Selected Filters


Loading...

Availability


JEEP COMANCHE Ignitions & Electrical

Individual Parts

Results 1 - 11 of 11

Spark Plugs, Shorty, Tapered Seat, 14mm Thread, .460 in. Reach, Projected Tip, Resistor, Set of 4

Part Number: ACC-0576S-4

4.78 out of 5 stars ( 125 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Ignition Coil, Blaster, E-Core, Performance Replacement, Square, Epoxy, Red, 44,000 V, GM, Each

Part Number: MSD-8226

4.45 out of 5 stars ( 80 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Spark Plug Wires, Super Conductor, Spiral Core, 8.5mm, Red, Multi-Angle Boots, Universal, L6/V6, Set

Part Number: MSD-31179

4.11 out of 5 stars ( 9 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Ignition Coil, Blaster Performance Replacement, E-Core, Square, Epoxy, Red, 40,000 V, Each

Part Number: MSD-8228

4.38 out of 5 stars ( 73 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Ignition Coil, Super Coil, Canister, Rectangle, Oil-Filled, Yellow/Brown, 45,000 V, Each

Part Number: ACC-140001

4.14 out of 5 stars ( 36 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Ignition Coil, Electronic Super Coil, Square, Epoxy, Yellow, 42,000 V, 1993-97 Dodge, Jeep, Each

Part Number: ACC-140021

4.41 out of 5 stars ( 102 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Ignition Coil, Remote HEI Super Coil, E-core, Square, Epoxy, Black/Yellow, 48,000 V, GM, Isuzu, Jeep, Each

Part Number: ACC-140011

4.52 out of 5 stars ( 50 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Ignition Coil, Street Fire, E-Core, Square, Epoxy, Red, 43,000 V, GM, Each

Part Number: MSD-5526

4.51 out of 5 stars ( 55 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Spark Plug Wires, Super Conductor, Spiral Core, 8.5mm, Red, Multi-Angle Boots, Universal, L4, Set

Part Number: MSD-31159

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Distributor Cap, Male/HEI-Style, Black, Screw-Down, Jeep, 4.0L, Kit

Part Number: ACC-120330

5.0 out of 5 stars ( 13 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Alternators, GM 10SI/10DN/12SI Case, 12 V, 140 amps, V-belt Pulley, Buick, Cadillac, Chevrolet, GMC, Jeep, Oldsmobile, Pontiac, Each

Part Number: MRG-51203NG

Not Yet Reviewed

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

  • 1
  • Page 1 of 1