Availability
Showing In Stock Items. Show All 27 Items.
Shock Absorber / Strut, Excel-G, Twin-Tube, Gas Charged, Each
Part Number: KYB-343128
Estimated Ship Date: Today
Estimated Ship Date: Today
Shocks and Struts, N3 Performance, Loaded Strut, Stock Ride Height, Twin-tube, Gas Charged, Front, Chevy, GMC, Pair
Part Number: ROU-501167
Not Yet Reviewed
Estimated Ship Date: Jan 27, 2026 if ordered today
Estimated Ship Date: Jan 27, 2026 if ordered today
Shocks and Struts, N3 Performance, Loaded Strut, Stock Ride Height, Twin-tube, Gas Charged, Front, Ford, Pair
Part Number: ROU-501095
Not Yet Reviewed
Estimated Ship Date: Jan 27, 2026 if ordered today
Estimated Ship Date: Jan 27, 2026 if ordered today
Shocks and Struts, N3 Performance, Stock, Loaded Strut, Twin-tube, Gas Charged, Front, Ford, Pair
Part Number: ROU-501160
Estimated Ship Date: Jan 27, 2026 if ordered today
Estimated Ship Date: Jan 27, 2026 if ordered today
Shocks and Struts, N3 Performance, Leveling Strut, 2.0 in. Lifted Ride Height, Twin-tube, Gas Charged, Front, Ford, Pair
Part Number: ROU-501078
Estimated Ship Date: Jan 26, 2026 if ordered today
Estimated Ship Date: Jan 26, 2026 if ordered today
JSPEC- 25.20 x 15.20 x 2-3/8 - S50/EB2
Part Number: JKS-JSPEC9301
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Shocks and Struts, N3 Performance, Stock, Loaded Strut, Twin-tube, Gas Charged, Front, Chevy, GMC, Pair
Part Number: ROU-501168
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
JSPEC - 24.66 x 14.79 x 2-3/8 - S1/BP7
Part Number: JKS-JSPEC9321
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Shocks and Struts, N3 Performance, Loaded Strut, 6.0 in. Lifted Ride Height, Twin-tube, Gas Charged, Front, Chevy, GMC, Pair
Part Number: ROU-501067
Not Yet Reviewed
Estimated Ship Date: Jan 26, 2026 if ordered today
Estimated Ship Date: Jan 26, 2026 if ordered today
Shocks and Struts, N3 Performance, Loaded Strut, 5.0 in. Lifted Ride Height, Twin-tube, Gas Charged, Front, Chevy, GMC, Pair
Part Number: ROU-501034
Not Yet Reviewed
Estimated Ship Date: Jan 27, 2026 if ordered today
Estimated Ship Date: Jan 27, 2026 if ordered today
Shocks and Struts, N3 Performance, Loaded Strut, 7.0 in. Lifted Ride Height, Twin-tube, Gas Charged, Front, Chevy, GMC, Pair
Part Number: ROU-501035
Not Yet Reviewed
Estimated Ship Date: Jan 27, 2026 if ordered today
Estimated Ship Date: Jan 27, 2026 if ordered today
Shocks and Struts, N3 Performance, Loaded Strut, 4.0 in. Lifted Ride Height, Twin-tube, Gas Charged, Front, Ford, Pair
Part Number: ROU-501051
Not Yet Reviewed
Estimated Ship Date: Jan 27, 2026 if ordered today
Estimated Ship Date: Jan 27, 2026 if ordered today
Shocks and Struts, N3 Performance, Loaded Strut, 3.5 in. Lifted Ride Height, Twin-tube, Gas Charged, Front, Chevy, GMC, Pair
Part Number: ROU-501066
Not Yet Reviewed
Estimated Ship Date: Jan 27, 2026 if ordered today
Estimated Ship Date: Jan 27, 2026 if ordered today
Shocks and Struts, N3 Performance, Leveling, Loaded Strut, 2.0 in. Lifted Ride Height, Twin-tube, Gas Charged, Front, Chevy, GMC, Pair
Part Number: ROU-S0063
Not Yet Reviewed
Estimated Ship Date: Jan 26, 2026 if ordered today
Estimated Ship Date: Jan 26, 2026 if ordered today
Shocks and Struts, N3 Performance, Lift, Loaded Strut, 6.0 in. Lifted Ride Height, Twin-tube, Gas Charged, Front, Chevy, GMC, Pair
Part Number: ROU-501173
Not Yet Reviewed
Estimated Ship Date: Jan 26, 2026 if ordered today
Estimated Ship Date: Jan 26, 2026 if ordered today
Loaded Strut Pair Stock Chevy/GMC Sierra/Silverado 1500 (19-25)
Part Number: ROU-501195
Not Yet Reviewed
Estimated Ship Date: Jan 26, 2026 if ordered today
Estimated Ship Date: Jan 26, 2026 if ordered today
N3 Leveling Struts 2 Inch Loaded Strut Chevy/GMC Tahoe/Yukon XL 1500 (21-25)
Part Number: ROU-501065-B
Not Yet Reviewed
Estimated Ship Date: Jan 26, 2026 if ordered today
Estimated Ship Date: Jan 26, 2026 if ordered today
N3 Leveling Struts Diesel Chevy/GMC 1500 (20-25)
Part Number: ROU-501065-C
Not Yet Reviewed
Estimated Ship Date: Jan 26, 2026 if ordered today
Estimated Ship Date: Jan 26, 2026 if ordered today
Shocks and Struts, N3 Performance, Leveling, Loaded Strut, 2.0 in. Lifted Ride Height, Twin-tube, Gas Charged, Front, Chevy, GMC, Pair
Part Number: ROU-501171
Not Yet Reviewed
Estimated Ship Date: Jan 26, 2026 if ordered today
Estimated Ship Date: Jan 26, 2026 if ordered today
Shocks and Struts, N3 Performance, Lift, Loaded Strut, 4.0 in. Lifted Ride Height, Twin-tube, Gas Charged, Front, Chevy, GMC, Pair
Part Number: ROU-501172
Not Yet Reviewed
Estimated Ship Date: Jan 26, 2026 if ordered today
Estimated Ship Date: Jan 26, 2026 if ordered today
Shocks and Struts, N3 Performance, Loaded Strut, 6.0 in. Lifted Ride Height, Twin-tube, Gas Charged, Front, GMC, Pair
Part Number: ROU-501085
Not Yet Reviewed
Estimated Ship Date: Jan 27, 2026 if ordered today
Estimated Ship Date: Jan 27, 2026 if ordered today
Shocks and Struts, N3 Performance, Loaded Strut, 2.0 in. Lifted Ride Height, Twin-tube, Gas Charged, Front, Ford, Pair
Part Number: ROU-501141
Not Yet Reviewed
Estimated Ship Date: Jan 27, 2026 if ordered today
Estimated Ship Date: Jan 27, 2026 if ordered today
Shocks and Struts, N3 Performance, Loaded Strut, 5.0 in. Lifted Ride Height, Twin-tube, Gas Charged, Front, Chevy, GMC, Pair
Part Number: ROU-501031
Not Yet Reviewed
Estimated Ship Date: Jan 27, 2026 if ordered today
Estimated Ship Date: Jan 27, 2026 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.