Availability
Showing In Stock Items. Show All 147 Items.
Camshaft, BTR, Truck Norris Cam, 212 int. Duration, 0.553 in./0.553 in. Lift, 107 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Gen III/IV LS, Each
Part Number: BTC-TRUCKNORRIS
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
BUILD IT WITH SUMMIT!
Ignition Coil, Ford Mod Motor Coil-On-Plug, 50,000 V, Epoxy, Female/Socket, Black, Ford, Modular, 5.0L, Set of 8
Part Number: SUM-850575
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Torque Converter, Tork Master, 2,300-2,500 rpm Stall Range, Chevy, THM350/THM400, Each
Part Number: BMM-20404
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Camshaft, Hydraulic Roller, OE Roller, Street/Strip Use, 212 Intake Duration, 0.498 in./0.498 in. Lift, Chevrolet, Small Block LS, Each
Part Number: BTC-S0393
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Torque Converter, Tork Master, 1,900-2,100 rpm Stall Range, Chevy, THM350/THM400, Each
Part Number: BMM-20400
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Torque Converter, Tork Master, 2,300-2,500 rpm Stall Range, Chevy, 4L60/4L60E/700R4, Each
Part Number: BMM-70418
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Computer Programmer, inTune i3 Platinum, Buick, Cadillac, Chevy, GMC, Hummer, Pontiac, Each
Part Number: DBL-8245
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Battery, Dry Cell, 12 V, Deep Cycle/Starting, 850 Cold Cranking Amps, Top/Side Posts, 34/78 Group, Each
Part Number: ODY-3478PC1500DT
Cannot be shipped Internationally
Cannot be shipped Internationally
Computer Programmer, inTune i3 Platinum, Chrysler, Dodge, Ram, Each
Part Number: DBL-8345
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Torque Converter, Tork Master, 1,900-2,000 rpm Stall Range, Chevy, 4L60, 4L60E,700R4, Each
Part Number: BMM-70420
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Battery, Dry Cell, 12 V, Deep Cycle/Starting, 950 Cold Cranking Amps, Top Stud, Series 65, Each
Part Number: ODY-65-PC1750T
Cannot be shipped Internationally
Cannot be shipped Internationally
Camshaft, BTR, L83 Stage 2, 212 int., 223 exh Duration, 0.540 in./0.540 in. Lift, 111 Lobe Sep, 1-Bolt, 5.3L, 6.2L, Gen V LS, 14% Fuel Lobe, Each
Part Number: BTC-2241023116R1
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Radiator Fan, Dual, Electric, Jetstreme, Nylon, Black, 12.0 in. Diameter, 3,130 cfm, Each
Part Number: MAR-MJS22K
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Camshafts, BTR, LS3 Stage 3 V2, 227 int. Duration, 0.636 int./0.636 exh. Lift, 111.5 LSA, 3-Bolt, Chevy, LS3, 6.2L, Each
Part Number: BTC-BTRLS3STAGE3
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Radiator Fan, Dual, Controller, Electric, Jetstreme, Nylon, Black, 12.0 in. Diameter, 2,300 cfm, Each
Part Number: MAR-MJS23KC
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Camshaft, BTR, Stage 2 Truck V2, No Springs Required, 212 int./218 exh. Duration, 0.480 in./0.480 in. Lift, 111 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-31218110NSR
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Camshaft, V2 Series, Hydraulic Roller, Retro-fit, Street/Strip Use, LS1 Stage 3 V2, 227 Intake Duration, 0.636 in./0.636 in. Lift, Chevrolet, LS, Each
Part Number: BTC-BTRLS1STAGE3
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Ignition Coil, Pro Series, Coil Pack, Epoxy, Female/Socket, Black, 60,000 V Max, Chevy, Small Block LS, Set of 8
Part Number: GRN-28-0512-CP
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Radiator Fan, Dual, Electric, Jetstreme, Nylon, Black, 12.0 in. Diameter, 2,300 cfm, Each
Part Number: MAR-MJS23K
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Camshaft, BTR Stage 2 Turbo V2, Hydraulic Roller, 220 int./223 exh. Duration, 0.618 in./0.618 in. Lift, 113 LSA, 3-Bolt, Chevy, GMC, Each
Part Number: BTC-BTRTURBOSTG2
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Camshaft, Hydraulic Roller, OE Roller, Supercharged Use, 226 Intake Duration, 0.636 in./0.636 in. Lift, Chevrolet, 6.2L LS, Each
Part Number: BTC-S0402
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Harmonic Balancer, Super Damper, External Balance, Steel, Black, Chevy, 454, Each
Part Number: ATI-917740
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Camshaft, V2 Series, Hydraulic Roller, Turbocharged Use, Stage 3 Turbo, 224 Intake Duration, 0.618 in./0.618 in. Lift, Chevy, 4.8/5.3/6.0/6.2L, Each
Part Number: BTC-BTRTURBOSTG3
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Camshaft, BTR LS3 Stage 4 V2, 233 int./25X exh. Duration, 0.636 in./0.636 in. Lift, 111 LSA, 3-Bolt, 6.2L, Each
Part Number: BTC-BTRLS3STAGE4
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Camshaft, BTR, Stage 4 Truck V2, 224 int./230 exh. Duration, 0.553 in./0.553 in. Lift, 109 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-BTR32430090
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Camshaft, BTR, Stage 2 Truck V2, 212 int./218 exh. Duration, 0.553 in./0.553 in. Lift, 111 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-BTR31218110
Not Yet Reviewed
Estimated Ship Date: Monday 10/27/2025
Estimated Ship Date: Monday 10/27/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.