Availability
Camshaft Phasers, Chrysler, Dodge, Jeep, Ram, Each
Part Number: RNB-918-880
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Engine Timing Set, Stock Replacement Timing Kit
Part Number: MEL-3-1038S
Estimated Ship Date: Oct 17, 2025 if ordered today
Estimated Ship Date: Oct 17, 2025 if ordered today
Camshaft Kits, HRT Stage 2, Hydraulic Roller, Advertised Duration 273/279, Lift 0.596/0.582, Valve Springs, Chrysler, Dodge, Jeep, Ram, 5.7L, 6.4L,Kit
Part Number: CCA-CK201-303-17
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Lifters, Evolution Series Hydraulic Roller Lifters, 0.842 in. O.D., 3.150 in. Lifter Seat Height, Chrysler, Dodge, Jeep, Ram, Mopar Hemi, Set of 16
Part Number: CCA-85601-16
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Stock Replacement Engine Valve Lifter Guide
Part Number: MEL-MLG103
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
5.7 Pro Hemi Truck 3 Hydraulic Roller Cam, 218/224 Duration @.050, 112.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 2200-6400 Range, Each
Part Number: SUM-5723
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
KIT TIMING CHAIN, DAYCO
Part Number: DAC-KTC1372
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Valve Spring, Stock Replacement. Mopar Gen III Hemi, With Shim, Each
Part Number: MEL-VS-1642
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Timing Cover Bolts, 12-point Head, Stainless Steel, Polished, Includes Water Pump Fasteners, Chrysler, Dodge, Ram, Kit
Part Number: ARP-440-1501
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Camshaft, Stock Replacement, Hydraulic Roller Tappet, Exhaust Left Hand, Dodge, Chrysler, Jeep, Ram, Each
Part Number: MEL-MC1444
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Camshaft, Stock Replacement, Hydraulic Roller Tappet, Exhaust Right Hand, Dodge, Chrysler, Jeep, Ram, Each
Part Number: MEL-MC1445
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Camshaft Kits, HRT Stage 3, Hydraulic Roller, Advertised Duration 281/284, Lift 0.632/0.609, Valve Springs, Chrysler, Dodge, Jeep, Ram, 6.4L, Kit
Part Number: CCA-CK201-306-17
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Timing Chain Kit, Single Roller, Steel, Dodge, Jeep, Mitsubishi, Ram, 3.7L, Kit
Part Number: CWA-5019423AD
Not Yet Reviewed
Estimated Ship Date: Dec 15, 2025 if ordered today
Estimated Ship Date: Dec 15, 2025 if ordered today
Pro Hemi Stage 6 Hydraulic Roller Cam, 232/248 Duration @.050, 120 LSA + 4 adv, .625/.625 Lift, 3500-7500 Range, Each
Part Number: SUM-5719
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Pushrod, Assembled, Steel, 5/16 in. Diameter, Ball Tips, 6.936 in. Length, Must Be Used with 292326-16 Lifters, Chrysler, Dodge, Jeep, Ram, Each
Part Number: MEL-MPR-667-A
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
6.4 Pro Hemi Truck 2 Hydraulic Roller Cam, 212/218 Duration @.050, 111.5 LSA + 3.5 adv, .585/.540 Lift No Springs Required, 1800-6200 Range, Each
Part Number: SUM-5726
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
BTR 6.4 GEN III HEMI 224 VVT CAMSHAFT
Part Number: BTC-S0462
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
CAMSHAFT
Part Number: MEL-23107
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Rocker Arm Studs, M8 x 1.25 Thread, 1.787 in. Effective Stud Length, Mopar, GEN III Hemi, Kit
Part Number: CCA-4589-KIT
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Timing Chains, Replacement, Single Non-roller, Steel, Guides, Tensioners, Dodge, Jeep, Mitsubishi, Ram, 3.7L, Kit
Part Number: CLO-9-0393SC
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Valve Lock, 7 degree, Steel, 3-groove, 0.312 in. Stem Diameter, Chrysler, Dodge, Jeep, Each
Part Number: CWA-53010515AA
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Lifters, Valve, Hydraulic Roller, 0.842 in. O.D., non-MDS, Cold Forged Steel, Heat Treated, Chrysler, Dodge, Jeep, Ram, Hemi Gen III, Set of 16
Part Number: MEL-292326-16
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Pro Hemi Stage 3 Hydraulic Roller Cam, 218/224 Duration @.050, 114.5 LSA + 1.5 adv, .600/.585 Lift, 2900-6900 Range, Each
Part Number: SUM-5713
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Pro Hemi Big Gun 4 Hydraulic Roller Cam, 251/257 Duration @.050, 116.5 LSA + 5 adv, .625/.625 Lift, Valve Reliefs Required, 3800-7800 Range, Each
Part Number: SUM-5744
Not Yet Reviewed
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.