More Power in Every Purchase - Join the Summit Rewards Program Today!

More Power in Every Purchase - Join the Summit Rewards Program Today!

Stay Cool With SUMMER SALE Savings!

Drain Plug Kits

Individual Parts

Results 1 - 12 of 12

Drain Plug Assembly, 1/2-14 NPT, Steel, Weld-in Steel Bung, Kit

Part Number: STR-H1117D

4.65 out of 5 stars ( 17 )

Estimated Ship Date: Monday 8/4/2025

...Loading

Estimated Ship Date: Monday 8/4/2025

Drain Plug Kit, Steel Bung, Steel Plug, 1/2 in. NPT, Kit

Part Number: AAF-ALL50735

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 8/4/2025

...Loading

Estimated Ship Date: Monday 8/4/2025

Drain Plug Kit, Steel Bung, Steel Plug, 3/8 in. NPT, Kit

Part Number: AAF-ALL50733

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 8/4/2025

...Loading

Estimated Ship Date: Monday 8/4/2025

Drain Plug, 1/2 in.-20 Outside Threads, 1/8 in. NPT Plug, Kit

Part Number: BMM-80250

3.57 out of 5 stars ( 7 )

Estimated Ship Date: Monday 8/4/2025

...Loading

Estimated Ship Date: Monday 8/4/2025

Transmission Drain Plug, Steel, 1/2-20 in. Thread Size, Pipe Plug Port, 1/8 in. NPT Thread Size, Kit

Part Number: RNB-65128

3.62 out of 5 stars ( 13 )

Estimated Ship Date: Monday 8/4/2025

...Loading

Estimated Ship Date: Monday 8/4/2025

Drain Plug Kit, Aluminum Bung, Steel Plug, 3/8 in. NPT, Kit

Part Number: AAF-ALL50732

Not Yet Reviewed

Estimated Ship Date: Monday 8/4/2025

...Loading

Estimated Ship Date: Monday 8/4/2025

Oil Pan Drain Plug, Magnetic, 18mm x 1.5 RH Threads, Aluminum Washer, Each

Part Number: TGI-140033-1-KIT

3.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 8/4/2025

...Loading

Estimated Ship Date: Monday 8/4/2025

Drain Plug Kit, Pan Insert, Drain Plug, Sealing Washer, Kit

Part Number: TCI-805800

4.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 8/4/2025

...Loading

Estimated Ship Date: Monday 8/4/2025

Transmission Pan Drain Plug Kit, Bolt On Installation

Part Number: DER-13010

2.75 out of 5 stars ( 4 )

Estimated Ship Date: Monday 8/4/2025

...Loading

Estimated Ship Date: Monday 8/4/2025

Drain Plug Assembly, Short, 1/2 in. NPT, Steel, Kit

Part Number: MBT-1000-320

Not Yet Reviewed

Estimated Ship Date: Monday 8/4/2025

...Loading

Estimated Ship Date: Monday 8/4/2025

Drain Plug, Flush Mount, Steel, Pipe Plug Port, 1/2-14 NPT Thread, Kit

Part Number: MSR-7226

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Sep 3, 2025 if ordered today

...Loading

Estimated Ship Date: Sep 3, 2025 if ordered today

  • 1
  • Page 1 of 1

Modal Header

Call To Order

This is a custom order part. You can order this part by Contacting Us.