Availability
2017 Camshafts
Camshaft, Hydraulic Roller Tappet, Advertised Duration 266/279, Lift .612/.605, Dodge, Hemi, 5.7/6.4L, Each
Part Number: CCA-201-424-17
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Summit Racing™ Stage 4 Pro LS Single Plane Cam, 240/252 106 +0, .569 Lift, LS1 LS2 LS6 LS3 LS7 LQ4, Each
Part Number: SUM-8703
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Advertised Duration 285/301, Lift .621/.624, Chevy, Chevy, Small Block, LS
Part Number: CCA-54-470-11
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, Stock Replacement, Hydraulic Roller Tappet, Exhaust Right Hand, Dodge, Chrysler, Jeep, Ram, Each
Part Number: MEL-MC1422
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Advertised Duration 263/277, Lift .556/.568, Chevy, 4.8, 5.3, 6.0L, Each
Part Number: CCA-189-400-13
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshafts, Stock Replacement, Hydraulic Roller Tappet, Non MDS, Dodge, Ram, Each
Part Number: MEL-MC1403
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, LS Truck Hoss Stroker, 219 int. Duration, 0.620 in./0.636 in. Lift, 112 LSA, 3-Bolt. Chevy, Gen III/IV LS, Each
Part Number: BTC-LSTRUCKHOSS
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro Hemi 224 Long-runner Cam, MDS Delete, Phaser Limited or Delete, 224/228 Duration @.050, 115 LSA + 1 adv, .600/.585 Lift, 3100-6,600 Range, Each
Part Number: SUM-5714
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, V2, Stage 4, Hydraulic Roller, 233/24X Duration at 0.050 in., 0.636 in. Lift, 111 LSA, 3-Bolt, Chevy, LS, Each
Part Number: BTC-BTRLS1STAGE4
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Advertised Duration 283/291, Lift .602/.605, Chevy, LS, Each
Part Number: CCA-SUMLSGT104
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Stage 5 Pro LS Twin-Turbo Cam. 247/251 Dur., 117.5+5.5, .625/.615 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LQ4 LQ9, Each
Part Number: SUM-8725R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, HRT Supercharger Stage 2, Hydraulic Roller, Dodge, V8, Each
Part Number: CCA-201-337-17
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
BTR GEN V STAGE 1 SUPERCHARGED CAMSHAFT
Part Number: BTC-S0411
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, BTR, L83 Stage 1, 203 int., 210 exh Duration, 0.540 in./0.540 in. Lift, 112 Lobe Sep, 1-Bolt, 5.3L, 6.2L, Gen V LS, 14% Fuel Lobe, Each
Part Number: BTC-2240310125R0
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft
Part Number: BTC-BTR-HOTROD
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshafts, Stock Replacement, Hydraulic Roller Tappet, Chrysler, Dodge, Jeep, Each
Part Number: MEL-MC1402
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
5.7 Pro Hemi Truck 3 Hydraulic Roller Cam, 218/224 Duration @.050, 112.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 2200-6400 Range, Each
Part Number: SUM-5723
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
5.7 Pro Hemi Truck 1 Hydraulic Roller Cam, 206/212 Duration @.050, 110.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 1600-6000 Range, Each
Part Number: SUM-5721
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Stage 4.5 Pro LS Twin-Turbo Cam. 242/248 Dur., 116+5, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Each
Part Number: SUM-8724R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS S.P.6 Cam, 256/270 Duration, 108 LSA + 4 Adv, .625/.625 lift, 3-Bolt, compatible with SUM-174005 springs. Gen. 3/4 5.3 5.7 6.0 6.2 7.0
Part Number: SUM-8745R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS S.P.3 Cam, 238/255 Duration, 110 LSA + 5 Adv,.625/.605 lift, 3-Bolt, compatible with SUM-174005 springs. Gen. 3/4 5.3 5.7 6.0 6.2 7.0
Part Number: SUM-8742R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
BTR LS 400+ MEDIUM TURBO CAMSHAFT
Part Number: BTC-BTR-LSMT400
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Junkyard Dog LS CP Cath Port Camshaft, 5150, Hyd roll, 3 bolt, 232/244 dur @.050", .621"/.604" lift, 111 deg LSA
Part Number: CXM-03-01-0076
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
CAMSHAFT
Part Number: MEL-MC1438
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
BTR LS1 STAGE 1 CAMSHAFT V2
Part Number: BTC-BTRLS1STAGE1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster