Availability
Front Suspension Packages, Superide, Crossmember, Tubular Control Arms, Manual Rack and Pinion, Coilover Shocks and Springs, Ford, Mercury, Kit
Part Number: HDT-BX-360-10
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Superide, Crossmember, Tubular Control Arms, Manual Rack and Pinion, Coilover Shocks and Springs, Ford, Mercury, Kit
Part Number: HDT-BX-360-12
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Mustang II, Crossmember, Spindles, Rack and Pinion, Designed for Use In Right Hand Drive Models Only, Ford, Mercury, Kit
Part Number: HDT-PM320EKRH
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Superide, Crossmember, Tubular Control Arms, Manual Rack and Pinion, Coilover Shocks and Springs, Ford, Mercury, Kit
Part Number: HDT-BX-350-2
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Superide, Crossmember, Tubular Control Arms, Manual Rack and Pinion, Coilover Shocks and Springs, Ford, Mercury, Kit
Part Number: HDT-BX-350-4
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Superide, Crossmember, Tubular Control Arms, Manual Rack and Pinion, Coilover Shocks and Springs, Ford, Mercury, Kit
Part Number: HDT-BX-350-6
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Rear Suspension Packages, 4-Link Kits, Coilover Shocks and Springs, Panhard Bar, Ford, Each
Part Number: HDT-RB-113
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Suspension Link Kits, 4-Link Kits, Crossmember, Shock Mounts, Ford, Mercury, Kit
Part Number: HDT-RF-110
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Mustang II, Crossmember, Control Arms, Manual Rack and Pinion, Disc Brake Kit, Tie Rod Ends, Ford, Kit
Part Number: HDT-PX-105-E-K
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Rear Suspension Packages, 4-Link Kits, Coilover Shocks and Springs, Chevrolet, Each
Part Number: HDT-RB-112
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Rear Suspension Packages, 4-Link Kits, Coilover Shocks and Springs, Panhard Bar, Chevrolet, Each
Part Number: HDT-RB-114
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Suspension Link Kits, 4-Link Kits, Crossmember, Shock Mounts, Chevrolet, Pontiac, Kit
Part Number: HDT-RC101WTH
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Superide II, Crossmember, Tubular Control Arms, Power Rack and Pinion, 550 lbs./in. Spring Rate, Chevrolet, Kit
Part Number: HDT-BX-307-6
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Superide II, Crossmember, Tubular Control Arms, Power Rack and Pinion, 550 lbs./in. Spring Rate, Ford, Kit
Part Number: HDT-BX-316-5
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Superide II, Crossmember, Tubular Control Arms, Power Rack and Pinion, 550 lbs./in. Spring Rate, Ford, Kit
Part Number: HDT-BX-316-6
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
1970-1974 Cuda and Challenger bolt in 4 link rear suspension. Includes subframe connectors, springs and adjustable coilover shocks
Part Number: HDT-MO-200
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Superide, Crossmember, Control Arms, Power Rack and Pinion, Coilover Shocks and Springs, 400 lbs./in. Rate, Ford, Kit
Part Number: HDT-BX-667
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Superide, Crossmember, Tubular Control Arms, Manual Rack and Pinion, Ford, Mercury, Kit
Part Number: HDT-BX-350-1
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Mustang II, Crossmember, Control Arms, Manual Rack and Pinion, Front Brake Calipers, Slotted Surface Rotors, Kit
Part Number: HDT-KX-101-E-K
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Superide II, Crossmember, Tubular Control Arms, Power Rack and Pinion, 550 lbs./in. Spring Rate, Chevrolet, Kit
Part Number: HDT-BX-306-6
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Nova Subframe/Crossmember, 5 x 4 3/4 in. Wheel Bolt Circle, Tubular Control Arms, Manual Rack and Pinion, Chevrolet, Kit
Part Number: HDT-CX320SK
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Disc Brake Kits, Front, Manual or Power Assist, Cross-drilled Surface Rotors, 6-piston Calipers, Chevrolet, Ford, Pontiac, Kit
Part Number: HDT-DFE-223-D-B
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Superide, Steel Crossmember, Tubular Control Arms, Ford, Kit
Part Number: HDT-BX-203
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Superide, Crossmember, Tubular Control Arms, Power Rack and Pinion, Chevrolet, Kit
Part Number: HDT-BX-306
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Front Suspension Packages, Packages, Mustang II, Tubular Control Arms, Manual Rack and Pinion, 350 lbs./in. Spring Rate, Chevy, Kit
Part Number: HDT-CX-308-E-K-4
Not Yet Reviewed
Estimated Ship Date: Dec 22, 2025 if ordered today
Estimated Ship Date: Dec 22, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.