Availability
Showing In Stock Items. Show All 61 Items.
5.7 Pro Hemi Truck 2 Hydraulic Roller Cam, 212/218 Duration @.050, 111.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 1800-6200 Range, Each
Part Number: SUM-5722
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
BUILD IT WITH SUMMIT!
Pro Hemi Supercharged 6 Cam, MDS Delete, Phaser Limited or Delete, 232/248 Duration @.050, 120 LSA + 4 adv, .625/.625 Lift, 3400-7500 Range, Each
Part Number: SUM-5719
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
5.7 Pro Hemi Truck 1 Hydraulic Roller Cam, 206/212 Duration @.050, 110.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 1600-6000 Range, Each
Part Number: SUM-5721
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
6.4 Pro Hemi Truck 3 Hydraulic Roller Cam, 218/224 Duration @.050, 112.5 LSA + 3.5 adv, .585/.540 Lift No Springs Required, 2200-6400 Range, Each
Part Number: SUM-5727
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
5.7 Pro Hemi Truck 3 Hydraulic Roller Cam, 218/224 Duration @.050, 112.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 2200-6400 Range, Each
Part Number: SUM-5723
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Pro Hemi 218 Long-runner Cam, MDS Delete, Phaser Limited or Delete, 218/224 Duration @.050, 114.5 LSA + 1.5 adv, 600/.585 Lift, 2900-6400 Range, Each
Part Number: SUM-5713
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Control Arm, Rear Upper, Fully Adjustable Style, Steel, Black E-coat, Dodge, Jeep, Mitsubishi, Each
Part Number: SPS-67455
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Door Storage Hanger, Adjustable, Steel, Black, Jeep, Each
Part Number: SUR-DH1002
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Ring and Pinion Gears, 3.07:1 Ratio, 26-spline, Standard Rotation, Installation Kit, Front, Dana 30, Jeep, Kit
Part Number: CWA-5072997AB
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Step Bars, Retractable, Rockguard, Steel, Textured Black Powdercoated, 2 in. Diameter, Jeep, Pair
Part Number: RPE-88732
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Taillight Covers, Horizontal Slot, Smoke, Jeep, Kit
Part Number: AVS-36143
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Oil Filter, Heavy-Duty, Cartridge Style, Each
Part Number: FRM-C3P
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Air Intake Kit, PowerCore, Polyethylene Tube, Black, Synthetic Filter, Blue, Jeep, 3.8L, Kit
Part Number: CSE-44411
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Shock Absorber, B8 5160 Series, Rear, Jeep, Each
Part Number: BSN-25-304893
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
VALVE-INTAKE
Part Number: MEL-V1082
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Wheel Housings, JL Front Inner Fenders, Left and Right, Aluminum, Natural, Vented Design with Cutouts for Coil Spring, Jeep, Pair
Part Number: RTE-JL5106
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Catalytic Converters, Universal, 2.25 in. Slip Fit Inlet/Outlet, 16.00 in. Length, for use on Honda®, for Hyundai, Chrysler, Dodge, Ford, Jeep, Each
Part Number: APH-608745
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Weatherstrip Seal, SUPERsoft, Doors, Jeep, Each
Part Number: MMP-LM97
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Suspension Lift, Spacers, 2.0 in. Front, 1.0 in. Rear, Jeep, Kit
Part Number: TFY-42005
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Oil Pickup, Bolt-In, Stock Pan Style, 0.750 in. Tube Diameter, Mopar, V8, Modular, 4.7L, Each
Part Number: MEL-320S
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Piston Rings, 3.125 in. Bore, 3/32 in., 3/32 in., 3/16 in. Thickness, Jeep, 2.2L, Set
Part Number: CWA-J0941885
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Coil on Plug Boots, Springs, Dodge, Jeep, 5.7L, Set of 8
Part Number: SUM-850554
Not Yet Reviewed
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Weatherstrip, Door Window Felts, Jeep, Inner, Outer, Quarter Window, Set of 4
Part Number: FCD-KD2026
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Spark Plug Wires, Assembled, 7.00mm, Spiral Core, Gray, Jeep, 2.5L, Set
Part Number: CWA-83502400
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Piston, Cast, Dodge, Jeep, 4.7L, Each
Part Number: SLP-WH883CP
Estimated Ship Date: Monday 1/19/2026
Estimated Ship Date: Monday 1/19/2026
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.