Availability
Timing Chain and Gear Set, Link Belt, Steel Sprockets, Chrysler, Dodge, Jeep, V8, 5.7L, 6.1L, Set
Part Number: MEL-3-704S
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Rocker Arms, Non-roller, Steel, Natural, Stud Mounting Style, Pivots, Bridges, Jeep, 4.0L, 4.2L, Kit
Part Number: CWA-3242393K
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Adapter, Oil Filter Bypass, Spin-On, Aluminum, Black, 3/4-16 in. Thread, 1/2 in. NPT Inlet/Outlet, Each
Part Number: EAR-1178ERL
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Idler Pulley, Serpentine, Steel, Black, Each
Part Number: DAC-89007
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Main Bearings, Standard Size, Tri Metal, 1/2 Groove, AMC, 290, 304, 343, 360, Set of 5
Part Number: SLP-5037M
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Oil Filter, Performance Gold, Canister, 4.78 in. Tall, 3.00 in. Diameter, 13/16 in.-16 Thread, Anti-Drainback, Spin-On, Each
Part Number: KNN-HP-2006
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Rocker Arm, OHC Shaft Mount, Roller Fulcrum, Steel, Black Oxide, Chrysler, Dodge, Jeep, Mitsubishi, Ram, Each
Part Number: MEL-MR-1345
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Valve Cover, Perimeter Bolt Mounting, Stock Height, Cast Aluminum, Natural, 4.2L Top Style, Jeep, 4.2L, Each
Part Number: RTO-RT35004
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Oil Pan, Steel, Black, Jeep, 304, 360, 401, Each
Part Number: CWA-J3236322
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Pushrods, Assembled, 5/16 in., Steel, Ball/Ball, 8.085 in. Length, Chrysler, Dodge, Jeep, Each
Part Number: MEL-MPR-668
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Rebuild Kit, Oil Pump, AMC, Jeep, 290-401, V8, Kit
Part Number: MEL-K-85
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cylinder Head Bolts, High Performance Series, Hex, Chromoly, Black Oxide, Washers, Jeep, L6, 2 Lengths, With 4.0 Head, Kit
Part Number: ARP-146-3603
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Oil Filter, Extra Guard, 13/16-16 in. Thread, 4.050 in. High, Each
Part Number: FRM-PH25
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Main Bearings, H Series, 1/2 Groove, Standard Size, Tri Metal, Chrysler, Dodge, Jeep, 5.7L, Set of 5
Part Number: CLE-MS2220H
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Lifter, Hydraulic Flat Tappet, AMC/Chrysler, Dodge, Jeep, Plymouth, Each
Part Number: SLP-HT-2011R
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Oil Filter, Canister, 22mm x 1.5 Thread, 3.350 in. High, common on 2007+ LS, Each
Part Number: SUM-127001
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Valve, Exhaust, 1.551 in. Head Diameter, 7.95mm Stem Diameter, 5.138 in. Overall Length, Chrysler, Dodge, Jeep, Ram, Each
Part Number: MEL-V3195
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Timing Cover, One-piece, Steel, Natural, Jeep, 5.0L, 5.9L, Each
Part Number: CWA-J8129373
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Oil Filter, High Performance, Black, Each
Part Number: DCC-P4452890
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Pulley, Power Steering, Saginaw, V-Belt, 2-Groove, Keyway, Steel, Black, 5.800 in. Diameter, Each
Part Number: LSC-163
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Filter, Engine Oil, OEM Replacement, Chrysler, Dodge, Jeep, Plymouth, Each
Part Number: MOP-05281090AB
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cam Bearings, B-1, VVT Camshaft, Mopar 5.7L, 6.4L, Set
Part Number: CLE-SH2191S
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Piston Rings, Phosphate Coated, 4.000 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: HSN-139
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Main Bearings, P Series, Standard Size, TM-77, AMC, 6-Cylinder, Set
Part Number: CLE-MS1947P
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Alternator Brackets, Gen III Hemi, Alternator Relocation, Steel, Black, Cylinder Head Mount, Hardware included, Chrsyler, Dodge, Jeep, 5.7-6.4L, Each
Part Number: HLY-97-347
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.