Availability
Engine Gasket Sets, Full, AMC, 4.8L, 5.0L, Kit
Part Number: FEL-260-1010
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Flywheel, 164-tooth, Steel, Jeep, 4.0L, Each
Part Number: LUK-LFW193
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Crossmember, Rear, Bolt-on, Steel, Black, Jeep, Each
Part Number: CWA-J8127711
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Shock/Strut, Monotube, Polyurethane Bushings, 24.840 in. Extended Length, 14.820 in. Collapsed Length, Each
Part Number: SJA-M9558
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Engine Gasket Sets, Full, Jeep, 4.0L, Kit
Part Number: FEL-260-1998
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Axle Bearing, Outer, Rear, Seal, Retaining Ring, Dana 35, Dana 44, Jeep, Kit
Part Number: CWA-D44JKBK
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Hub Adapter, 6-Bolt (Black); 1969-1989 GM Deluxe Wood Wheel Adapter
Part Number: VAT-SWA1002BLK
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Water Pump, Mechanical, Aluminum, High Volumn, Natural, Jeep, 4.0L, Each
Part Number: GMB-110-1080P
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cylinder Head Bolts, High Performance Series, Hex, Chromoly, Black Oxide, Washers, Jeep, L6, 2 Lengths, With 4.0 Head, Kit
Part Number: ARP-146-3603
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Automatic Shift Kit, 45RFE, 545RFE, 68RFE, Chrysler, Dodge, Jeep, Ram, Kit
Part Number: TRG-SK45RFE
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Fuel Injector, O-rings, Chrysler, Dodge, Jeep, Ram, Each
Part Number: CWA-5037479AA
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Spark Plug Wires, Blue Streak, Street, Spiral Wound, 8.5mm, Black, V8, Set
Part Number: SMP-10008
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Automatic Transmission Pan, Stock Style, Steel, Zinc Finish, AW4, Jeep, Each
Part Number: CWA-83504037
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Wheel, 85 Series, Steel, Black, 15 in. x 10 in., 5 x 5.50 in. Bolt Circle, 4.00 in. Backspace, Each
Part Number: VSW-85H5185NS
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Brake Pads, Brembo, NAO Ceramic, Integrally Molded, Shims, Cadillac, Set
Part Number: BBO-P11024N
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Windshield Wiper Motor, Front, Jeep, Each
Part Number: CWA-J0978529
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Hood Prop Rod, Stainless Steel, Polished, Jeep, Each
Part Number: KTL-30523
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Spark Plug Wires, ThunderVolt, Spiro-Wound, 8.2mm, Red, 135/180 Boots, Jeep, 4.0L, L6, Set
Part Number: TAY-84249
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Coupling, Quick-Drain Oil Pan, Gasket, Full Flow Female Half, Fits All Thread Sizes, Each
Part Number: AER-FBM3117
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Spark Plug Wires, SuperStock, RFI Suppression, Spiral Core, 8mm, Blue, Straight Boots (Blue/Black), V8, Set
Part Number: ACC-4040B
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Rod Bearings, Direct Replacement,Tri-Metal, TM-77, Set of 8
Part Number: CLE-CB1808P8
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Manual Transmission Replacement Part, Input Shaft Retainer, Steel, NSG370 Only, Dodge, Jeep, Each
Part Number: CWA-5159176AA
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Brake Pads, Street Warrior, D1053, Carbon Fiber Ceramic, Z26, Integrally Molded With Shims, Rear, Dodge, Jeep, Set
Part Number: PWR-Z26-1053B
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Shocks/Struts, B6 4600 Series, Monotube, Jeep, Rear, Each
Part Number: BSN-24-225427
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Floor Pan, Steel, Black, Drivers Side, Front, Jeep, JK, Each
Part Number: KPT-0487-221
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.