Availability
PLYMOUTH DUSTER Transmission & Drivetrain
Clutch Master Cylinder, Hydramax, Cast Aluminum, Black, Dodge, Plymouth, Kit
Part Number: AWR-HMCH-30001G
Not Yet Reviewed
Estimated Ship Date: May 26, 2026 if ordered today
Estimated Ship Date: May 26, 2026 if ordered today
STREET TWN STL MOPAR SB & BB 6 BLT CRK 1-1/8X26 SPL 130
Part Number: MCL-6440607
Not Yet Reviewed
Estimated Ship Date: Apr 28, 2026 if ordered today
Estimated Ship Date: Apr 28, 2026 if ordered today
Solid Street Twin Clutch Kit 1965-1978 Dodge and 1963-1978 Plymouth 6 Bolt, 1-1/8" x 26 Spline
Part Number: CTF-412613000
Not Yet Reviewed
Estimated Ship Date: Apr 15, 2026 if ordered today
Estimated Ship Date: Apr 15, 2026 if ordered today
Differential Cover, 10-bolt, Steel, Chrome, Dana 60, Dana 61, Standard Rotation, Each
Part Number: YGA-32005
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Flexplate, 6-Bolt, Mopar, V8, Each
Part Number: PIO-FRA-309
Estimated Ship Date: Apr 14, 2026 if ordered today
Estimated Ship Date: Apr 14, 2026 if ordered today
Axle Shaft Retaining Hardware Kit, 1964-74 Mopar, 8 3/4" Differential and Dana 60, OE Style Fasteners, 10 Piece Kit
Part Number: SUM-RP80423
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Spacer, Replacement for No-Slip, Each
Part Number: PWT-624014SEH2
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Clutch Kit, Organic, 1 in. Diameter Shaft, 23-Spline, 10.5 in. Diameter Disc, Chrysler, Dodge, Plymouth, Kit
Part Number: RAM-88766
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Ring Gear Bolt, Hex Head, 3/8-24 in. LH Thread Size, Steel, Natural, Each
Part Number: YGA-33035
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Torque Converters, Twister Full Race, 3,600-4,200 rpm Stall Speed Range, 24-spline, 10.00 in. Diameter, A727/A727 (36RH), Chrysler, Dodge, Jeep, Each
Part Number: HAY-97-3A36F
Not Yet Reviewed
Estimated Ship Date: Apr 17, 2026 if ordered today
Estimated Ship Date: Apr 17, 2026 if ordered today
Crush Sleeve, Steel, 0.495 in. Tall, Each
Part Number: YGA-33093
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Transmission Bushing, Actual OD - 1.6245; Length - 0.525; Max Wall - 0.0592
Part Number: DUR-01998TG
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Gear, Ring and Pinion, 4.10:1 Ratio, Dana 60, Set
Part Number: RNB-697-315
Not Yet Reviewed
Estimated Ship Date: Apr 15, 2026 if ordered today
Estimated Ship Date: Apr 15, 2026 if ordered today
MASTER KIT
Part Number: PIO-752061
Not Yet Reviewed
Estimated Ship Date: Apr 14, 2026 if ordered today
Estimated Ship Date: Apr 14, 2026 if ordered today
Clutch Kit, RXT, 1 in. x 23-Spline, 9.688 in. Diameter Disc, Chrysler, 340, 383, Kit
Part Number: MCL-6921-02
Not Yet Reviewed
Estimated Ship Date: Apr 28, 2026 if ordered today
Estimated Ship Date: Apr 28, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
RAM Concept 10.5 Dual-Disc Metallic Clutch Kits 50-2350N
Not Yet Reviewed
Estimated Ship Date: Apr 13, 2026
Differential Carrier Bearings, Tapered Roller, Race, Steel, Each
Part Number: SKF-BR35
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Differential Carrier Gear Kit
Part Number: RMG-XL-4000
Not Yet Reviewed
Estimated Ship Date: Apr 15, 2026 if ordered today
Estimated Ship Date: Apr 15, 2026 if ordered today
Torque Converters, Twister Full Race, 2,800-3,200 rpm Stall Speed Range, 24-spline, 10.00 in. Diameter, A727/A727 (36RH), Chrysler, Dodge, Jeep, Each
Part Number: HAY-97-3A28F
Not Yet Reviewed
Estimated Ship Date: Apr 17, 2026 if ordered today
Estimated Ship Date: Apr 17, 2026 if ordered today
Differential, Eaton Detroit Locker, 30-Spline, Chrysler, 8.75 in., Each
Part Number: ETN-187SL14A
Not Yet Reviewed
Estimated Ship Date: Apr 20, 2026 if ordered today
Estimated Ship Date: Apr 20, 2026 if ordered today
Fittings, Zip Locker Bulkhead Fittings, Kit
Part Number: YGA-34000
Not Yet Reviewed
Estimated Ship Date: Apr 27, 2026 if ordered today
Estimated Ship Date: Apr 27, 2026 if ordered today
Differential, Grip Pro Traction System, 29-Spline, Chrysler 8.25 in., Each
Part Number: PWT-GT308229
Not Yet Reviewed
Estimated Ship Date: May 14, 2026 if ordered today
Estimated Ship Date: May 14, 2026 if ordered today
Ring & Pinion Gear Set DANA 60 / 5.13 Ratio
Part Number: SVL-2020606
Not Yet Reviewed
Estimated Ship Date: Apr 10, 2026 if ordered today
Estimated Ship Date: Apr 10, 2026 if ordered today
Tapered Roller Bearing, 0.75 in. I.D., 1.781 in. O.D., Each
Part Number: FWB-103117
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Tapered roller bearing set (bearing and race)
Part Number: SKF-BR2
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
MOPAR, TORQUE CONVERTER, TF6, 904, NON LOCK UP 2800-3000 STALL
Part Number: FTI-SRC30826
Estimated Ship Date: Apr 27, 2026 if ordered today
Estimated Ship Date: Apr 27, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster