Availability
Air Compressor, General Use, EMAX Stationary 41 HP Turbocharged Tier 4 Final Kubota Diesel Driven 185 CFM Rotary Screw, Each
Part Number: EMX-EDS185ST
Not Yet Reviewed
Estimated Ship Date: Oct 3, 2025 if ordered today
Estimated Ship Date: Oct 3, 2025 if ordered today
Air Compressor, General Use, EMAX Trailer Mounted 41 HP Turbocharged Tier 4 Final Kubota Diesel Driven 185 CFM Rotary Screw, Each
Part Number: EMX-EDS185TR
Not Yet Reviewed
Estimated Ship Date: Oct 3, 2025 if ordered today
Estimated Ship Date: Oct 3, 2025 if ordered today
Industrial Plus 20 Hp 3-Phase 2-Stage 120 With 115 Cfm Dryer Bundle-208/230/460 Voltage Opt.
Part Number: EMX-S0010
Not Yet Reviewed
Estimated Ship Date: Oct 3, 2025 if ordered today
Estimated Ship Date: Oct 3, 2025 if ordered today
Industrial Plus 25 Hp 3-Phase 2-Stage 120 With 144 Cfm Dryer Bundle -208/230/460 Voltage Opt.
Part Number: EMX-S0011
Not Yet Reviewed
Estimated Ship Date: Oct 3, 2025 if ordered today
Estimated Ship Date: Oct 3, 2025 if ordered today
Jack, EV/Hybrid Component Lift Table, 3,300 lb. Capacity, Hydraulic/Pneumatic, Steel, Blue Finish, 72.6 in. Lift, 67.3 in. Long, 35.4 in. Wide, Each
Part Number: IDD-LT-EV3300DCX
Not Yet Reviewed
Estimated Ship Date: Sep 29, 2025 if ordered today
Estimated Ship Date: Sep 29, 2025 if ordered today
20 Ton Air/Hydraulic Service Jack
Part Number: OTC-HDJ20P
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Cutting Shear, 40-Ton C, Ironworker, Metal, 0.500 in. Cutting Thickness, 115 V, Each
Part Number: EDW-IW40C-1P120
Not Yet Reviewed
Estimated Ship Date: Sep 29, 2025 if ordered today
Estimated Ship Date: Sep 29, 2025 if ordered today
PSB SIDE DOWNDRAFT-B (ASY) 26L-14W-9H ID - (1PH-230V)
Part Number: IDD-S0039
Not Yet Reviewed
Estimated Ship Date: Sep 29, 2025 if ordered today
Estimated Ship Date: Sep 29, 2025 if ordered today
PSB SEMI DOWNDRAFT-B (ASY) 26L-14W-9H ID - (1PH-230V)
Part Number: IDD-S0058
Not Yet Reviewed
Estimated Ship Date: Sep 29, 2025 if ordered today
Estimated Ship Date: Sep 29, 2025 if ordered today
PSB SIDE DOWNDRAFT-B (ASY) 26L-14W-9H ID - (3PH-230V)
Part Number: IDD-S0038
Not Yet Reviewed
Estimated Ship Date: Sep 29, 2025 if ordered today
Estimated Ship Date: Sep 29, 2025 if ordered today
PSB AF CROSS FLOW-B (ASY) 22.6L-13W-8.6H ID - (1PH-230V)
Part Number: IDD-S0044
Not Yet Reviewed
Estimated Ship Date: Sep 29, 2025 if ordered today
Estimated Ship Date: Sep 29, 2025 if ordered today
Shock Dyno, 3 HP High Speed, with 40 in. Masts, Each
Part Number: ICP-102092-40
Not Yet Reviewed
Estimated Ship Date: Oct 10, 2025 if ordered today
Estimated Ship Date: Oct 10, 2025 if ordered today
Crane Hoists, Crane Hoists
Part Number: RWC-123413
Not Yet Reviewed
Estimated Ship Date: Oct 20, 2025 if ordered today
Estimated Ship Date: Oct 20, 2025 if ordered today
Crane Hoists, Crane Hoists
Part Number: RWC-123419
Not Yet Reviewed
Estimated Ship Date: Oct 20, 2025 if ordered today
Estimated Ship Date: Oct 20, 2025 if ordered today
Crane Hoists, Crane Hoists
Part Number: RWC-123308
Not Yet Reviewed
Estimated Ship Date: Oct 20, 2025 if ordered today
Estimated Ship Date: Oct 20, 2025 if ordered today
BLVS200-010 2 Ton Electric Chain Hoist 1-Phase 10' Lift
Part Number: JPW-104044
Not Yet Reviewed
Estimated Ship Date: Sep 19, 2025 if ordered today
Estimated Ship Date: Sep 19, 2025 if ordered today
PM2000B, 5HP 1PH 230V, 50" RIP, RLIFT
Part Number: PMC-PM25150RK
Not Yet Reviewed
Estimated Ship Date: Sep 30, 2025 if ordered today
Estimated Ship Date: Sep 30, 2025 if ordered today
BOSCH KIT, VCI FOR USER PC
Part Number: BGS-3824BSC
Not Yet Reviewed
Estimated Ship Date: Oct 6, 2025 if ordered today
Estimated Ship Date: Oct 6, 2025 if ordered today
Shears, 220 Volt Three Phase Heavy-Duty Hydraulic Shear, 52.00 in. Length, 10 Gauge Mild Steel Capacity, Each
Part Number: BAI-1007122
Not Yet Reviewed
Estimated Ship Date: Sep 25, 2025 if ordered today
Estimated Ship Date: Sep 25, 2025 if ordered today
Pipe and Metal Benders, Ring Roll Bender, R-M55, Horizontal/Vertical, 220 V Single-phase, Manual, Analog, Foot Pedal Controls, Each
Part Number: BAI-1006855
Not Yet Reviewed
Estimated Ship Date: Sep 25, 2025 if ordered today
Estimated Ship Date: Sep 25, 2025 if ordered today
Hydraulic Radial Drill, 220 Volt Three Phase Hydraulic Radial Drill, MT5 Spindle, Includes Quick and Tappinig Chuck
Part Number: BAI-1008486
Not Yet Reviewed
Estimated Ship Date: Sep 25, 2025 if ordered today
Estimated Ship Date: Sep 25, 2025 if ordered today
Mechanical Radial Drill, 220 Volt Three Phase Mechanical Radial Drill, MT4 Spindle, Includes Quick and Tappinig Chuck
Part Number: BAI-1008487
Not Yet Reviewed
Estimated Ship Date: Sep 25, 2025 if ordered today
Estimated Ship Date: Sep 25, 2025 if ordered today
Metal Downdraft Table, 230V 3Ø Metal Downdraft Table 48x40, Air Pulse Clean w/ HEPA Fitler (Side Walls and Work Light Inc.)
Part Number: BAI-1017589
Not Yet Reviewed
Estimated Ship Date: Sep 25, 2025 if ordered today
Estimated Ship Date: Sep 25, 2025 if ordered today
Horizontal Press Brake, 220 Volt Three Phase 45 Ton Horizontal Press Brake with NC Controller. 36" Working Table Height.
Part Number: BAI-1004703
Not Yet Reviewed
Estimated Ship Date: Sep 25, 2025 if ordered today
Estimated Ship Date: Sep 25, 2025 if ordered today
Sheet Metal Notcher, 220/440V 60 Hz 3Phase 4 Gauge (6mm) Hydraulic Variable Angle Sheet Metal Notcher
Part Number: BAI-1007269
Not Yet Reviewed
Estimated Ship Date: Sep 25, 2025 if ordered today
Estimated Ship Date: Sep 25, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.