Availability
JK 1 Ton 14 Bolt 60 Tooth Tone Ring
Part Number: RTE-BB1403
Not Yet Reviewed
Estimated Ship Date: Dec 17, 2025 if ordered today
Estimated Ship Date: Dec 17, 2025 if ordered today
Fan Clutch, Heavy-Duty, Thermal, Counterclockwise Rotation, Jeep, Each
Part Number: FSS-46047
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Main Bearings, SI-Series, Silicon Aluminum, 0.25mm. Crankshaft Undersize, Chrysler, Dodge, Plymouth, 3.3L, Set of 4
Part Number: KGB-MB4060SI025
Not Yet Reviewed
Estimated Ship Date: Feb 5, 2026 if ordered today
Estimated Ship Date: Feb 5, 2026 if ordered today
Ignition Lock Cylinder, Uncoded, Chrysler, Dodge, Jeep, Kit
Part Number: CWA-5179511AA
Not Yet Reviewed
Estimated Ship Date: Feb 2, 2026 if ordered today
Estimated Ship Date: Feb 2, 2026 if ordered today
Accessory Drive Belt, Serpentine, Jeep, 3.8L, Each
Part Number: CWA-53032857AB
Not Yet Reviewed
Estimated Ship Date: Feb 2, 2026 if ordered today
Estimated Ship Date: Feb 2, 2026 if ordered today
Accessory Belt Tensioner, Smooth Pulley, Jeep, 3.8L, Each
Part Number: CWA-53032860AA
Not Yet Reviewed
Estimated Ship Date: Feb 2, 2026 if ordered today
Estimated Ship Date: Feb 2, 2026 if ordered today
Timing Belt, European Models, 2.8L VM Motori Diesel Engines, Each
Part Number: CWA-68029524AA
Not Yet Reviewed
Estimated Ship Date: Feb 2, 2026 if ordered today
Estimated Ship Date: Feb 2, 2026 if ordered today
Sensor, Oxygen, 4-wire, Thread-in, Chrysler, Dodge, Jeep, Each
Part Number: CWA-56029085AA
Not Yet Reviewed
Estimated Ship Date: Feb 2, 2026 if ordered today
Estimated Ship Date: Feb 2, 2026 if ordered today
Ball Joints, Front, One Upper, One Lower, Jeep, Kit
Part Number: CWA-68004085AA
Not Yet Reviewed
Estimated Ship Date: Feb 2, 2026 if ordered today
Estimated Ship Date: Feb 2, 2026 if ordered today
Spark Plug Wires, Assembled, 7.00mm, Spiral Core, Black, Jeep, 3.8L, Set
Part Number: CWA-68017712AB
Estimated Ship Date: Feb 2, 2026 if ordered today
Estimated Ship Date: Feb 2, 2026 if ordered today
Spark Plug Wire Sets, High Energy, Assembled, Spiral Core, Blue Wire, 8.00mm Diameter, Jeep, 3.8L, Set
Part Number: TAY-64618
Not Yet Reviewed
Estimated Ship Date: Nov 25, 2025 if ordered today
Estimated Ship Date: Nov 25, 2025 if ordered today
Spark Plug Wire Sets, Spiro-Pro, Assembled, Spiral Core, Red Wire, 8.00mm Diameter, Jeep, 3.8L, Set
Part Number: TAY-74218
Not Yet Reviewed
Estimated Ship Date: Nov 25, 2025 if ordered today
Estimated Ship Date: Nov 25, 2025 if ordered today
Sensor, Crankshaft Position, Chrysler, Dodge, Jeep, Each
Part Number: CWA-5029811AC
Not Yet Reviewed
Estimated Ship Date: Feb 2, 2026 if ordered today
Estimated Ship Date: Feb 2, 2026 if ordered today
A/C System Repair Kit
Part Number: UAC-AK1660
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
A/C Service Kit, Block Type Expansion with Insert O-ring Inlet and Outlet, Filter Drier with Pad Mount Fittings, PAG 46 Oil, R-134A, Jeep, 3.8L, Kit
Part Number: FSS-20280SK
Not Yet Reviewed
Estimated Ship Date: Nov 28, 2025 if ordered today
Estimated Ship Date: Nov 28, 2025 if ordered today
Rod Bearings, AM-Series, Alecular Silicon. 0.50mm. Crankshaft Undersize, Chrysler, Dodge, Plymouth, Set of 6
Part Number: KGB-CR6675AM05
Not Yet Reviewed
Estimated Ship Date: Feb 6, 2026 if ordered today
Estimated Ship Date: Feb 6, 2026 if ordered today
Rod Bearings, AM-Series, Alecular Silicon. 0.75mm. Crankshaft Undersize, Chrysler, Dodge, Plymouth, Set of 6
Part Number: KGB-CR6675AM075
Not Yet Reviewed
Estimated Ship Date: Feb 6, 2026 if ordered today
Estimated Ship Date: Feb 6, 2026 if ordered today
JK 1 Ton Sterling ABS Mounting Plates (99 - 04 Superduty)
Part Number: RTE-BB1055
Not Yet Reviewed
Estimated Ship Date: Dec 18, 2025 if ordered today
Estimated Ship Date: Dec 18, 2025 if ordered today
Tie Rod End, Left Hand Outer, Bent, Male, 11 in. Length, Jeep, Each
Part Number: CWA-52060053AE
Not Yet Reviewed
Estimated Ship Date: Feb 2, 2026 if ordered today
Estimated Ship Date: Feb 2, 2026 if ordered today
ABS Tone Ring, 60-Tooth, Sensor Plate Mounts, Steel, Jeep, Ford Sterling 1-Ton Swap, Kit
Part Number: RTE-BB1053
Not Yet Reviewed
Estimated Ship Date: Dec 18, 2025 if ordered today
Estimated Ship Date: Dec 18, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.