Selected Filters


Loading...

Availability


1997 DODGE Main Cap Fasteners

Individual Parts

Results 1 - 8 of 8

Main Studs, 2-Bolt Main, 12-Point Nuts, Mopar, Small, Big Block, B, RB, LA, Kit

Part Number: ARP-140-5402

4.75 out of 5 stars ( 8 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Main Studs, 2-Bolt Main, Mopar, Small, Big Block, B, LA, RB, Kit

Part Number: ARP-140-5401

4.33 out of 5 stars ( 3 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Main Studs, 2-Bolt Main, Work with Windage Tray, Chrysler, Small Block, Kit

Part Number: ARP-240-5501

4.0 out of 5 stars ( 5 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Main Studs, Chromoly, Hex Head, 2-Bolt, Dodge, Cummins Diesel, 5.9L, 12V, Kit

Part Number: ARP-247-5402

Not Yet Reviewed

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Main Studs, 12-Point, Chromoly, Black Oxide, Dodge, Cummins Diesel, 12-Valve, 24-Valve, Kit

Part Number: SUM-910513

Not Yet Reviewed

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Main Cap Studs, 4140 Studs, Parallel Ground Washers, 12-Point Nuts, 2-Bolt Mains, 5.9L, 12V, L6, Cummins, Diesel, Dodge, Kit

Part Number: PQX-1000311

Not Yet Reviewed

Estimated Ship Date: Jun 12, 2026 if ordered today

...Loading

Estimated Ship Date: Jun 12, 2026 if ordered today

Main Studs, 2-Bolt Main, Cummins, 5.9L, Kit

Part Number: GFN-MSK5912

Not Yet Reviewed

Estimated Ship Date: Apr 24, 2026 if ordered today

...Loading

Estimated Ship Date: Apr 24, 2026 if ordered today

  • 1
  • Page 1 of 1