Availability
29 Results Found For "industries"
Showing In Stock Items. Show All 33 Items.
Coilover Spring, Powdercoated, 3.000 in. Inside Diameter, 14.000 in. Length, 150 lbs./in.Spring Rate, Each
Part Number: EIB-14003000150S
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Coilover Spring, Silver Powdercoated, 2.5 in. Inside Diameter, 14 in. Length, 150 lbs./in.Spring Rate, Each
Part Number: EIB-14002500150S
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Coilover Springs, 150 lbs./in. Rate, 2.500 in. I.D., 16.00 in. Length, Silver Powdercoated, Each
Part Number: EIB-16002500150S
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Coilover Spring, 150 lbs./in. Rate, 12 in. Length, 2.625 in. Diameter, Chrome Plated, Each
Part Number: AFC-22150CR
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Coilover Spring, 150 lbs./in. Rate, 14 in. Length, 2.625 in. Diameter, Chrome Plated, Each
Part Number: AFC-24150CR
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Coilover Spring, Silver Powdercoated, 3.0 in. Inside Diameter, 16 in. Length, 150 lbs./in.Spring Rate, Each
Part Number: EIB-16003000150S
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Coilover Spring, Silver Powdercoated, 2.50 in. Inside Diameter, 10 in. Length, 150 lbs./in.Spring Rate, Each
Part Number: EIB-10002500150S
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Coilover Spring, XT Barrel, Red Powdercoated, 2.500 in. Inside Diameter, 6.000 in. Length, 150 lbs./in.Spring Rate, Each
Part Number: EIB-060025300150
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Coilover Spring, Powdercoated, 2.500 in. Inside Diameter, 10.000 in. Length, 150 lbs./in.Spring Rate, Each
Part Number: EIB-1000-2500150
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Coilover Spring, Powdercoated, 2.500 in. Inside Diameter, 14.000 in. Length, 150 lbs./in.Spring Rate, Each
Part Number: EIB-14002500150
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Coilover Spring, Silver Powdercoated, 3.000 in. Inside Diameter, 18.000 in. Length, 150 lbs./in.Spring Rate, Each
Part Number: EIB-18003000150S
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
EIBACH SILVER OFFROAD COILOVER SPRING
Part Number: EIB-14003750150S
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Coilover Spring, Powdercoated, 2.500 in. Inside Diameter, 12.000 in. Length, 150 lbs./in.Spring Rate, Each
Part Number: EIB-12002500150
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Coilover Spring, Silver Powdercoated, 2.50 in. Inside Diameter, 12 in. Length, 150 lbs./in.Spring Rate, Each
Part Number: EIB-12002500150S
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Coilover Spring, Powdercoated, 3.000 in. Inside Diameter, 12.000 in. Length, 150 lbs./in.Spring Rate, Each
Part Number: EIB-12003000150S
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Coilover Spring, Red Powdercoated, 5.000 in. Outside Diameter, 20.000 in. Length, 150 lbs./in.Spring Rate, Each
Part Number: EIB-20005000150
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Coilover Spring, 150 lbs./in. Rate, 8 in. Length, 2.625 in. Diameter, Chrome Plated, Each
Part Number: AFC-28150-1CR
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
EIBACH SILVER OFFROAD COILOVER SPRING 2.50" / 3.00" / 3.75" I.D.
Part Number: EIB-08003000150S
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Coilover Spring, 150 lbs./in. Rate, 13 in. Length, 5.000 in. Diameter, Black Powdercoated, Each
Part Number: AFC-25150-1B
Not Yet Reviewed
Estimated Ship Date: May 22, 2026 if ordered today
Estimated Ship Date: May 22, 2026 if ordered today
EIBACH SILVER OFFROAD COILOVER SPRING
Part Number: EIB-10003750150S
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Coilover Spring, 2.50-3.00 in. Inside Diameter, 16.000 in. Length, 150 lbs./in. Rate, Red Powdercoated, Each
Part Number: EIB-160025300150
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Coilover Spring, 150 lbs./in. Rate, 11 in. Length, 5.000 in. Diameter, Black Powdercoated, Each
Part Number: AFC-25150B
Not Yet Reviewed
Estimated Ship Date: May 22, 2026 if ordered today
Estimated Ship Date: May 22, 2026 if ordered today
Coilover Spring, 150 lbs./in. Rate, 3.0 in. I.D., 6.0 in. Length, Silver Powdercoated, Each
Part Number: EIB-06003000150S
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Coilover Spring, Red Powdercoated, 2.25 in. Inside Diameter, 6.0 in. Length, 150 lbs./in.Spring Rate, Each
Part Number: EIB-6002250150
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Coilover Spring, 150 lbs./in. Rate, 8 in. Length, 1.875 in. Diameter, Black Powdercoated, Each
Part Number: AFC-29150-2B
Not Yet Reviewed
Estimated Ship Date: May 22, 2026 if ordered today
Estimated Ship Date: May 22, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster