Availability
The El Camino of the Jeep family, the CJ-8—more affectionately known as the Scrambler—was produced from 1981 to 1986, combining Jeep and pickup truck in...
The El Camino of the Jeep family, the CJ-8—more affectionately known as the Scrambler—was produced from 1981 to 1986, combining Jeep and pickup truck in ways that escape most mortal understanding. Featuring an extended wheelbase and pickup truck bed, the CJ-8 Scrambler combined the best performance capabilities of Jeep’s CJ line with the utility and head-turning looks of a truck. Summit Racing is your low price leader for Jeep CJ-8 Scramber OEM and aftermarket parts, including parts for your engine, drivetrain, exhaust, steering, brake system, suspension, interior, and exterior, as well as towing equipment,...
The El Camino of the Jeep family, the CJ-8—more affectionately known as the Scrambler—was produced from 1981 to 1986, combining Jeep and pickup truck in ways that escape most mortal understanding. Featuring an extended wheelbase and pickup truck bed, the CJ-8 Scrambler combined the best performance capabilities of Jeep’s CJ line with the utility and head-turning looks of a truck. Summit Racing is your low price leader for Jeep CJ-8 Scramber OEM and aftermarket parts, including parts for your engine, drivetrain, exhaust, steering, brake system, suspension, interior, and exterior, as well as towing equipment, wheels, and tires. Share the joy of Summit Racing with your Scrambler today.
Alternator, Internal Regulator, 150 Amp, Chrome Plated, Buick, Oldsmobile, Pontiac, Chevy, GMC, Each
Part Number: PWM-37293
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
BUILD IT WITH SUMMIT!
Headlight Assembly, Sealed LED Headlight, High/Low Beam Only, 7.00 in, Clear Fluted Glass Lens, Black Housing, Round, Each
Part Number: SUM-RP22677
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Wiring Harness, 21-Circuit, Direct Fit, Jeep, CJ, Kit
Part Number: PRF-10150
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Tire, Star Series, 235/75-15, Radial, 3.125 in. Wide Whitewall, T Speed Rating, Each
Part Number: COK-737115
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Alternator, Internal Regulator, 100 Amp, Natural, AMC, Buick, Oldsmobile, Pontiac, Chevy, GMC, Each
Part Number: PWM-7294
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Coolant Additive, Water Wetter, 12 fluid oz., Each
Part Number: RED-80204
Cannot be shipped Internationally
Cannot be shipped Internationally
On-Board Air Compressor, WirelessAir, EZ Mount, Wireless Control, Kit
Part Number: AIR-74000EZ
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Alternator, Internal Regulator, 100 Amp, Chrome Plated, Buick, Oldsmobile, Pontiac, Chevy, GMC, Each
Part Number: PWM-17294
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Thermostat, 180 Degree, High-Flow, Bypass Valve, Copper/Brass, Stainless Body, Each
Part Number: SUM-359-180
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Radiator, Classic OEM, Downflow, Copper/Brass, Black, 3-row, Jeep, Each
Part Number: SUM-382008
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Tire, Star Series, 235/75-15, Radial, 1.600 in. Narrow Whitewall, 480 A A UTQG Rating, T Speed Rating, 2,271 lb Load, Each
Part Number: COK-738110
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Oil Filter Relocation Kit, Single Filter, 96 in. Hose Length, Kit
Part Number: SUM-G4985-1
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Radiator, Classic OEM, Downflow, Copper/Brass, Black, 2-Row, Jeep, Each
Part Number: SUM-382007
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Injection Systems, Sniper EFI, BBD, Throttle Body, Shiny, BBD Flange, Injectors, Fuel Pump, Regulator, Harness, Tuner, Jeep, CJ5, CJ7, 4.2L, Kit
Part Number: SNE-550-858K
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Differential, Eaton Detroit Truetrac, Limited Slip, 30-Spline, 3.73:1 and Down Only, Dana 44, Each
Part Number: ETN-913A589
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Gear Lube, Transmission Fluid and Gear Oil, 75W90, Limited Slip, Synthetic, 1 qt., Each
Part Number: RED-57904
Cannot be shipped Internationally
Cannot be shipped Internationally
Starter, XS Torque, Mini, American Motors, Jeep, Each
Part Number: PWM-9515
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Steering Wheel Installation Kit, 3-Bolt Mount, Matte Black, Aluminum, AMC, GM, Mopar, Jeep, Kit
Part Number: GRT-3196
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Thermostat, 160 Degree, High-Flow, Bypass Valve, Copper/Brass, Stainless Body, Each
Part Number: SUM-359-160
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Injection Systems, Sniper EFI, BBD, Throttle Body, Natural Finish, BBD Flange, Injectors, Regulator, Harness, Tuner, Jeep, CJ5, CJ7, 4.2L, Kit
Part Number: SNE-550-858
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Wheel, Indy U101, Aluminum, Polished, 15 in. x 8 in., 5 x 5.50 in. Bolt Circle, 4.00 in. Backspace, Each
Part Number: USM-U10115808540
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Gear Lube, MTL Transmission Gear Oil, 75W80, Synthetic, 1 qt., Each
Part Number: RED-50204
Cannot be shipped Internationally
Cannot be shipped Internationally
Torque Converter, Tork Master, 2,300-2,500 rpm Stall Range, Mopar, Torqueflite 727, Each
Part Number: BMM-10417
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Differential, Electronic Locker, ELocker, 27-Spline, Dana 30, 3-Series, Each
Part Number: ETN-19818-020
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Lug Nuts, Conical Seat, 1/2 in. x 20 RH, Closed End, Chrome Plated Steel, Set of 4
Part Number: MCG-64000
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.