Availability
5.7 Pro Hemi Truck 1 Hydraulic Roller Cam, 206/212 Duration @.050, 110.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 1600-6000 Range, Each
Part Number: SUM-5721
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
BUILD IT WITH SUMMIT!
6.4 Pro Hemi Truck 1 Hydraulic Roller Cam, 206/212 Duration @.050, 110.5 LSA + 3.5 adv, .585/.540 Lift No Springs Required, 1600-6000 Range, Each
Part Number: SUM-5725
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
5.7 Pro Hemi Truck 2 Hydraulic Roller Cam, 212/218 Duration @.050, 111.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 1800-6200 Range, Each
Part Number: SUM-5722
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Alternator Brackets, Gen III Hemi, Alternator Relocation, Steel, Black, Cylinder Head Mount, Hardware included, Chrsyler, Dodge, Jeep, 5.7-6.4L, Each
Part Number: HLY-97-347
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
6.4 Pro Hemi Truck 3 Hydraulic Roller Cam, 218/224 Duration @.050, 112.5 LSA + 3.5 adv, .585/.540 Lift No Springs Required, 2200-6400 Range, Each
Part Number: SUM-5727
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Valve Covers, Perimeter Bolt Mounting, Steel, Black, AMC, Jeep, L6, Each
Part Number: MRG-9831BMRG
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Valve Covers, Steel, Black, Plain, AMC, Pair
Part Number: MRG-9830BMRG
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
5.7 Pro Hemi Truck 3 Hydraulic Roller Cam, 218/224 Duration @.050, 112.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 2200-6400 Range, Each
Part Number: SUM-5723
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Power Steering Brackets, Hemi Swap Adapter Plate, Aluminum, Black, Saginaw TC Pump, Cylinder Head Mount, Left Side, Hardware, Gen III, 5.7-6.4L, Each
Part Number: HLY-97-380
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
6.4 Pro Hemi Truck 2 Hydraulic Roller Cam, 212/218 Duration @.050, 111.5 LSA + 3.5 adv, .585/.540 Lift No Springs Required, 1800-6200 Range, Each
Part Number: SUM-5726
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Valve Covers, Steel, Chrome, Plain, AMC, Pair
Part Number: MRG-9830CMRG
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Crate Engine, Remanufactured, Long Block, Assembled, Jeep, Dodge, 2.5L, Each
Part Number: VRE-DA36
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Power Steering Pulleys, Replacement, Aluminum, Black, Serpentine, 6-rib, Overdrive, Press Fit, GM Type 2 Pump, Chrysler, Dodge, Jeep, 5.7-6.4L, Each
Part Number: HLY-97-383
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Bolts, Valve Cover, Black, M6 x 1.0 Thread, Allen Head, 1.100 in. U.H.L., Set of 20
Part Number: MRG-68502BG
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Adapter, Oil Filter, Block-Off Plate, Aluminum, Black, Chrysler, Dodge, Jeep, Each
Part Number: EAR-HEMI0002ERL
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Timing Covers, Replacement, Cast Aluminum, Black Finish, for Mid-Mount Accessory Drive 20-290BK, 20-292BK, Gen III, Hemi, Non-VVT, 5.7L, 6.1L, Each
Part Number: HLY-97-373
Not Yet Reviewed
Estimated Ship Date: Oct 1, 2025 if ordered today
Estimated Ship Date: Oct 1, 2025 if ordered today
Cyl Head, CHRY 4.7/287 04-07 LFT HD
Part Number: VRE-2DF7
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Assembled, Mopar, 4.7L, Each
Part Number: VRE-DDF7
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Assembled, Jeep, 4.0L/242, Each
Part Number: VRE-DA31
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Timing Chain and Gear Set, OE Replacement, Dodge, Jeep, Set
Part Number: SUM-TS76083S
Not Yet Reviewed
Estimated Ship Date: Nov 7, 2025 if ordered today
Estimated Ship Date: Nov 7, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Timing Chain and Gear Set, OE Replacement, Dodge, Jeep, Next Generation Engines, Set
Part Number: SUM-TS76110
Estimated Ship Date: Nov 7, 2025 if ordered today
Estimated Ship Date: Nov 7, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Timing Set, Single Roller, Steel Gears, Dodge, 5.7, 6.1L, Kit
Part Number: SUM-TS76140
Not Yet Reviewed
Estimated Ship Date: Nov 7, 2025 if ordered today
Estimated Ship Date: Nov 7, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Timing Chain and Gear Set, OE Replacement, Dodge, Jeep, Magnum Engines, Set
Part Number: SUM-TS76144
Not Yet Reviewed
Estimated Ship Date: Nov 7, 2025 if ordered today
Estimated Ship Date: Nov 7, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.