Availability
Showing In Stock Items. Show All Items.
Oil Pump, High-Volume, Ford, 221/255/260/289/302, Each
Part Number: MEL-M68HV
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
BUILD IT WITH SUMMIT!
Harmonic Balancer, OEM, Internal, External Balance, Nodular Iron, Natural, Ford, 5.0L, Set
Part Number: SUM-163302
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Piston Rings, Moly, 4.030 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251K30
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Piston Rings, Moly, 4.000 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251K
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Oil Filter, Canister, 3/4-16 in. Thread, 5.205 in. High, Each
Part Number: MOF-FL1A
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Oil Pump, Standard-Volume, Ford, 221/255/260/289/302, Each
Part Number: MEL-M68
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Lifter, Hydraulic Flat Tappet, Ford, Lincoln, Mercury, Each
Part Number: MEL-JB-900
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
U-Joint, Light Duty, Spicer 1310 Style, Steel, 4 Plain Bearing Cap Style, Each
Part Number: SDH-5-1310X
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Main Bearings, P Series, 1/2 Groove, Standard Size, Tri Metal, Ford, Small Block, Set of 5
Part Number: CLE-MS590P
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Spark Plug, Conventional Resistor, Nickel Alloy Tip, Tapered Seat, 14mm Thread, Each
Part Number: ADO-R45TS
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Timing Chain and Gear Set, Street True Roller, Double Roller, Iron/Steel Sprockets, Ford, Small Block, Works with 2-Piece Fuel Pump Eccentric, Set
Part Number: CLO-9-1138
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Heater Hose, Standard, 5/8 in., Synthetic EPDM, Black, 50 ft. Long, Each
Part Number: DAC-80271
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Head Gasket, Heavy Duty Perma Torque, 4.100 in. Bore, 0.047 in. Compressed Thickness, Ford, Smal Block, Each
Part Number: FEL-9333PT1
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Piston Rings, Moly, 4.040 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251K40
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Gaskets, Timing Cover, Cork/Rubber, Ford, Small Block, Kit
Part Number: FEL-TCS45449
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Spark Plug, E3, Tapered Seat, 14mm Thread, 0.460 in. Reach, Projected Tip, Resistor, Each
Part Number: ETP-E3-42
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Piston Rings, Plasma-moly, 4.030 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: HSN-2M139030
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Spark Plug, Copper Core, Tapered Seat, 14mm Thread, .460 in. Reach, Partial Projected, Resistor, Each
Part Number: ATL-25
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Piston Rings, Cast Iron, 4.000 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251X
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Lifter, Hydraulic Roller, Ford, Lincoln, Mercury, Each
Part Number: MEL-JB-2205
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Wheel Lug Nut, Steel, Chrome, 1/2 in.-20 RH, Conical Seat, 3/4 in. Wrench Size, Set of 10
Part Number: RNB-611-154
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Rack and Pinion, Hydraulic Power Assist, Aluminum, Ford, Mercury, Ford, Mercury, Lincoln, Each
Part Number: AAZ-97-203F
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Connecting Rod Bearing, Tri-Metal, Ford, V8, Standard Size, Pair
Part Number: SLP-2600CP
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Oil Filter, HP Series, 3/4-16 in. Thread, 5.75 in. High, Each
Part Number: FRM-HP1
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Heater Hose, 3/4 in. I.D., Synthetic EPDM, Black, 50 ft. Long, Each
Part Number: DAC-80273
Estimated Ship Date: Monday 9/22/2025
Estimated Ship Date: Monday 9/22/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.