L, 1x Cam, 24x Crank, Kit
Part Number: HLY-550-926
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Injection Systems, Sniper EFI, Quadrajet, Throttle Body, Gold, Spread Bore Flange, Injectors, Fuel Pump, 255 lph, Regulator, Harness, Tuner, Kit
Part Number: SNE-550-869K
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Ignition Systems, Sniper 1 EFI, HyperSpark, Ignition Box, Coil, Distributor, Wire Harness, Ford, 351 Cleveland, Big Block 385 Series, Kit
Part Number: SNE-565-303K
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Engine Management Systems, Terminator X MAX, 8-Injectors, 8-Coils, Sensors, Chevy, LS, 4.8-6,0L, 1x Cam, 24x Crank, Kit
Part Number: HLY-550-930
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Injection System, Ultimate LS EFI, 500 HP, LS1/LS2/LS6, With Transmission Controller, Kit
Part Number: FIF-70007
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Distributor, Pro-Billet Ready-to-Run, Magnetic Pickup, Vacuum Advance, Ford, 289-302, Each
Part Number: MSD-8352
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Carburetor, VRS-4150, 850 cfm, 4-Barrel, 4150 or 4500 Flange, No Choke, Annular Boosters, Satin, 4-Corner Idle, TPS Provision, Each
Part Number: EDL-1308
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Injection System, Sniper 2, Self-Tuning, Throttle body, Black, 4150 Flange, 650 hp Max, 800 CFM, Inline Pump, PDM, 5.0 in. Display, Ford, Kit
Part Number: SNE-5505115PKSBF
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Injection Systems, Sniper EFI, Stealth 4500, Throttle Body, Polished, 4500 Flange, 1440 cfm, Fuel Injectors, Harness, Tuner, Kit
Part Number: SNE-550-841
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Cylinder Heads, Street Porting, Aluminum, Assembled, 72cc Chamber, 185cc Intake, Ford, Small Block, Pair
Part Number: AFR-1387
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Seat, Composite, FIA Rated, Black, Highback, 17 in. Width, Each
Part Number: VMS-96886689
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Engine Management Systems, Terminator X MAX, 8-EV6 Injectors, 8-Coils, Sensors, Trans Control, USB Cable, Chevy, LS, 4.8-6.2L, 4x Cam, 58x Crank, Kit
Part Number: HLY-550-928T
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Air Separator, Lift Pump, Titanium Signature Series, Moderate to Extreme, 165 GPH, Chevrolet, GMC, Duramax, Each
Part Number: FSY-TSC10165G
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Valve Covers, Track Series, Perimeter Bolt, Tall, Chevrolet Logo, Fabricated Aluminum, Black Gloss, Baffled, Chevy, 396ci, 402ci, 427ci, 454ci, Pair
Part Number: HLY-241-281
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Engine Management Systems, Terminator X, Up to 8-Injectors, 8-Coil, Analog, CANBUS, Sensors, USB Tuning Cable, Chevy, 4.8-6.0L, 1x Cam, 24x Crank, Kit
Part Number: HLY-550-904T
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Injection System, Pro-Flo 4 XT, Self-Learning, Sequential Multi-Port, Satin, 825 HP Max, 1965 and Later BB Chevy Rectangular Port, Kit
Part Number: EDL-35880
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Headers, Competition, Long Tube, Steel, Painted, Chevy, GMC, 396, 402, 427, 454, Pair
Part Number: HOK-2455HKR
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Injection Systems, Sniper EFI, BBD, Throttle Body, Natural Finish, BBD Flange, Injectors, Regulator, Harness, Tuner, Jeep, CJ5, CJ7, 4.2L, Kit
Part Number: SNE-550-858
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Fuel Injection System, Sniper 2, Self-Tuning, Throttle body, Polished, 4150 Flange, 650 hp Max, 800 CFM, Inline Pump, PDM, 5 in. Display, Kit
Part Number: SNE-550-510-5PK
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Engine Management Systems, Terminator X MAX, 8-EV6 Injectors, 8-Coils, Trans Control, Sensors, USB Cable, Chevy, LS, 5.7L, 1x Cam, 24x Crank, Kit
Part Number: HLY-550-919T
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
GM LS Turbo Exhaust Manifolds (except LS7 & LS9) - Natural Cast Finish
Part Number: HOK-8510HKR
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Carburetor, Street-Q, 750 cfm, 4-barrel, Square Bore, Mechanical Secondary, Polished, Each
Part Number: QFT-SQ-750
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.