Availability
Tools & Shop Equipment
Air Compressor, Expandable Airlink System, Vertical, 10 HP Alternating Pumps, Single Phase, 120 Gallon, Kit
Part Number: EMX-ESP10A120V1
Not Yet Reviewed
Estimated Ship Date: Mar 12, 2026 if ordered today
Estimated Ship Date: Mar 12, 2026 if ordered today
Air Compressor, Expandable Airlink System, Vertical, 10 HP Alternating Pumps, Three Phase, 120 Gallon, Kit
Part Number: EMX-ESP10A120V3
Not Yet Reviewed
Estimated Ship Date: Mar 12, 2026 if ordered today
Estimated Ship Date: Mar 12, 2026 if ordered today
Air Compressor, Silent Air, Vertical, 80 Gallon, Daul Stage, Triple Cylinder, 26 CFM, Splash Lube, 7.5 HP, Each
Part Number: EMX-ESS07V080Y1
Estimated Ship Date: Mar 12, 2026 if ordered today
Estimated Ship Date: Mar 12, 2026 if ordered today
AL100-150-30 1-1/2 Ton Aluminum Hand Chain Hoist with 30ft of Lift
Part Number: JPW-133124
Not Yet Reviewed
Estimated Ship Date: Feb 24, 2026 if ordered today
Estimated Ship Date: Feb 24, 2026 if ordered today
3 Ton Aluminum Hand Chain Hoist with 30ft of Lift AL100-300-30
Part Number: JPW-133330
Not Yet Reviewed
Estimated Ship Date: Feb 24, 2026 if ordered today
Estimated Ship Date: Feb 24, 2026 if ordered today
TS500-230-020,5-Ton Two Speed Electric Chain Hoist 3-Phase 20' Lift, MT500 Electric 2 Speed Trolley 3PH, and 4 Button Wired Pendant 16ft
Part Number: JPW-140129K
Not Yet Reviewed
Estimated Ship Date: Feb 24, 2026 if ordered today
Estimated Ship Date: Feb 24, 2026 if ordered today
TS050-230-020,1/2-Ton Two Speed Electric Chain Hoist 3-Phase 20' Lift, MT050 Electric 2 Speed Trolley 3PH, and 4 Button Wired Pendant 16ft
Part Number: JPW-140235K
Not Yet Reviewed
Estimated Ship Date: Feb 24, 2026 if ordered today
Estimated Ship Date: Feb 24, 2026 if ordered today
TS200-230-020,2-Ton Two Speed Electric Chain Hoist 3-Phase 20' Lift, MT200 Electric 2 Speed Trolley 3PH, and 4 Button Wired Pendant 16ft
Part Number: JPW-140240K
Not Yet Reviewed
Estimated Ship Date: Feb 24, 2026 if ordered today
Estimated Ship Date: Feb 24, 2026 if ordered today
TS100-460-020,1-Ton Two Speed Electric Chain Hoist 3-Phase 20' Lift, MT100-4 Electric 2 Speed Trolley 3PH, and 4 Button Wired Pendant 16ft
Part Number: JPW-144006K
Not Yet Reviewed
Estimated Ship Date: Feb 24, 2026 if ordered today
Estimated Ship Date: Feb 24, 2026 if ordered today
TS200-460-020,2-Ton Two Speed Electric Chain Hoist 3-Phase 20' Lift, MT200-4 Electric 2 Speed Trolley 3PH, and 4 Button Wired Pendant 16ft
Part Number: JPW-144009K
Not Yet Reviewed
Estimated Ship Date: Feb 24, 2026 if ordered today
Estimated Ship Date: Feb 24, 2026 if ordered today
Metal Dust Collector, MDC-1800, 3 HP, 220 V, 1,450 CFM, Each
Part Number: BAI-1017066
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Metal Downdraft Table, 230V 3Ø Metal Downdraft Table 48x40, Air Pulse Clean w/ HEPA Fitler (Side Walls and Work Light Inc.)
Part Number: BAI-1017589
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Metal Downdraft Table, 230V 3Ø Metal Downdraft Table 80x52, Air Pulse Clean w/ HEPA Filter (Side Walls and Work Light Inc.)
Part Number: BAI-1017590
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Welding Rotator, 220V 3Phase Welding Rotator, 12 Ton Capacity, 12"-110" Ø
Part Number: BAI-1017700
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Band Saw, Vertical, Variable Speed, 120 V, 14 in., Each
Part Number: BAI-1230388
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Band Saw, Dual Mitering, BS-20SA-DM, 220 V 3-Phase, 69-306 FPM, Each
Part Number: BAI-1001298
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Band Saws, BS-350SA, Metal Cutting, 220 V Single-phase, High-torque 2 hp Motor, Semi-auto, Dual Swivel Head, Degrees: 0-60 Right; 0-45 Left, Each
Part Number: BAI-1001570
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Floor Drill Press, 110/220V Single Phase (Prewired 110) 15" Varialble Speed Floor Drill Press
Part Number: BAI-1002989
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Pipe and Metal Bender Dies, Tubing Dies, Round, 2.000 in. Die Size, 6.000 in. Die Radius, 180 degree Die Set for Baileigh Part Number RDB-050, Each
Part Number: BAI-1003673
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Hand (Straight) Brake, Heavy Duty Manually Operated Hand (Straight) Brake, 10' Length, 16 Gauge Mild Steel Capacity
Part Number: BAI-1004639
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Rotary Draw Tube, Manual Rotary Draw Tube & Pipe Bender. 1-3/4" Tube Capacity. Maximum 10.5" CLR
Part Number: BAI-1006773
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Pipe and Metal Benders, RDB-250 Rotary Draw Benders, Computer-controlled, 9.0 in. Maximum Centerline Radius, Hydraulic Jack, Each
Part Number: BAI-1006791
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Ring Roll Bender, R-M40, 240 Volt, Each
Part Number: BAI-1006852
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Shears, 220 Volt Three Phase Hydraulic Powered Shear, 120.00 in. Length, 14 Gauge Mild Steel Capacity, Each
Part Number: BAI-1007071
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Metal Cutting Shear, Hydraulic, 220 V 3-Phase, 14-Gauge Maximum, 60 in. Length, Each
Part Number: BAI-1007176
Not Yet Reviewed
Estimated Ship Date: Mar 2, 2026 if ordered today
Estimated Ship Date: Mar 2, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster