Selected Filters


Loading...

Availability


Crate Engines

Individual Parts

Results 1 - 25 of 54

Crate Engine, Long Block, Chevy Gen III LS, 24x Crank Reluctor, Aluminum Heads, Each

Part Number: SUM-150153

4.32 out of 5 stars ( 47 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engine, Assembly, Stage 1, Long Block, 1-Piece RMS, 4-Bolt Mains, Cast Iron w/Aluminum Heads, Hydraulic Roller, 10:1 CR, Chevy, Gen I 350, Each

Part Number: HPE-HP89

4.4 out of 5 stars ( 15 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engine, Base Long Block, Cast Iron Heads, Hydraulic Roller Camshaft, Chevy, 350, Each

Part Number: HPE-HP98

3.77 out of 5 stars ( 13 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engine, GM 350, Stage 1, Long Block, Internal/External Engine Balance, Cast Iron Heads, Chevy, 350, Each

Part Number: HPE-HP291P

3.69 out of 5 stars ( 16 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engine, Vortec, GM 350, 315 HP, Long Block, Internal Front/External Rear Engine Balance, Cast Iron Heads, Chevy, 350, Each

Part Number: HPE-HP74

3.78 out of 5 stars ( 9 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Engine Assembly, Stage 1 Crate Engine, Long Block, Ford, Small Block, 302, Each

Part Number: HPE-HP79

4.63 out of 5 stars ( 8 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Engine Assembly, Crate Engine, 2-Bolt Main, Long Block, for TBI or Carburetor, Chevy 350, Hydraulic Flat Tappet Cam, 1987-95, VIN Code K, Each

Part Number: VRE-350G8795

3.72 out of 5 stars ( 25 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engine, Marine, 350 C.I.D. 260 HP, Long Block, Assembled, Block Casting 880, Each

Part Number: HME-VMH4

3.43 out of 5 stars ( 7 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Engine Assembly, Stage 1 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each

Part Number: HPE-HP31

3.0 out of 5 stars ( 6 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Engine Assembly, Stage 1 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each

Part Number: HPE-HP32

5.0 out of 5 stars ( 7 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engine, Long Block, TBI Stroker, 1-Piece Rear Main Seal, Hydraulic Roller, 9.5:1 Compression Ratio, Cast Iron, Chevy, 383, Truck, Each

Part Number: HPE-HP05

1.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engine, GM 5.3L, LM7, 385 HP, Long Block, Internal Engine Balance, Aluminum Heads, Each

Part Number: HPE-HP97

4.93 out of 5 stars ( 15 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Engine Assembly, Stage 1 Crate Engine, Marine, Long Block, 1-Piece Main Seal, Chevy, Small Block, 383, Each

Part Number: HPE-HP90

5.0 out of 5 stars ( 5 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engine, Marine, Long Block, Assembled, External Balance, Cast Iron Heads, Chevy, 454, Each

Part Number: HME-DMK1

Not Yet Reviewed

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Engine Assembly, Stage 1 Crate Engine, Long Block, Ford, Small Block, 302, Each

Part Number: HPE-HP06

3.75 out of 5 stars ( 4 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engine, Marine, Long Block, Assembled, Internal Engine Balance, Cast Iron Heads, Chevy, 350, Each

Part Number: HME-DM02

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engine, Marine, Long Block, Assembled, Cast Iron Heads, Standard Rotation, Chevy, 5.7L, Each

Part Number: HME-VMM6

1.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engine, Marine, Long Block, Assembled, Cast Iron Heads, Chevy, 350, Each

Part Number: HME-DMH4

3.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

CRATE ENGINE, Mopar 360 Mag 350+HP

Part Number: HPE-HP113

Not Yet Reviewed

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engine, Marine, Long Block, Assembled, External Balance, Cast Iron Heads, Reverse Rotation, Ford, 351W, Each

Part Number: HME-DMA1R

1.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engine, Mopar 360 Small Block Stage 1, 320 hp, 410 lbs.-ft. Torque, Long Block, Hydraulic Roller, External Engine Balance, Magnum Heads, Each

Part Number: HPE-HP73

3.44 out of 5 stars ( 9 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engine, Marine, Long Block, Assembled, External Balance, Cast Iron Heads, Standard Rotation, Ford, 351W, Each

Part Number: HME-DMA1

4.67 out of 5 stars ( 3 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Crate Engines, Chrysler 5.7L Gen III Hemi 400 HP Long Block, 5.7L/345, Assembled, Aluminum Heads, without MDS, Chrysler, Dodge, Jeep, 5.7L, Each

Part Number: HPE-HP103T

3.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air

Engine Assembly, Stage 1 Crate Engine, Long Block, 1-Piece Main Seal, Ford, Small Block Windsor, 351, Each

Part Number: HPE-HP11

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 4/13/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 4/13/2026 if shipped by air