Availability
Shop our selection of low-priced parts entering their final lap on Summit Racing’s store shelves. Grab them now before they’re gone!
Shop our selection of low-priced parts entering their final lap on Summit Racing’s store shelves. Grab them now before they’re gone!
Shop our selection of low-priced parts entering their final lap on Summit Racing’s store shelves. Grab them now before they’re gone!
Showing In Stock Items. Show All 430 Items.
Power Reeds, Pro Series, ATV, Carbon Fiber/Fiberglass, Yamaha, YFZ350, Kit
Part Number: BOE-PRO-86
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
BUILD IT WITH SUMMIT!
Professor Overdrive and the Summit™ team of tech experts have been answering the burning questions of...
Not Yet Reviewed
$22.99
—
$24.99
$12.50
—
$16.50
S/M REPLACEMENT PETALS ORDER 1
Part Number: BOE-PRO-136
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Quick Change Gears, Professional, 10-Spline, E 9310 Steel, Set 25, 20/22 Teeth, Set
Part Number: SGB-25-PRO
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Quick Change Gears, Professional, 10-Spline, E 9310 Steel, Set 15, 19/20 Teeth, Set
Part Number: SGB-15-PRO
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Quick Change Gears, Professional, 10-Spline, E 9310 Steel, Set 14, 23/32 Teeth, Set
Part Number: SGB-14-PRO
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Quick Change Gears, Professional, 6-Spline, E 9310 Steel, Set 618, 20/34 Teeth, Set
Part Number: SGB-618-PRO
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Quick Change Gears, Professional, 6-Spline, E 9310 Steel, Set 630, 18/36 Teeth, Set
Part Number: SGB-630-PRO
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Quick Change Gears, Professional, 10-Spline, E 9310 Steel, Set 17, 19/22 Teeth, Set
Part Number: SGB-17-PRO
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Quick Change Gears, Professional, 10-Spline, E 9310 Steel, Set 22, 19/25 Teeth, Set
Part Number: SGB-22-PRO
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Quick Change Gears, Professional, 6-Spline, E 9310 Steel, Set 624, 23/30 Teeth, Set
Part Number: SGB-624-PRO
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Quick Change Gears, Professional, 6-Spline, E 9310 Steel, Set 618A, 15/26 Teeth, Set
Part Number: SGB-618A-PRO
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Quick Change Gears, Professional, 6-Spline, E 9310 Steel, Set 617, 20/33 Teeth, Set
Part Number: SGB-617-PRO
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
PRO BBC H.R. 4 Hydraulic Roller Cam, 4/7 Swap, 224/232 Duration @ .050, 110 LSA + 5 Adv. , .620/.620 with 1.7 ratio, .656/.656 with 1.8, 2800-6300
Part Number: SUM-1254
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Pro SBC Stage 6 Hyd. Flat-Tappet 4/7 Firing Order Swap Cam, 242/248 Dur., 108 LSA + 2 Adv, .510/.518 1.5 Ratio, .544/.553 1.6 Ratio, 2600-6600 Range
Part Number: SUM-1205
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Collectable Cars, 1:64 Scale, 1974 Chevrolet Vega Pro Stock, Summit Racing Equipment®, NHRA, Mattel, Hotwheels, Each
Part Number: MAT-GRK63
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
5.7 Pro Hemi Truck 2 Hydraulic Roller Cam, 212/218 Duration @.050, 111.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 1800-6200 Range, Each
Part Number: SUM-5722
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Pushrods, Chromoly, Heat-Treated, 3/8 in. Diameter, 7.800 in. Length, Universal, Set of 16
Part Number: PRO-66406C
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Air Filter Assembly, Round, Aluminum, Gray Metalic, 14 in. Diameter, 3 in. Height, Drop Base, Kit
Part Number: PRO-66809
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Slim-Fit Radiator System, Universal, 21.40 in. Wide, 18.50 in. High, 1,650 cfm Fan, Kit
Part Number: PRO-69590-17
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Oil Pan Drain Plug, No-Mess Drain, 1/ 2-20 RH in. Threads, Seal, Each
Part Number: PRO-66960
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
5.7 Pro Hemi Truck 1 Hydraulic Roller Cam, 206/212 Duration @.050, 110.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 1600-6000 Range, Each
Part Number: SUM-5721
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Pro SBC Stage 8 Hyd.Flat-Tappet 4/7 Firing Order Swap Cam, 252/258 Dur., 107 LSA + 1.5 Adv, .533/.540 1.5 Ratio, .569/.576 1.6 Ratio, 3200-7200 Range
Part Number: SUM-1207
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
PRO BBC H.R. 1 Hydraulic Roller Cam, 4/7 Swap, 204/214 Duration @ .050, 110 LSA + 4 Adv. , .510/.510 with 1.7 ratio, .540/.540 with 1.8, Idle-5600
Part Number: SUM-1251
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
5.7 Pro Hemi Truck 3 Hydraulic Roller Cam, 218/224 Duration @.050, 112.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 2200-6400 Range, Each
Part Number: SUM-5723
Not Yet Reviewed
Estimated Ship Date: Monday 1/12/2026
Estimated Ship Date: Monday 1/12/2026
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.