Availability
STUDEBAKER COMMANDER Parts and Accessories
Fuel Injection System, Sniper 2 from Sniper 1 Upgrade, Throttle body, Polished, 4150 Flange, 650 hp Max, 800 CFM, No Pump, 3.5 in. Display, Kit
Part Number: SNE-550-510-3AX
Estimated Ship Date: Today
Estimated Ship Date: Today
Carburetor, Alcohol, 4150, 850 cfm, 4-Barrel, Down-Leg, Billet Metering Blocks, Dual Inlet, Each
Part Number: QFT-Q-850-A
Estimated Ship Date: Today
Estimated Ship Date: Today
Carburetor, Gasoline, 4150, 750 cfm, 4-Barrel, Down-Leg, For Dual Carbureted Blower Engines, Each
Part Number: QFT-Q-750-B2
Estimated Ship Date: Today
Estimated Ship Date: Today
Fuel Injection System, Sniper 2 from Sniper 1 Upgrade, Throttle body, Polished, 4150 Flange, 650 hp Max, 800 CFM, Regulator, 5 in. Display, Kit
Part Number: SNE-550-510-5AE
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Carburetor, Gasoline, 4150, 650 cfm, 4-Barrel, Down-Leg, For Dual Carbureted Blower Engines, Each
Part Number: QFT-Q-650-B2
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Fuel Injection System, Sniper 2 from Sniper 1 Upgrade, Throttle body, Polished, 4150 Flange, 650 hp Max, 800 CFM, Regulator, Bluetooth, Kit
Part Number: SNE-550-510-BAE
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Carburetor, E-85, Q-Series, 750 cfm, 4-Barrel, Mechanical, Down-Leg, Each
Part Number: QFT-Q-750-E85
Need It Sooner? We recommend these similar substitute parts:
Fuel Injection System, Sniper 2 from Sniper 1 Upgrade, Throttle body, Black, 4150 Flange, 650 hp Max, 800 CFM, No Pump, 5 in. Display, Kit
Part Number: SNE-550-511-5AX
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Carburetor, Gasoline, 4150, 950 cfm, 4-Barrel, Down-Leg, For Dual Carbureted Blower Engines, Each
Part Number: QFT-Q-950-B2
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Fuel Injection System, Sniper 2 from Sniper 1 Upgrade, Throttle body, Polished, 4150 Flange, 650 hp Max, 800 CFM, No Pump, 5 in. Display, Kit
Part Number: SNE-550-510-5AX
Not Yet Reviewed
Estimated Ship Date: May 18, 2026 if ordered today
Estimated Ship Date: May 18, 2026 if ordered today
Battery, Red Top, 6 V, Starting, 800 Cold Cranking Amps, Top Post, BCI Group 6V, Hold Down and Cable Included, Kit
Part Number: CMB-06-0121
Not Yet Reviewed
Need It Sooner? We recommend these similar substitute parts:
800 CCA Optima RedTop 6-Volt Battery 9010-044 BCI Group 6V
Cannot be shipped Internationally
Cam and Lifters, Mechanical Roller Tappet, Advertised Duration 268/268, Lift .525/.525, Chevy Small Block, Kit
Part Number: CCA-CL12-700-8
Not Yet Reviewed
Estimated Ship Date: Jun 15, 2026 if ordered today
Estimated Ship Date: Jun 15, 2026 if ordered today
Seat Frame and Foam, Split Bench, Individual Center Fold Down Arm, 1935-48, Each
Part Number: WGY-S104
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Cam/Lifters/Timing, Hydraulic Roller Tappet, Adv. Duration 280/288, Lift .576/.570, Chevy, Small Block, Kit
Part Number: CCA-SK12-467-8
Estimated Ship Date: Jun 15, 2026 if ordered today
Estimated Ship Date: Jun 15, 2026 if ordered today
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 276/288, Lift .502/.520, Chevy, Small Block, Kit
Part Number: CCA-CL12-415-8
Not Yet Reviewed
Estimated Ship Date: Jun 15, 2026 if ordered today
Estimated Ship Date: Jun 15, 2026 if ordered today
Camshaft Kits, Xtreme Energy Cam and Lifter Kits, Solid Roller, Retro-fit, Advertised Duration 286/292, Lift 0.576/0.582, Chevy, GMC, Small Block, Kit
Part Number: CCA-SK12-772-8
Not Yet Reviewed
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Camshaft Kits, Xtreme Energy Cam and Lifter Kits, Solid Roller, Retro-fit, Advertised Duration 280/286, Lift 0.570/0.576, Chevy, GMC, Small Block, Kit
Part Number: CCA-SK12-771-8
Not Yet Reviewed
Estimated Ship Date: Jun 10, 2026 if ordered today
Estimated Ship Date: Jun 10, 2026 if ordered today
Camshaft Kits, Xtreme Energy Cam and Lifter Kits, Solid Roller, Retro-fit, Advertised Duration 292/297, Lift 0.582/0.588, Chevy, GMC, Small Block, Kit
Part Number: CCA-SK12-773-8
Not Yet Reviewed
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Cam/Lifter, Valvetrain, Hydraulic Roller Tappet, Advertised Duration 260/264, Lift .474/.474, Chevy, 5.0/5.7L
Part Number: CCA-K12-411-8
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 268/276, Lift .570/.565, Chevy, Small Block, Kit
Part Number: CCA-CL12-466-8
Not Yet Reviewed
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Camshaft Kits, Xtreme Energy Cam and Lifter Kits, Hydraulic Roller, Retro-fit, Advertised Duration 294/300, Lift 0.540/0.562, Chevy, Small Block, Kit
Part Number: CCA-SK12-443-8
Not Yet Reviewed
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Camshaft Kits, Xtreme Fuel Injection Retrofit, Hydraulic Roller, Advertised Duration 292/300, Lift 0.584/0.579, Lifters, Chevy, GMC, Small Block, Kit
Part Number: CCA-SK12-468-8
Not Yet Reviewed
Estimated Ship Date: Jun 1, 2026 if ordered today
Estimated Ship Date: Jun 1, 2026 if ordered today
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 270/276, Lift 0.495/.503, Chevy, Small Block, Kit
Part Number: CCA-CL12-417-8
Not Yet Reviewed
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Cam, Lifters, Timing, Hydraulic Roller Tappet, Advertised Duration 270/276, Lift .495/.503, Chevy, Small Block
Part Number: CCA-SK12-417-8
Not Yet Reviewed
Estimated Ship Date: Jun 8, 2026 if ordered today
Estimated Ship Date: Jun 8, 2026 if ordered today
Camshaft Kits, Magnum Solid Roller Cam and Lifter Kits, Retro-fit, Advertised Duration 300/300, Lift 0.575/0.575, Chevy, GMC, ISO, Small Block, Kit
Part Number: CCA-SK12-705-8
Not Yet Reviewed
Estimated Ship Date: Jun 1, 2026 if ordered today
Estimated Ship Date: Jun 1, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster