Availability
Summit Racing Parts and Accessories
Differential Cover, Steel, Chrome, Dana 44, Kit
Part Number: SUM-730307
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Heater Hose, Silicone, Black, 3/8 in. ID, 5 ft. Long, Each
Part Number: SUM-294020
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Distributor, Replacement Magnetic Pickup, for SUM-850422, SUM-850423 & SUM-850424 Distributor, Each
Part Number: SUM-850540
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Mmmmmm … Turbo. Eat Sleep Race Turbo Donut T-shirts are tasty looking tops cut from 100 percent heavyweight...
$30.99
When Summit Racing Equipment® expanded to a fourth location, the great state of Texas offered the perfect...
$20.99
—
$23.99
Shock/Strut, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SUM-G7742
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Alternator Conversion Kit, One-Wire, Kit
Part Number: SUM-1667
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Flaring Tool, On Car, 45 Degree Double Flare, 3/16 in. Tubing, Each
Part Number: SUM-900318
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Hose, Premium Braided Nylon, Black, -10 AN, 3 ft. Length, Each
Part Number: SUM-240003BP
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Gauge, Digital, Voltmeter, 7-25.5 V, 2 1/16 in. Diameter, Black Face, White Numbers, Each
Part Number: SUM-G2983-1W
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Paint, Single Stage, Hot Rod Flat, Acrylic Urethane, Flat, White, 1 Quart, Each
Part Number: SUM-UP345Q
Cannot be shipped Internationally
Cannot be shipped Internationally
Alternator Pulley, V-Belt, 1-Groove, Aluminum, Natural, .642 in. Bore, Bolt-On, GM/Ford, Each
Part Number: SUM-G3969
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Spark Plug Wires, 86 Series, 8mm, 300 Ohm, Red, 135 Degree Spark Plug Boots, 90 Degree Socket Style Distributor Boots, AMC / GM / Ford, V8, Set
Part Number: SUM-867805R
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
The Squarebody Chevy T-shirt is sure to be a fan favorite. Featuring the boxy, rugged looks of the classic...
Not Yet Reviewed
$22.99
—
$24.99
Coil Mounting Bracket, Steel, Fits LS Series, Pair
Part Number: SUM-440345
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Shock/Strut, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SUM-G7777
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Electrical Wire, 14-Gauge, 100 ft. Long, Yellow, Each
Part Number: SUM-874100Y
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Valve Spring Retainer Degree Gauges, Aluminum, Black Anodized, Each
Part Number: SUM-906787
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Shock/Strut, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SUM-G7748
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Exhaust Tip, Stainless, Polished, Straight/Rolled Edge, 3.00 in. Inlet, 3.50 in. Outlet, 12 in. Long, Each
Part Number: SUM-690045-1
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
41-52 Chevy Passenger , Fuel Tank Sending Unit, Direct-Fit , Fuel Level, Electrical, 0-30 ohms, Lever, 5/16 in. Fuel Line, Chevy, GM#1516280 , Each
Part Number: SUM-RP21687
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Timing Cover, 1-Piece, Steel, Black Powdercoated, Chevy, Big Block, Kit
Part Number: SUM-G3201B-K
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Radiator Support, Steel, Chrome, Chevy, Pontiac, Each
Part Number: SUM-G3922
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Exhaust Tip, Stainless, Polished, Straight/Rolled Edge, 2.50 in. Inlet, 3.50 in. Outlet, 18 in. Long, Each
Part Number: SUM-690046-1
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Hose, PTFE, Braided Stainless Steel, -4 AN, 10 ft. Length, Each
Part Number: SUM-220982
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster