Availability
JEEP 4.0L/242 Parts and Accessories
Fuel Pump, Fuel Pump Module Assembly, Electric In-tank, Stock psi, 12 V, Sending Unit, Jeep, Each
Part Number: DFP-HP10147
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Ball Joint Kit (Upper Per Side) - Dana 30
Part Number: SDH-40916
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Shock Absorber/Strut, Black MAX, Twin-Tube, Includes Black Boot, Each
Part Number: SJA-B8525
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Electric Fan, Single, 12 in. Diameter, Reversible, 800 cfm, Black, Plastic, Each
Part Number: HDA-3680
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Power Steering Pulley, GM Type 2, TC Series, Underdrive, Serpentine, Billet Aluminum, Black Powdercoated, 5.500 in. O.D., 0.660 in. I.D., Jeep, Each
Part Number: PFN-PP2402
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft Position Sensor, Jeep, 4.0L, Each
Part Number: RNB-689-200
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Shock Absorber, RS5000X, Twin-Tube, Gas Charged, Includes Red Boot, Each
Part Number: RAN-RS55245
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Axle Bearing, Outer, Rear, Seal, Retaining Ring, Axle Retainer, Dana 44, Jeep, Kit
Part Number: CWA-D44TJBK
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Ball Joint Kit - Upper/Lower (One Side)
Part Number: SDH-707488X
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Sensor, Crankshaft Position, Jeep, 4.0L, Each
Part Number: CWA-56027866AE
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Electric Fan, 16 in. Diameter, Reversible, 1,400 cfm, Black, Plastic, Each
Part Number: FSS-36898
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Shock Absorber, RS5000X, Twin-Tube, Gas Charged, Includes Red Boot, Each
Part Number: RAN-RS55129
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Catalytic Converters, Stainless Steel Case, 2.25 in. Slip Fit Inlet/Outlet, 14.00 in. Overall Length, Audi, Chevy, Chrysler, Ford, Jeep, Toyota, Each
Part Number: APH-602205
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Evaporator Core, OEM Replacement, Aluminum, Natural, Jeep, Each
Part Number: FSS-54188
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Shock, SX8000, Twin-Tube, 26.5 in. Extended, 16.0 in. Collapsed Lengths, Stud, Eyelet, Each
Part Number: TFY-61262
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Seal, Axle Tube, Red, Dana 30, Dana 44, Jeep, Pair
Part Number: MGR-MG21102
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Fuel Regulator & Filter, Silver, Metal & Plastic, Use Existing Hardware
Part Number: CWA-4798301
Shock/Strut, Hydro 7000, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SJA-H7018
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Shock Absorber, RS5000X, Twin-Tube, Gas Charged, Includes Red Boot, Each
Part Number: RAN-RS55241
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Shock, SX6000, Twin-Tube, 26.5 in. Extended, 16.0 in. Collapsed Lengths, Eyelet, Eyelet, Each
Part Number: TFY-62261
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Transmission Oil Cooler, Rapid-Cool, Aluminum, Black, Plate Style, 3/8 in. Hose Barb, Each
Part Number: FSS-53007
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Brake Rotor, Replacement, Solid, Solid Surface, Steel, Zinc Plated, Jeep, Rear, Each
Part Number: TSB-23007AB1A
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Tie Rod End, Heavy-Duty, Right Hand Outer, Straight, Male, Greasable, Jeep, Each
Part Number: RKJ-CE-9701TRR
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Shock/Strut, Nitro 8000, Twin-Tube, Red Polyurethane Bushings, Includes Red Boot, Each
Part Number: SJA-N8012
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Piston Rings, Moly, 3.935 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 6-Cylinder, Set
Part Number: SLP-E-234K60
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster