Availability
Summit Racing Parts and Accessories
Camshaft, 1-Bolt, Hydraulic Flat Tappet, Advertised Duration 298/303, Lift .466/.488, Mopar, Big Block, Each
Part Number: SUM-6401
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pedal Car, Steel, Red, 35 in. Length, 17 in. Width, 20 in. Height, Each
Part Number: EET-9604
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Step Bars, Steel, Black Powdercoated, Round, 3 in. Diameter, Crew Cab, Dodge, Pair
Part Number: SUM-710151-B
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Paint, 2-Stage, Etching Primer, Flat, Gray, 1 Gallon, Each
Part Number: SUM-SWSP200G-12
Cannot be shipped Internationally
Cannot be shipped Internationally
Motor Mounts, Engine Swap, LS Conversion, Bolt In, Steel, Mustang, LS Swap, Kit
Part Number: SUM-7731119
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Cab Mount Kit, 1967-72 GM Truck, 3/4 1-Ton 2-Wheel Drive, 1/2,3/4,1-Ton 4-Wheel Drive, Includes Rubber Bushings With Hardware, Kit
Part Number: SUM-RP24632
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Speedometer, 1976-79 Chevy/GMC Truck, 1st Design, Fire Orange Needle, Each
Part Number: SUM-RP22652
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Piston Rings, Pro GPX Gas Ported, 4.500 in. Bore, File Fit, Gas Nitrided, 1/16 in., 1/16 in., 3/16 in. Thickness, V8, Set
Part Number: SUM-GP450016
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Tachometer Gauge, Direct-Fit, Replacement, 1979-87 Chevrolet, GMC, Truck/Blazer, GM#25054251 , Each
Part Number: SUM-RP22054
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pistons, Hypereutectic, Flat, 4.040 in. Bore, Ford, SBF, Set of 8
Part Number: SUM-17302C-40
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, Hydraulic Flat Tappet, Advertised Duration 282/292, Lift .486/.512, Ford, 351C, 351M, 400, Each
Part Number: SUM-5200
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Fuel Cell, Aluminum, Natural, 3 Gallons, Each
Part Number: SUM-293203
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Shelf, 3-D, Chevy Camaro SS, Resin, Tempered Glass Top, 19.850 in. x 8.100 in. x 6.100 in., Man Cave Ideas, Gifts For Men, Each
Part Number: SBL-7580-113
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Step Bars, Steel, Black Powdercoated, Oval, 4 in. Diameter, Crew Cab, Chevy, GMC, Pair
Part Number: SUM-710206-B
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Brake Booster, Power Brake, Vacuum Single Diaphragm, 9 in. Diameter, Steel, Black, Ford, Mercury, Each
Part Number: SUM-760230
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Coilover Shock, Double-adjustable, Aluminum, Clear Anodized, Eyelet Mounts, 17.000 in. Extended Length, Each
Part Number: SUM-G773502
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Brake Rotors, Cross-Drilled/Slotted, Iron, Zinc Dichromate Plated, Front, Cadillac, Chevy, GMC, Pair
Part Number: SUM-BRC-66009PR
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Fuel Pump, In-Tank, High-Flow, 90 psi, 320 lph, 11mm Inlet, 8mm Hose Barb Outlet, Gasoline, E85 Fuel Type, Each
Part Number: SUM-250114
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Heater Duct Kit, for SUM-991102-1 and SUM-991106 Heater, 10 ft. Length, 3.000 in. Diameter, Kit
Part Number: SUM-991103-1
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Paint, Single Stage, UV Stable, Acrylic Urethane, Gloss, Plum Pearl Metallic, 1 Gallon, Each
Part Number: SUM-UP319G
Cannot be shipped Internationally
Cannot be shipped Internationally
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Gears, 1-Piece/2-Piece Eccentric, Ford, 429/460, Set
Part Number: SUM-G6631R-B
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Door Bar Kits, Swing-Out, Release Pin, 1.75 in. Tube Diameter, Fits 0.134 in. Wall Tubing, Kit
Part Number: SUM-770993
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Brake Booster, Steel, Black, Single Diaphragm, 7 in. Diameter, Each
Part Number: SUM-760120-BLK
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Car Covers, Denier Polyester, Gray, Dragster, Each
Part Number: SUM-111385
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Gear, Ring and Pinion, 3.73:1 Ratio, GM, 8.2 in., 25 Spline Pinion, Set
Part Number: SUM-741021
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster