Availability
1965 Shocks and Struts
Shock, Twin Tube, QA1 Stocker Star NA, 14.400 in. Extended, 10.570 in. Collapsed, Each
Part Number: QA1-TN401
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock, Guardian, Gas, Each
Part Number: GAB-81270
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock Absorber / Strut, Excel-G, Twin-Tube, Gas Charged, Each
Part Number: KYB-344426
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock, OESpectrum, Dodge, Plymouth, A-Body, Rear, Pair
Part Number: MON-58496
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock/Strut, Adjustable Drag Shock, Rear, Ford, Mercury, RWD, Each
Part Number: CEE-2740
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock Absorber, RS9000XL, Triple Tube, Gas Charged, 9 Way Adjustable Valving, Includes Red Boot, Each
Part Number: RAN-RS999014
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock Absorber, RS5000X, Twin-Tube, Gas Charged, Includes Red Boot, Each
Part Number: RAN-RS55014
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock/Strut, Monotube, Adjustable, Front, Dodge, Plymouth, RWD, Each
Part Number: SUM-G7602
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock, Monroe Gas Magnum, Front, Front, Each
Part Number: MON-34900
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock/Strut, Nitro 8000, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SJA-N8023
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock, Classic, Chrysler, Dodge, Plymouth, Each
Part Number: GAB-82131
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock/Strut, Monotube, Adjustable, Rear, Chrysler, Dodge, Plymouth, RWD, Each
Part Number: SUM-G7703
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock/Strut, Load Carrier, Gas Charged, Rear, Pair
Part Number: GAB-43048
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock and Struts, Sport, 1.5 Street Performance Series, Monotube, Stock/Lowered, Gas-charged, Polyurethane Bushing, Buick, Chevy, Pontiac, Rear, Each
Part Number: HSS-71020009
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Shock/Strut, Load Carrier, Gas Charged, Front, Ford, Pair
Part Number: GAB-34058
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock/Strut, Monotube, Polyurethane Bushings, 27.070 in. Extended Length, 15.940 in. Collapsed Length, Each
Part Number: SJA-M9517
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock/Strut, Max Air, Twin-Tube, Rear, Pair
Part Number: MON-MA727
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock, Ultra, Front, Avanti, Buick, Cadillac, Chevy, Nissan, Oldsmobile, Pontiac, Toyota, Volvo, Each
Part Number: GAB-69600
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock, Stocker Star, Non-Adjustable, Aluminum, Front, Chevrolet, GMC, Each
Part Number: QA1-TN405
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Strut Assembly / Shock Absorber, Street Performance, Twin-Tube, Gas Charged, Each
Part Number: BEL-2208AA
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock/Strut, Adjustable, Front, Buick, Chevy, Oldsmobile, Pontiac, RWD, Each
Part Number: KON-80401087
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock, Max-Air, Chevy, Rear, Pair
Part Number: MON-MA785
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shocks/Struts, CF Series 90/10, Front, AMC, Ford, Mercury, Pair
Part Number: CLV-CF35093
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock Absorber / Strut, Excel-G, Twin-Tube, Gas Charged, Each
Part Number: KYB-343159
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Shock/Strut, Monotube, Polyurethane Bushings, 24.840 in. Extended Length, 14.820 in. Collapsed Length, Each
Part Number: SJA-M9558
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster